30.7 C
Singapore
Saturday, April 26, 2025
spot_img

Comprehensive Pilotage and Navigation Procedures for Jiangyin Port & Yangtze River Transit

Must read

I. Regulatory Compliance Framework

  • Primary Legislation:
    • Maritime Traffic Safety Law of China (2021 Amendment, Article 25-32)
    • Yangtze River Navigation Safety Regulations (MSA Order No.15/2023)
    • IMO Resolution A.1153(32) for Inland Waterway Pilotage
  • Port-Specific Regulations:
    • Jiangsu MSA Notice 2024-02 (Revised Pilotage Requirements)
    • Jiangyin Port Authority Operation Manual (V4.3, Jan 2024)
    • China Classification Society Rules for Yangtze Navigation (2023)

II. Pilotage Service Parameters

A. Boarding Procedures

  • Mandatory boarding locations:
    • Main station: Wusongkou Pilot Station (31°25’36″N 121°34’12″E)
      • Minimum approach speed: 6 knots
      • Daylight boarding window: 0600-1730 LT (extended to 1900 LT summer)
    • Alternate stations:
      • No.7 Waiting Area (31°30’00″N 121°20’00″E) – Emergency use only
      • Liuhekou Transfer Point (31°45’00″N 121°02’00″E)
  • Equipment requirements:
    • Pilot ladder: 2.5m clear of ship’s side, certified annually
    • Minimum freeboard: 1.8m during boarding
    • Lighting: 100 lux at boarding position at night

B. Navigation Channel Specifications

Segment Start Position End Position Guaranteed Depth Channel Width
Yangtze Estuary to Jiangyin 31°25’36″N 121°34’12″E 31°55’20″N 120°15’55″E 12.5m (CD) 500m
Jiangyin Port Approaches 31°53’00″N 120°20’00″E 31°56’40″N 120°12’30″E 10.8m (CD) 300m

III. Critical Infrastructure Clearances

A. Vertical Clearance Table

Structure Name Type Location (WGS84) Clearance (MHWS) Tidal Variation
Sutong Bridge Suspension 31°47’12″N 121°00’45″E 62.0m +3.8m spring tide
Jiangyin Bridge Suspension 31°55’20″N 120°15’55″E 50.0m +2.9m spring tide
Xicheng High Voltage Cable Overhead power 31°50’00″N 120°30’00″E 52.4m

B. Cable & Pipeline Crossings

  • Submarine cable zones:
    • West Channel Crossing (31°51’00″N 120°25’00″E)
      • Depth: 28m below CD
      • Protection zone: 500m each side
  • Pipeline areas:
    • Jiangyin Chemical Pipeline Corridor (31°54’00″N 120°18’00″E)
      • Speed limit: 8 knots
      • No-anchoring zone: 1000m radius

IV. Operational Restrictions

A. Vessel Size Limitations

  • Channel capacity:
    • Maximum LOA: 230m (subject to tide conditions)
    • Maximum beam: 32.26m (one-way traffic if >32m)
    • Air draft restriction: ≤45m (including antennas)
  • Special conditions:
    • Vessels >50,000 DWT: Tidal window restrictions apply
    • Chemical tankers: Additional tug requirement

B. Navigation Timeline

  • All vessels must:
    • Submit ETA 24h + 6h + 1h advance notice
    • Confirm pilot request 4h before boarding
  • Night navigation:
    • Permitted for vessels ≤50,000 DWT with:
      • Functioning dual radar systems
      • Enhanced bridge team (3 officers minimum)
    • Surcharge: 35% base fee (Yangtze MSA Tariff No.2023-08)

V. Port-Specific Procedures

A. Berthing Requirements

Terminal Berth No. Max LOA Max Draft Special Requirements
Jiangyin General Cargo 1-3 190m 10.5m Tug assistance mandatory
Xinrong Container 4-6 220m 11.8m Prior crane coordination required

B. Emergency Protocols

  • Distress channels:
    • Primary: VHF CH 16 (continuous watch)
    • Secondary: CH 06 (Jiangyin Port Ops)
  • Abort points:
    • Downbound: No.25 Light Buoy (31°56’00″N 120°12’00″E)
    • Upbound: No.37 Light Buoy (31°45’00″N 121°00’00″E)

VI. Important Notices

  • Tidal restrictions:
    • Neap tide period (2 days/month): Draft reduction 0.8m
    • Typhoon season (Jun-Sep): Additional ballast may be required
spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article