25 C
Singapore
Tuesday, May 6, 2025
spot_img

Notices of Haikou Port to the Masters and Ship Operators

Must read

  1. Port Entry & Documentation
    • Mandatory Pre-arrival Submissions:
      • 72h/48h/24h ETA updates via Haikou e-Navigation System (HENS)
      • Vessels >10,000 GT must provide:
        • Stability calculations (including heavy lift/deck cargo plans)
        • Cargo securing manual (latest class-approved version)
        • Cyber security declaration (IMO MSC-FAL.1/Circ.3 Rev.2)
      • New 2024 Requirement: Biofouling management statement (MEPC.378(80))
    • Certificate Verification:
      • Original class certificates + interim documents (if applicable)
      • P&I insurance coverage ≥$1b for vessels >10,000 GT
      • STCW certificates including 2010 Manila amendments
  2. Navigation & Safety
    • Channel Parameters:
      • Main channel: 14.5m CD + 1.0m UKC required (surveyed June 2024)
      • Channel 2: Reduced width to 200m until Dec 2024 (dredging works)
      • VTS sectors updated (refer to Admiralty Chart BA 3441/2024)
    • Equipment Requirements:
      • AIS continuous transmission within 12nm radius (MSA Reg.2023-12)
      • ECDIS must use latest Haikou ENCs (CELL 34411 Ed.2024)
      • New: VDR data extraction capability required for incident investigation
  3. Pilotage & Berthing
    • Compulsory Areas:
      • Vessels ≥500 GT or LOA ≥50m (including tugs with tow)
      • Special craft (floating cranes, dredgers) regardless of size
    • Transfer Arrangements:
      • Pilot ladders must comply with SOLAS Reg. V/23 (2023 amendments):
        • Anti-slip steps with yellow markings
        • Certified strength ≥24kN (DNVGL-ST-0378 standard)
      • Helicopter transfer zones at Outer Anchorage A (prior approval required)
  4. Cargo Operations
    • Dangerous Goods:
      • Class 1 explosives: Berth 5 only (500m exclusion zone enforced)
      • LNG operations: Xiuying Terminal (new 2024 safety checklist attached)
      • Radioactive materials: 72h pre-notice + MSA escort mandatory
    • Bulk Cargo Specifics:
      • Grain: Max moisture 12.5% (sampling per IMO MSC.1/Circ.1395)
      • Coal: Gas monitoring every 4h (SOLAS Reg. II-2/4.5.3)
      • New: Iron ore fines – TML certificate must accompany cargo declaration
  5. Environmental Compliance
    • Emission Control:
      • 0.1% sulphur fuel within port limits (China ECA regulations)
      • Shore power mandatory for container vessels >5,000 GT (from 2025)
    • Waste Management:
      • Zero liquid discharge (MARPOL Annex IV revised 2023)
      • Plastic waste tracking per IMO RES. MEPC.310(73)
      • New: Food waste segregation requirements implemented
  6. Security Measures
    • ISPS Protocols:
      • Level 1: Continuous gangway watch + biometric visitor logging
      • Cyber security:
        • Network segmentation requirements
        • Monthly vulnerability scans mandatory
    • Restricted Areas:
      • Naval zone: 20°05’12″N 110°08’30″E (500m exclusion)
      • Wind farm construction: 20°00’15″N 110°18’30″E
      • New: UAV no-fly zone within 1nm of port facilities
  7. Emergency Response
    • Pollution Control:
      • Tier I response at all berths (1h activation time)
      • New high-capacity skimmers at Xiuying Terminal
      • Updated: SOPEP drills must include cyber incident scenarios
    • Medical Facilities:
      • Quarantine anchorage: 20°00’30″N 110°17’00″E
      • Telemedicine via VHF Ch 67 (24/7 specialist support)
  8. Meteorological Procedures
    • Typhoon Response:
      • Signal No. 3: Secure cargo + reduce gangway weight to ≤50kg
      • Signal No. 8: Vessels >20,000 GT must depart or use typhoon moorings
    • Monsoon Preparations:
      • NE monsoon (Oct-Mar): Additional mooring lines + hourly tension checks
      • SW monsoon (Apr-Sep): Container lashing to enhanced standards
  9. Port Services
    • Bunkering:
      • Designated anchorages: A, D, J (24h notice required)
      • Mass flow meters mandatory for deliveries >100mt
      • New: LNG bunkering available at Berth 14 (72h notice)
    • Utilities:
      • Fresh water: 48h notice for >500t (pre-treatment certificate required)
      • Shore power: Phase 1 at Berths 8-12 (400V/60Hz)
  10. Operational Notices
    • Construction Alerts:
      • New container terminal at 20°04’12″N 110°11’30″E (LOA restriction 350m)
      • Dredging in Channel 2 (daily 0800-1800, reduced width 200m)
    • Naval Activities:
      • Live fire exercise area: 19°58’00″N 110°20’00″E to 19°55’00″N 110°25’00″E
      • Temporary closures announced via NAVAREA XI 148/2024
  11. Crew Welfare
    • Shore Leave:
      • ISPS Level 1: Permitted with valid ID (passport/seaman’s book)
      • Crew change area at Berth 15 (24/7 immigration services)
    • Medical Support:
      • Port clinic (24/7 with trauma capability)
      • Designated infectious disease area at Terminal 3
  12. Financial Regulations
    • Port Dues:
      • Environmental levy: $0.15/GT (from 1 Jan 2024)
      • Carbon charge: $0.08/GT for vessels >20,000 GT
    • Payment Methods:
      • Electronic transfer preferred (SWIFT/UnionPay)
      • Cash payments limited to <$10,000 (declaration required)

EMERGENCY CONTACT DIRECTORY

Service Primary Contact Secondary Contact Response Time
Port Control VHF Ch 12/16 +86 898 6862 3333 Immediate
Marine Rescue VHF Ch 16 +86 898 6862 1199 <30 mins
Medical Emergency VHF Ch 67 +86 898 6862 1200 <1 hour

Issuing Authority: Haikou Port Authority Maritime Safety Department

Effective Date: 23 July 2024

Document Control: HPA-2024-MN-007-Rev.3

Certification:

  • Captain Zhang Wei, Harbor Master (Digital Signature: HPA-ZW-0723)
  • China Classification Society (Certificate No. CCS-HK-2024-MN-003)

MARINER’S VERIFICATION CHECKLIST

  1. Cross-check with latest NAVAREA XI warnings
  2. Confirm real-time updates via VHF Ch 12/16
  3. Validate against Haikou Port Authority website (www.haikouport.gov.cn)
  4. Verify vessel-specific stability calculations
spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article