29 C
Singapore
Saturday, May 3, 2025
spot_img

GTT secures an order from Hudong Zhonghua for the tank design of 4 new LNG carriers

Must read

GTT says it has received, in April 2022, an order from its partner the Chinese shipyard Hudong Zhonghua (HZ) for the tank design of the first four Liquefied Natural Gas Carriers (LNGC) for the Qatargas project on behalf of the ship-owner MOL.

GTT will design the tanks of these four new LNG carriers with a total of LNG tank capacity of 174,000 m3 per ship and will be fitted with the membrane containment system developed by GTT.

The delivery of the vessels is scheduled for the third quarter of 2024 and the second quarter of 2025.

GTT says it has received, in April 2022, an order from its partner the Chinese shipyard Hudong Zhonghua (HZ) for the tank design of the first four Liquefied Natural Gas Carriers (LNGC) for the Qatargas project on behalf of the ship-owner MOL.

GTT will design the tanks of these four new LNG carriers with a total of LNG tank capacity of 174,000 m3 per ship and will be fitted with the membrane containment system developed by GTT.

The delivery of the vessels is scheduled for the third quarter of 2024 and the second quarter of 2025.

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article