GTT announces that it has received, at the end of June, an order from its partner the Korean shipyard Samsung Heavy Industries for the tank design of fourteen new LNGCs[1], including twelve vessels on behalf of an American ship-owner, and two on behalf of an Asian ship-owner.
As part of this order, GTT will design the tanks of these fourteen vessels, which will offer a cargo capacity of 174,000 m3 each and will be fitted with the Mark III Flex membrane containment system, a technology developed by GTT.
Deliveries of the vessels are scheduled from the fourth quarter of 2024 to the third quarter of 2026.