27.8 C
Singapore
Monday, April 28, 2025
spot_img

Port Disbursement Guides of Fangcheng Port

Must read

1. Port Fee Structure & Mandatory Charges

Category Service Rate (USD) Basis Regulatory Reference
Navigation Port Dues 0.18/GT (min $850) Per call Fangcheng Tariff Art.12
Pilotage 450-1,200 LOA-based MSA Notice 2023-45
Tug Assistance 350-800/hr Bollard pull Port Ops Manual 8.2
Berth Charges 0.12/GT/day 24hr period Tariff Art.15
Environmental Oily Waste 120/ton (min 2t) MARPOL Annex I Port Rule 5.3
Garbage 80/ton (min $200) MARPOL Annex V Port Rule 5.5
Ballast Water 0.08/ton BWM Convention China MEPC 2023

2. Utility Services & Operational Costs

Service Specifications Rate Cost-Saving Measure
Fresh Water WHO standards, 50t/hr capacity 3.80/ton Pre-book to avoid 20% surcharge
Shore Power 440V/60Hz, 3.5MW 0.15/kWh 30% discount 0000-0600
Gangway Rental 12m standard 120/day Bring own equipment

3. Cost Optimization Framework

  • Pre-Arrival Planning:
    1. Documentation:
      • Complete set submitted 72hrs prior (saves $500-1,500/hr demurrage)
      • Required: ETA, Cargo Manifest, Crew List, DG Declaration
    2. Bunkering Strategy:
      Fuel Type Fangcheng Nearest Alternatives Price Variance
      LSMGO 0.1% 720/ton Haiphong: 695
      Hainan: 710
      +25 to +10
  • Operational Efficiency:
    • Cargo Handling:
      • Day Shift Premium: 15% (avoid when possible)
      • Simultaneous Ops: 10% discount for combined loading/unloading

4. Safety-Critical Expenditures

  • Mandatory Safety Services:
    Service Provider Rate Regulation
    Fire Watch Port Security 85/hr SOLAS XI-2
    Gas Freeing ChemSafety Ltd. 1,200/operation ISGOTT Ch.10
  • Recommended Safety Upgrades:
    • Mooring Line Inspection: $350 (prevents $5,000+ breakage costs)
    • Emergency Drills: Free (required within 24hrs of arrival)

5. Financial Management

  • Payment Options:
    • Standard: Cash against documents
    • Credit Terms:
      • 30-day: For operators with >5 annual calls
      • 2% discount: Advance wire transfer
  • Dispute Resolution:
    • Port Master’s Office: Initial arbitration
    • Maritime Court: For claims >$50,000

6. Regulatory Compliance Verification

  • Certification Requirements:
    • Valid IOPP Certificate
    • BWMC Compliance Document
    • ISPS Code Implementation
  • Port State Control Focus:
    • Fuel Oil Sampling (3 samples per delivery)
    • Garbage Record Book Audits

7. Recent Operational Updates

  • New Southside Terminal:
    • Berths 12-15 operational since 2024-01
    • 20% higher cargo handling rates
  • