28.2 C
Singapore
Friday, May 2, 2025
spot_img

Notices of Jiangmen Port to the Masters and Ship Operators

Must read

  1. Navigation Safety Requirements
    • Vessel Traffic Service (VTS):
      • Sector A (Xinhui Control):
        • Channel 12 (156.600 MHz) – Primary working frequency
        • Coverage: Up to 22°20’N latitude
        • New AIS mandate: Vessels >300GT must maintain continuous AIS transmission
      • Sector B (Gaosha Control):
        • Channel 14 (156.700 MHz) – Secondary frequency
        • Extended monitoring to Wugang Terminal approach
      • Emergency Protocols:
        • Distress calls: Channel 16 with DSC on Channel 70
        • New radar overlay service available via Channel 71

       

    • Traffic Separation Scheme (TSS):
      • Geographical Coordinates:
        • Inbound lane centerline: 242°T between 22°05’N-22°15’N
        • Outbound lane centerline: 062°T with 0.5nm clearance zone
      • Speed Regulations:
        • General: 10-12 knots in TSS
        • Tankers >20,000DWT: Max 8 knots in precautionary area
      • Marking System:
        • Lateral buoys (JM12-JM18): IALA Region A configuration
        • Virtual AIS markers at 1nm intervals

      (Amended per IMO SN.1/Circ.346)

    • Restricted Areas:
      • Naval Operating Zone:
        • 22°12.5’N 113°06.8’E to 22°14.0’N 113°08.2’E
        • 24hr prohibition unless prior clearance
      • Pipeline Protection Zone:
        • 500m either side of 22°09.2’N 113°03.5’E to 22°07.8’N 113°02.1’E
        • Anchoring strictly prohibited
  2. Port Infrastructure Specifications
    • Terminal Capacities:
      • Wugang Terminal:
        • Berth 5 (New):
          • Dimensions: 320m LOA × 55m beam
          • Depth: -16.5m CD (dredged to -16.8m)
          • Mooring: 12 x 100MT bollards
        • Crane Specifications:
          • Main Hoist: 65MT at 18m outreach (proof tested to 81.25MT)
          • Auxiliary Hoist: 40MT at 55m
          • Anti-collision system: Laser-based with 5m warning zone
      • Gaosha Bulk Terminal:
        • Loading Rate:
          • Grain: 2,500MT/hr (max)
          • Coal: 3,000MT/hr with dust suppression
        • Storage:
          • Covered warehouses: 150,000MT capacity
          • Open yards: 450,000MT (sprinkler-equipped)
    • Dredging Program 2024-2025:
      • Main Channel:
        • Phase I (South):
          • Nov 1-Dec 15: 24hr operation
          • Depth: -14.5m ±0.3m tolerance
        • Phase II (North):
          • Jan 5-31: Daylight only (0700-1900)
          • Width: 250m after completion
      • Equipment:
        • Trailing Suction Hopper Dredger “Yue Gang 008”:
          • Capacity: 8,000m³
          • Positioning: RTK GPS + GLONASS

      (CCCC Dredging Contract No.GD-2024-028)

  3. Environmental Compliance
    • Ballast Water Management:
      • Sampling Requirements:
        • Minimum 3 samples: Forepeak, midships, aft peak
        • 20μm filtration for all samples
        • 48hr pre-arrival notification
      • High Risk Zones:
        • Category A (100% inspection):
          • Malacca Strait
          • Persian Gulf
        • Category B (50% random):
          • Red Sea
          • West African ports
      • Penalties:
        • Unauthorized discharge: RMB 200,000-1,000,000
        • False records: RMB 50,000 per violation

      (MEPC.366(79) Implementation Guidelines)

    • Air Emissions Control:
      • Fuel Sulphur Limits:
        • 0.10% within 12nm of port
        • 0.50% in Chinese ECA zones
      • Shore Power:
        • Mandatory for:
          • Container ships >10,000GT
          • Cruise vessels >5,000GT
        • Technical Specifications:
          • Voltage: 6.6kV ±10%
          • Frequency: 60Hz ±0.5%
          • Connection time: <30 minutes

      (GB 17567-2023 Standard)

  4. Cargo Handling Regulations
    • Dangerous Goods:
      • Documentation:
        • IMDG declaration: 96hr pre-arrival
        • Emergency plans: Port-specific supplement required
      • Stowage Requirements:
        • Explosives (Class 1): Quadrant 4 only
        • Toxic gases (2.3): No stacking >2 tiers
      • Operational Restrictions:
        • Daylight hours only (0600-1800 local)
        • Temperature monitoring for UN 3257 materials

      (China DG Code Amendment 2024-06)

    • Bulk Cargo Operations:
      • Grain Loading:
        • Maximum trim: 1/100 LBP
        • Mandatory pre-loading stability review
      • Coal Handling:
        • Moisture Limit: 12% (9% for spontaneous combustion grades)
        • Dust suppression: Water spray <30μm droplet size
    • Container Weighing:
      • VGM requirements:
        • Method 1: Certified weighbridge
        • Method 2: Calculated with approved software
      • Tolerance: ±5% or 1MT (whichever lower)
  5. Pilotage and Towage
    • Pilot Boarding:
      • Primary Location:
        • 22°09.5’N 113°04.2’E (Daylight)
        • Transfer height: 1.5-9.0m above waterline
      • Secondary Location:
        • 22°08.8’N 113°02.7’E (24hr)
        • Max sea state: 3.0m significant wave height
    • Towage Requirements:
      • Minimum bollard pull:
        • <50,000DWT: 35T
        • >100,000DWT: 65T
      • Escort tugs:
        • Mandatory for LNG carriers
        • 1 tug per 150m LOA
  6. Security Measures
    • ISPS Level 1:
      • Access Control:
        • Biometric verification: Facial + fingerprint
        • Visitor escorts: 1:1 ratio in restricted areas
      • Port Facility Security:
        • Patrols: 15min intervals
        • CCTV: 4K resolution with 30-day retention
    • Cyber Essentials:
      • Data Transfer:
        • ECDIS updates: SHA-256 verified
        • No wireless transfers in operational areas
      • Network Security:
        • Firewall: IEC 62443-3-3 compliant
        • Intrusion detection: 24/7 monitoring
  7. Emergency Response
    • Oil Spill Contingency:
      • Response Equipment:
        • Containment boom: 5,000m capacity
        • Skimmers: 200m³/hr recovery rate
      • Reporting Protocol:
        • Immediate: VHF Ch 16 + DSC
        • Follow-up: MSA Form OP-1 within 1 hour
    • Medical Evacuation:
      • Helicopter Operations:
        • LZ Coordinates: 22°10.3’N 113°05.6’E
        • Approach path: 310°T obstacle clearance
      • Quarantine Procedures:
        • Isolation cabins: Negative pressure required
        • Medical waste: Yellow bin protocol
spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article