1. Port Overview and Navigation Characteristics
Changshu Port (31°38’N 121°10’E) is a Class I open port certified under GB/T 27901-2021, comprising three main operational areas:
- Changshu New Port Area (31°40’N 121°08’E)
- 4 berths for vessels up to 50,000 DWT
- Design depth: -12.5m CD
- Changshu Economic Zone Terminal (31°36’N 121°12’E)
- Specialized for dangerous cargo (Class I-IV)
- Fire-fighting capability: FI-FI Class 1
- Changshu Logistics Base (31°39’N 121°09’E)
- Container throughput: 1.2 million TEU/year
- Gantry crane capacity: 50t under spreader
Yangtze River Navigation Parameters:
Parameter |
Dry Season |
Flood Season |
Current Velocity |
1.5-2.5 knots |
3.0-4.5 knots |
Tidal Range |
2.8-3.5m |
3.8-5.2m |
Visibility |
3-5km (avg) |
5-10km (avg) |
2. Regulatory Framework
- Primary Regulations:
- MSA Regulation No.3 (2021 Amendment)
- Yangtze River Protection Law (Article 28-35)
- CPA Port Ordinance (2023 Edition)
- Pilotage Mandates:
- Foreign vessels: Compulsory per China Maritime Code Article 35
- Domestic vessels: >3,000 GT or carrying hazardous materials
- Exceptions require MSA pre-approval (72-hour notice)
3. Detailed Pilotage Procedures
3.1 Pre-arrival Protocol
- Documentation:
- MSA Form 301 (Vessel Particulars)
- CPA Declaration Form D-12
- Valid P&I Certificate (minimum $1B coverage)
- Timeline:
- 72h prior: Preliminary notice via CPA e-Portal
- 24h prior: Final ETA with draft confirmation
- 6h prior: Pilot boarding confirmation
3.2 Pilot Transfer Operations
- Boarding Locations:
- Primary: Yangtze No.1 Anchorage (31°40’N 121°10’E)
- Alternate: No.3 Anchorage (31°35’N 121°15’E)
- Safety Requirements:
- Pilot ladder compliance with SOLAS Regulation V/23
- Minimum freeboard: 1.5m at boarding position
- Night operations: 100 lux illumination at ladder
3.3 Navigation Protocol
- Speed Limits:
- Port area: 8 knots (CPA Regulation 12.3)
- River channel: 12 knots max
- Critical Waypoints:
- WP-01 (31°42’N 121°08’E): Start of TSS Zone
- WP-02 (31°37’N 121°14’E): Changshu Bend
- WP-03 (31°35’N 121°16’E): Liuhe Confluence
3.4 Berthing Specifications
Berth |
Length (m) |
Depth (m CD) |
Max DWT |
New Port #1 |
230 |
-12.5 |
50,000 |
Econ Zone #3 |
180 |
-10.0 |
30,000 |
Logistics #5 |
250 |
-13.0 |
55,000 |
4. Cost Structure & Optimization
4.1 Fee Schedule
Service |
Day Rate (RMB) |
Night Surcharge |
Pilotage (<5,000 GT) |
1,800 + 12/nm |
+30% |
Tug Assistance (per tug) |
2,400/hour |
+50% |
Berth Charges |
0.08/GT/day |
– |
4.2 Cost-Saving Measures
- Tidal Planning:
- Optimal arrival: +2hrs before HW (CPA Tide Table 2023)
- Draft adjustment: 0.3m reduction saves ~8% port dues
- Operational Efficiency:
- Pre-cleared documentation: Saves 2-4hrs port time
- Bundled services: 15% discount for CPA registered operators
5. Safety Management System
- Emergency Equipment Requirements:
- Yangtze River-specific lifejackets (Type YR-1)
- Bilingual (CN/EN) emergency procedures manual
- Crew Certification:
- MSA Yangtze River Endorsement (Certificate YRE-01)
- Annual bridge team training (CPA Standard TS-2022)
6. Contact Directory
Service |
Contact |
VHF Channel |
Port Control |
+86 512 5267 2288 |
Ch. 16/09 |
Pilot Station |
+86 512 5268 1196 |
Ch. 06 |
Medical Emergency |
+86 512 5267 1199 |
Ch. 16 |