26.8 C
Singapore
Wednesday, April 30, 2025
spot_img

Notices of Huizhou Port to the Masters and Ship Operators

Must read

  • Channel Dredging Operations (2024-2025)
    • Updated Depths:
      Channel Segment Current Depth (m CD) Target Depth Completion
      Main Channel (North) -20.5 -22.0 Q4 2024
      West Approach -17.2 -18.0 30 Sep 2024
      Oil Terminal Access -19.8 -21.0 31 Mar 2025
    • New Monitoring Systems:
      • Real-time depth sensors at 500m intervals (displayed on VTS)
      • Turbidity monitoring buoys (max 50 NTU threshold)
      • Automated siltation alerts via AIS Message 21
    • Navigation Protocols:
      • Daylight transit only for vessels >250m LOA
      • Mandatory use of convoys during spring tides (≥3.5m range)
      • Updated chartlet available at www.huizhouport.gov.cn/dredge2024

 

 

  • Pilotage Requirements
    • Tidal Restrictions:
      Vessel Type Min Depth Required Tide Window Max Current
      VLCC (>200,000 DWT) 19.5m +2hr to -1hr HW 1.8 knots
      Capesize Bulk 18.0m ±3hr HW 2.5 knots
      LNG Carrier 20.0m +1hr to -0.5hr HW 1.5 knots
    • New Equipment Requirements:
      • Pilot ladder illumination (min 50 lux)
      • VHF CH14/16 dual watch capability
      • Electronic chart synchronization (S-57/S-63)
    • Emergency Procedures:
      • Abort boarding if wind >25 knots (Beaufort 6)
      • Alternative boarding position at 22°36’42″N 114°47’18″E

 

 

  • Dangerous Goods Handling
    • IMDG Class Restrictions:
      Class Daytime Only Quarantine Distance Special Requirements
      1 (Explosives) Yes 500m Armed guards
      2.3 (Toxic Gas) No 300m Gas detectors
      4.3 (Water Reactive) Yes 200m Double containment
      5.1 (Oxidizers) Yes 100m No organic materials
    • Documentation Updates:
      • DG Declaration Form HZ-DG-2024 (digital submission)
      • Emergency response plan must include:
        • Site-specific weather contingency
        • Nearest hospital contacts
        • Antidote inventory

 

 

  • Bunker Operations
    • Mass Flow Meter Standards:
      Parameter Specification Tolerance
      Accuracy ±0.5% of reading ISO 22192
      Temperature -20°C to +150°C ±0.5°C
      Pressure 0-16 bar ±0.1 bar
    • New Safety Measures:
      • Static electricity monitoring (<10 mJ ignition energy)
      • Double valve isolation at manifold
      • Vapor return lines mandatory for >500mt transfers

 

 

  • Port Security
    • Cyber Drill Requirements:
      Drill Type Frequency Duration Participants
      Phishing Attack Quarterly 2 hours All bridge officers
      Ransomware Biannual 4 hours Engineering team
      GPS Spoofing Annual 6 hours Navigation officers
    • Physical Security Updates:
      • Biometric access control (fingerprint + retina scan)
      • Drone detection radar coverage (5km radius)
      • Underwater sonar for diver detection

 

 

  • Mooring Standards
    • Synthetic Rope Exception:
      • Permitted at Container Terminal 3 only
      • Minimum diameter 80mm
      • UV protection sleeve mandatory
      • Max allowable elongation 15%
    • New Inspection Criteria:
      • Magnetic particle testing for bollards (every 2 years)
      • 3D laser scanning of fairleads
      • Dynamic load testing at 110% SWL

 

 

  • Waste Management
    • New Treatment Requirements:
      • 5μm filtration for bilge water
      • Microplastic capture systems for laundry discharge
      • Food waste pasteurization (70°C for 1 hour)
    • Documentation:
      • Waste tracking blockchain system (access via PortNet)
      • Digital scale calibration certificates

 

 

  • Emergency Response
    • Medical Evacuation:
      Case Type Response Time Facility Helicopter Pad
      Cardiac ≤30min Huizhou Central Hospital HZ-MED1
      Chemical Burn ≤45min Guangdong Poison Center HZ-MED2

 

 

  • Weather Procedures
    • Lightning Precautions:
      • Suspend operations when <5km strikes detected
      • Disconnect shore power during thunderstorms
      • Static discharge cables for tankers

 

 

  • Crew Changes
    • Health Protocols:
      • Mandatory vaccinations:
        • Yellow Fever (valid 10 years)
        • COVID-19 (WHO EUL listed)
        • Meningococcal (valid 5 years)

 

 

  • Port Dues
    • Green Incentives:
      Initiative Discount Verification
      Shore Power Use 15% Power meter logs
      Carbon Offset 10% IMO DCS Report
      Zero Discharge 5% Waste manifests
  • Ballast Water Management (Complete Regulations)

 

  • Approved Treatment Systems:
    System Type IMO Approval China MSA Certification Maintenance Interval
    UV-Based IMO BWMS Code Type A GB 17422-2024 Class I Quarterly lamp replacement
    Electrochlorination IMO BWMS Code Type B GB 17422-2024 Class II Monthly electrode inspection
    Deoxygenation IMO BWMS Code Type C GB 17422-2024 Class III Bi-annual membrane test

    • Port State Control Sampling:
      1. Sampling Points:
        • Overboard discharge line (primary)
        • Ballast pump suction (secondary)
        • Representative tank access point (tertiary)
      2. Testing Methods:
        Parameter Method Threshold
        Viable Organisms ≥50μm Microscopy (IMO G2) <10 organisms/m³
        E. coli ATP bioluminescence <250 cfu/100ml
        Turbidity Nephelometric (ISO 7027) <5 NTU above ambient

