30.7 C
Singapore
Saturday, April 26, 2025
spot_img

Piloting and Pilotage Precedure of ChangShu Port and Changjiang river

Must read

1. Port Overview and Navigation Characteristics

Changshu Port (31°38’N 121°10’E) is a Class I open port certified under GB/T 27901-2021, comprising three main operational areas:

  • Changshu New Port Area (31°40’N 121°08’E)
    • 4 berths for vessels up to 50,000 DWT
    • Design depth: -12.5m CD
  • Changshu Economic Zone Terminal (31°36’N 121°12’E)
    • Specialized for dangerous cargo (Class I-IV)
    • Fire-fighting capability: FI-FI Class 1
  • Changshu Logistics Base (31°39’N 121°09’E)
    • Container throughput: 1.2 million TEU/year
    • Gantry crane capacity: 50t under spreader

Yangtze River Navigation Parameters:

Parameter Dry Season Flood Season
Current Velocity 1.5-2.5 knots 3.0-4.5 knots
Tidal Range 2.8-3.5m 3.8-5.2m
Visibility 3-5km (avg) 5-10km (avg)

2. Regulatory Framework

  • Primary Regulations:
    • MSA Regulation No.3 (2021 Amendment)
    • Yangtze River Protection Law (Article 28-35)
    • CPA Port Ordinance (2023 Edition)
  • Pilotage Mandates:
    • Foreign vessels: Compulsory per China Maritime Code Article 35
    • Domestic vessels: >3,000 GT or carrying hazardous materials
    • Exceptions require MSA pre-approval (72-hour notice)

3. Detailed Pilotage Procedures

3.1 Pre-arrival Protocol

  • Documentation:
    • MSA Form 301 (Vessel Particulars)
    • CPA Declaration Form D-12
    • Valid P&I Certificate (minimum $1B coverage)
  • Timeline:
    • 72h prior: Preliminary notice via CPA e-Portal
    • 24h prior: Final ETA with draft confirmation
    • 6h prior: Pilot boarding confirmation

3.2 Pilot Transfer Operations

  • Boarding Locations:
    • Primary: Yangtze No.1 Anchorage (31°40’N 121°10’E)
    • Alternate: No.3 Anchorage (31°35’N 121°15’E)
  • Safety Requirements:
    • Pilot ladder compliance with SOLAS Regulation V/23
    • Minimum freeboard: 1.5m at boarding position
    • Night operations: 100 lux illumination at ladder

3.3 Navigation Protocol

  • Speed Limits:
    • Port area: 8 knots (CPA Regulation 12.3)
    • River channel: 12 knots max
  • Critical Waypoints:
    • WP-01 (31°42’N 121°08’E): Start of TSS Zone
    • WP-02 (31°37’N 121°14’E): Changshu Bend
    • WP-03 (31°35’N 121°16’E): Liuhe Confluence

3.4 Berthing Specifications

Berth Length (m) Depth (m CD) Max DWT
New Port #1 230 -12.5 50,000
Econ Zone #3 180 -10.0 30,000
Logistics #5 250 -13.0 55,000

4. Cost Structure & Optimization

4.1 Fee Schedule

Service Day Rate (RMB) Night Surcharge
Pilotage (<5,000 GT) 1,800 + 12/nm +30%
Tug Assistance (per tug) 2,400/hour +50%
Berth Charges 0.08/GT/day

4.2 Cost-Saving Measures

  • Tidal Planning:
    • Optimal arrival: +2hrs before HW (CPA Tide Table 2023)
    • Draft adjustment: 0.3m reduction saves ~8% port dues
  • Operational Efficiency:
    • Pre-cleared documentation: Saves 2-4hrs port time
    • Bundled services: 15% discount for CPA registered operators

5. Safety Management System

  • Emergency Equipment Requirements:
    • Yangtze River-specific lifejackets (Type YR-1)
    • Bilingual (CN/EN) emergency procedures manual
  • Crew Certification:
    • MSA Yangtze River Endorsement (Certificate YRE-01)
    • Annual bridge team training (CPA Standard TS-2022)

6. Contact Directory

Service Contact VHF Channel
Port Control +86 512 5267 2288 Ch. 16/09
Pilot Station +86 512 5268 1196 Ch. 06
Medical Emergency +86 512 5267 1199 Ch. 16

 

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article