29.6 C
Singapore
Tuesday, April 29, 2025
spot_img

Container Terminal of Gwangyang Port

Must read

Gwangyang Port’s Container Terminal has an advantageous site condition. The adjacent island, Myodo, serves as a natural breakwater and allows the terminal to facilitate cargo working over 360 days a year. This is the only domestic terminal where mega-scale container ships as well as maximum 300,000 ton’s ships can enter and departure thanks to its deep water level (16m). Furthermore, the terminal equips with 100% on dock system and a high-tech crane that enables cargo working for mega carrier level (10,000 TEU or higher) vessels. In addition, its operation based on the advanced IT and the most optimal logistics services by automatic carry in/out service are the envy of the world.

Status on the container terminal/terminal operation company
 
terminal operation company berthing capacity based
on the length of terminal
Cargo handling capacity site area
(CY area)/
equipment ability CFS unloading equipment
3 companies 4,400m
50,000 x 10 berths
20,000 x 4 berths
4.6million TEU 2.326 million m
(1.1558 million m)
247,406TEU 31.7million㎡ C/C (25)/
T/C (54)
yard tractor (102)
Yard chassis(246)
reach stacker (14)

※ Container terminal equipment ability 164,203TEU + Empty container station 83,203TEU
※ remove the 1st and 2nd berth per the change in the port masterplan(‘1212)

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article