    • Special Areas:
      • Mandatory Exchange Zones:
        1. South China Sea Protected Area (within 50nm of Hainan Island)
        2. Pearl River Estuary (within 22°30’N – 22°45’N)
      • Exchange Requirements:
        • 95% volumetric exchange
        • Minimum 200nm from nearest land
        • Depth ≥200m during exchange

    • Recordkeeping:
      • Ballast Water Record Book:
        • Entries must include:
          1. Date/time/location of uptake
          2. Treatment method (UV dose/chlorine residual/etc.)
          3. Salinity/temperature at discharge
        • Digital logs require:
          • IMO-compliant timestamp (UTC)
          • Chief Officer’s electronic signature
          • Automated backup to ship’s VDR

    • Contingency Measures:
      Situation Action Required Reporting Deadline
      System Failure
      1. Switch to backup system
      2. If unavailable, retain ballast
      3. Seek port approval for discharge
      1 hour after detection
      Non-compliant Discharge
      1. Stop discharge immediately
      2. Collect 3 samples for lab analysis
      3. Initiate tank cleaning
      Immediate (VHF CH14)

  • Enforcement Penalties:
    Violation Fine (USD) Detention Criteria
    Missing Records 5,000 ≥3 missing entries
    Unauthorized Discharge 50,000 Any willful violation
    Tampered Samples 100,000 Automatic detention

Ballast Water Compliance Checklist

Item Verification Method Reference
UV Intensity Logs ≥30 mJ/cm² at all flow rates Manufacturer’s manual
Residual Chlorine 0.1-0.5 mg/L (if applicable) IMO BWM.2/Circ.61
Crew Training Annual drills documented ISM Code Ch.6

Official References

  • Primary Regulations:
    • IMO BWM Convention (2004) – D-2 Standard
    • China MSA Notice [2024] No.12 (Special Areas)
    • Huizhou Port Administration Regulation 8-2024 (Sampling)
  • Testing Standards:
    • ISO 11711:2019 (Ballast water sampling)
    • APHA 9215D (Microbial analysis)

  • Cyber Security Mandates
    • Implementation Timeline:
      1. Phase 1 (by 31 Dec 2024):
        • Network segmentation between OT/IT systems (IEC 62443-3-3 certified)
        • 24/7 monitoring of bridge networks with:
          • SIEM system (minimum 90-day log retention)
          • Automatic alerting to China MSA Cyber Command
        • Annual penetration testing (CCS or DNV certified auditors)
      2. Phase 2 (by 30 Jun 2025):
        • Mandatory cyber security officer certification (IMO Model Course 12.34)
        • Real-time threat reporting to Huizhou MSA via:
          • API integration with ship’s ECDIS
          • Dedicated VSAT channel (Inmarsat Fleet Secure)
    • Technical Standards:
      System Standard Verification
      Network Switches IEC 61162-460 hardened MAC address lockdown
      Firewalls DNV GL Cyber Secure Level 2 Rule set review quarterly

  • Emission Control Area (ECA) Requirements
    • Fuel Sampling Protocol:
      1. Three-point sampling:
        • Manifold (immediate pre-combustion)
        • Daily service tank
        • Settling tank (bottom sample)
      2. Sealing with MSA tamper-proof tags (serial recorded in logbook)
    • Scrubber Monitoring:
      • Continuous pH monitoring (range 6.5-8.5)
      • Overboard sensors:
        • Turbidity <25 FNU
        • Polycyclic Aromatic Hydrocarbons <50 μg/L

  • Ballast Water Management
    • Treatment System Calibration:
      Component Frequency Tolerance
      UV Intensity Sensors Monthly ±5% of factory setting
      Flow Meters Quarterly ±2.5% accuracy
    • High-Risk Zones:
      • Mandatory ballast exchange >200nm from:
        • Great Barrier Reef (AUS)
        • Galapagos Islands (ECU)
        • Hainan Island (CHN)

  • Port Services
    • Approved Providers:
      Service Provider Certification
      Underwater Inspection Huizhou DiveSafe Ltd. IMCA D014 compliant
      Tank Cleaning Guangdong TankCare OCIMF TMSA Level 3

  • Compliance Verification
    • Pre-Arrival Checklist:
      1. Confirm all certificates are valid and original copies available:
        • International Air Pollution Prevention (IAPP) Certificate
        • Ballast Water Management Certificate
        • Cyber Security Management Plan approval stamp
      2. Verify critical equipment functionality:
        • VDR annual test report (including GPS input verification)
        • EGCS data recording for last 12 months
        • Emergency towing arrangements (SWL ≥200t)
    • Port State Control Focus Areas:
      • Fuel oil sampling (3 locations with MSA witness)
      • Ballast water quick testing (ATP luminescence <50 RLU)
      • Cyber security drill records (minimum 3 scenarios in last 6 months)

Operational Warnings

  • New Obstruction: Submerged pipeline at 22°39’18″N 114°42’06″E (marked by yellow special buoy HPX1 with Racon ‘X’)
  • Radio Silence: Maintain VHF CH16 silence within 1nm of LNG terminal during transfer operations (fines up to $10,000)
  • Training Deadline: All bridge teams must complete Huizhou ECDIS training (certificate HZ-ECDIS-2024) by 31-Dec-2024

Appendix A – Master’s Verification Checklist:

Item Verified By Date Remarks
Cyber Security Phase 1 implemented Chief Engineer IEC 62443-3-3 cert attached
Ballast Water Treatment calibrated 2nd Officer Last calibration date:
New pipeline coordinates entered in ECDIS Navigation Officer Cross-checked with Notice to Mariners
spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article