28.8 C
Singapore
Monday, April 28, 2025
spot_img

Notices of Lanshan Port to the Masters and Ship Operators

Must read

  1. Anchorage Management

    • Designated zones: LS-1 (General), LS-2 (Bulk), LS-3 (Container), LS-4 (Dangerous Goods), LS-5 (VLCC), LS-6 (Waiting), LS-7 (Quarantine)
    • Holding capacity:
      • LS-1/2: Mud bottom (Shear strength 45±5 kPa, PLI 2.8)
      • LS-3/4: Sand-mix (Cone resistance 1.8 MPa)
      • LS-5: Clay-silt (Undrained shear 36 kPa)
    • Tidal references: Chart Datum 0.82m below MSL (CHS Tidal Atlas Vol.12)
    • Equipment requirements:
      • 2 anchors ready for vessels >200m LOA
      • Radar reflector mandatory at LS-6
    • Emergency protocols:
      • Typhoon alert: Orange warning requires second anchor deployment
      • Oil leakage: Immediate VHF Ch.12/16 report + visual marker buoy
    • New: Anchor dragging monitoring:
      • Vessels >50,000GT must maintain AIS transmission
      • Position tolerance: Max 200m drift in 1 hour
  2. Navigation Channel Specifications

    • Main channel:
      • Depth: 23.8m CD ±0.5m silting allowance (2024 multibeam survey)
      • Width: 380m between CH15-CH18 (450m straight sections)
    • Secondary channels:
      • North approach: Depth 18.2m, width 200m
      • South route: Depth 15.5m (Daylight only beyond CH27)
    • Special transit rules:
      • Daylight restrictions: Vessels >200m LOA or >14m draft
      • Night navigation: Requires VTS approval + escort tugs
    • Speed regulations:
      • Inner channel: Max 8 knots (Radar monitored)
      • Approach lane: Max 12 knots
      • Overtaking prohibited between CH7-CH12
    • New: Electronic navigation mandates:
      • ENC LS3456B updated weekly
      • AIS Class A requirement for all commercial vessels
  3. Berthing Operations & Mooring

    • Terminal specifications:
      Berth Type Max LOA (m) Draft (m) Special Notes
      CT-3/4 Container 400 16.5 Tidal window ±2hrs HW for mega-vessels
      TB-4/5 Tanker 330 22.8 Vapor recovery system active
      7A-7D Multi-purpose 250 14.2 Cold ironing available
    • New mooring requirements:
      • Synthetic ropes prohibited at oil/gas terminals
      • Wire rope lubrication certificates valid ≤6 months
      • Winch brake test reports required for vessels >100,000DWT
    • Emergency release:
      • Quick-release hooks tested every 3 months
      • Fireproof mooring lines mandatory at TB-4/5
  4. Cargo Operations & Handling

    • Dry bulk operations:
      • Coal dust suppression: 0.8L/ton water spray (continuous)
      • Iron ore moisture: ≤8% TML with valid certificate
      • Grain trimming: Angular deviation ≤5° from horizontal
    • Container operations:
      • LAS 35+ lashing standard above Beaufort 5
      • Reefer monitoring: Temperature logs required every 4 hours
    • New dangerous goods handling:
      • Class 1 explosives: 24m segregation from Class 2.1
      • Radioactive materials: Dual GNSS tracking required
    • Liquid cargo additions:
      • Butadiene loading: Nitrogen padding mandatory
      • Crude oil washing: Only with IOPP Certificate
  5. Pilotage & Tug Services

    • Pilot boarding:
      • Primary position: 35°12’18.7″N 119°42’09.3″E (CH2 seaward)
      • VLCC transfer point: 2nm NE of LS-5 (Daylight, sea state ≤3)
      • Ladder specifications:
        • Last 3m must extend above platform
        • 1.5m clearance from shipside
        • Maximum 45° inclination
    • Tug allocation:
      Vessel Size Minimum Tugs Bollard Pull (Total)
      <200m 2 60t
      200-300m 3 120t
      >300m 4 200t
    • New: Helicopter transfer protocols:
      • Max surface wind: 25 knots
      • Daytime VFR conditions only
      • Landing area marking: Yellow circle diameter 10m
  6. Safety & Emergency Procedures

    • Firefighting capabilities:
      • FiFi 1 tugs: 2,400m³/hr capacity (15min response)
      • Foam stocks: 50,000L AFFF concentrate (3% solution)
    • Oil spill response:
      • Tier 2 capacity: 500t storage
      • Containment boom: 1,200m available (400m/hr deployment)
    • New medical emergency provisions:
      • Designated helipad: CT-3 (marked “H” 35°13’45″N 119°41’32″E)
      • Port hospital: 24/7 trauma center with decompression chamber
    • Updated abandon ship procedures:
      • Primary muster: LS Passenger Terminal
      • Alternative: West Breakwater (floodlit area)
  7. Environmental Compliance

    • Emission control:
      • ECA limits: 0.1% sulfur within port limits
      • Shore power: 6.6kV/60Hz at dedicated berths
    • Waste management:
      • Garbage separation: 6-category system
      • Plastic ban: Zero discharge policy
    • New ballast water regulations:
      • D-2 standard compliance required
      • Exchange only beyond 200nm from coast
    • Added noise restrictions:
      • 2200-0600: Maximum 85dB(A) at 1m
      • Vessel whistle prohibited except emergency
  8. Documentation Requirements

    • Pre-arrival submissions:
      • PortMIS e-platform (24hr before ETD)
      • Security forms: ISPS checklist + crew manifest
    • Cargo documentation:
      • IMDG cargo: Proper Shipping Name + UN number
      • Container weight: Verified Gross Mass certificate
    • New certification requirements:
      • Underwater inspection reports for vessels >15 years
      • Bunker delivery notes with ISO 8217:2017 compliance
    • Updated P&I requirements:
      • Original Club LOI for hazardous cargo
      • Updated anti-corruption declaration
  9. Meteorological Restrictions

    • Typhoon conditions:
      Condition Action Threshold
      1 (Yellow) Secure cargo Sustained wind >12m/s
      2 (Orange) Depart vessels >50,000GT 8hr typhoon warning
      3 (Red) Port closure Predicted wind >25m/s
    • New visibility rules:
      • Radar-assisted berthing: Minimum 350m visibility
      • Fog signal activation: <1nm visibility
    • Added thermal restrictions:
      • -5°C: Anti-icing system activation
      • 40°C: Work hour limitations apply

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article