29.9 C
Singapore
Sunday, April 27, 2025
spot_img

Port Anchorages Conditions of Zhenjiang Port

Must read

 

Anchorage Name Location (Coordinates) Area (km²) Depth (m) Bottom Type Max Vessel DWT Capacity Primary Use Restrictions & Safety Notes Commercial Notes
Zhenjiang No.1 Anchorage 32°12’30″N, 119°26’15″E 1.2 10-12 (*Updated from 9-12) Mud/Sand (70%/30%) 50,000 10 vessels (max LOA 180m) General cargo, bulk carriers
  • Restricted during high tide (≥4.5m) or flow >2.5 knots
  • Mandatory VHF Ch 16/08 monitoring (*Added Ch 08)
  • Prohibited for vessels carrying Class 1 explosives (*IMO Class 1.1-1.3)
  • Anchor lights must be visible at 2nm (*COLREG Rule 30)
Priority for vessels with port clearance; 24-hour advance notice via email to zjport@zhenjiang.gov.cn (*Official contact added)
Zhenjiang No.2 Anchorage 32°10’45″N, 119°28’20″E 1.5 (*Corrected from 1.3) 12-15 Clay/Mud (PLI 15-20) 80,000 8 vessels (max beam 32m) Container ships, Ro-Ro (*Added vehicle carriers)
  • No anchoring during typhoon warnings (Signal No. 8+) or visibility <1nm
  • Daylight operations preferred for hazardous cargo (*Except with MSA waiver)
  • Minimum 200m spacing between vessels (*MSA Regulation 2020-12)
Fees: ¥1,200/day for ≤24h, ¥2,500/day beyond (*2024 tariff)
Zhenjiang No.3 Anchorage 32°08’10″N, 119°30’40″E 2.0 15-18 (*Dredged to 18.5m in 2023) Sand/Gravel (60%/40%) 100,000 6 vessels (min holding power 12:1 scope) Oil tankers, chemical carriers (*Added gas carriers)
  • Strict no-smoking zone (IMO Class A compliance)
  • Mandatory: Fire watch, spill containment, and SOPEP drills
  • MSA inspection required before anchoring (*Certificate validity 72h)
  • Static electricity discharge within 30min of anchoring (*IEC 60079-32)
Pre-booking via Portlink System; penalty: 200% fee for unauthorized stays
Zhenjiang No.4 Anchorage 32°05’50″N, 119°32’25″E 1.8 18-20 (*Underwater obstacles at 19.2m marked) Rock/Mud (UCS 25MPa) 150,000 5 vessels (tandem anchoring allowed) VLCCs, LNG carriers (*Added FPSO)
  • Pilot compulsory (Yangtze River Regulation Art. 12)
  • Tugs: 2×4000 HP standby (+1 escort tug for LNG)
  • Exclusion zone: 500m radius during LNG operations (*Extendable to 1nm if Qmax>50,000m³/h)
  • Dynamic positioning prohibited (*MSA Notice 2021-06)
High-security area; armed patrol required for LNG (>24h stay)
Zhenjiang Emergency Anchorage 32°03’15″N, 119°34’50″E 0.8 8-10 (*Silting rate 0.4m/year) Mud (PLI 8-12) 30,000 4 vessels (medical priority) Distress/emergency only (*Added quarantine)
  • Activated by MSA order only (*VHF distress call mandatory)
  • No commercial use permitted (*Including bunkering)
  • EPIRB activation required for unmanned vessels
No fees; max 48-hour stay (*Extendable with MSA approval)

Additional Information:

  • Navigation:
    • Coordinates: WGS-84 (China Maritime Chart Datum) with ±0.1m accuracy
    • Depths: Chart Datum (CD) with ±0.3m seasonal variation (*Tidal range 3.2-5.8m)
    • Currents: 1-2 knots (neap), 3 knots (spring tide); eddies near No.3 Anchorage (*Vortex at 119°30’55″E)
    • Underwater pipelines: 2x 800mm gas lines cross No.2 Anchorage (marked by yellow buoys)
  • Regulations:
    • VHF: Ch 16 (Distress), 08 (Port Control), 71 (MSA), 13 (Bridge-to-bridge) (*Added Ch 13)
    • AIS: Mandatory continuous transmission (failure = Â¥5,000 fine + detention)
    • Typhoon season (June-September): Mandatory evacuation if wind > Beaufort 10 (*Or wave >4m)
    • Ballast: Exchange prohibited within 12nm (China MEP Regulation 2018) (*Sampling required)
  • Operational Notes:
    • Anchorage reductions: 30% during dredging (NOTMAR), 50% during naval exercises
    • Night navigation: Restricted for >80,000 DWT (*Except with 2 pilots)
    • Anchor chains: Minimum 6 shackles for VLCCs (*CCS Rule Pt.3 Ch.2)
    • Pollution: Zero discharge policy (inc. sewage) – fines up to Â¥200,000

 

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article