27.3 C
Singapore
Monday, August 18, 2025
spot_img

CATEGORY

PSC

How to avoid a negative BWMS commissioning test

A panel of experts consider the common mistakes resulting in failed tests, and resolve confusion around BWMS commissioning testing   Shipping’s D-Day for ballast water management...

Ballast water systems: what shipowners really want

Not all ballast water treatment systems are the same system design limitations can have a big impact on the efficiency of the system   One of...

Developments in ballast water treatment in the US

Ballast water regulations and compliance in the US follows a different pattern to the rest of the world, but shares the issue of challenging...

TECO 2030 receives BWTS order

TECO 2030 has received an order for its ballast water treatment system (BWTS) from CMI Ship Management, the agent for MV Quest, worth approximately...

ERMA FIRST, N-KOM sign after-sales technical support for BWTS

Nakilat-Keppel Offshore & Marine (N-KOM), a joint venture between Nakilat, and Keppel Offshore & Marine Ltd., will provide after-sales technical support to vessels equipped...

After-sales technical support for ballast water treatment systems in Qatar: ERMA FIRST brings on board N-KOM expertise t

Nakilat-Keppel Offshore & Marine (N-KOM), a joint venture between Qatar’s premier shipping and maritime company, Nakilat, and leading offshore rig constructor and ship repairer...

TECO 2030 bags ballast water treatment order for Quest

TECO 2030 received an order for a TECO 2030 Ballast Water Treatment System (BWTS) powered by BIO-SEA from CMI Ship Management, for the expedition...

Polar Code Inspection Underway by Paris MOU

The Paris Memorandum of Understanding on Port State Control (Paris MoU) is currently conducting an inspection campaign to verify compliance with the requirements of...

Polar Code on the PSC agenda

Paris MOU has launched an inspection campaign to verify compliance with the requirements of the Polar Code. The campaign will be run over two...

BWTS: deadlines, enforcement and extensions

The deadlines are clear but there is a lack of data on D-2 standard installations, raising concerns about enforcement and flag extensions “One estimate is...
spot_img

Latest news

- Advertisement -spot_img
spot_img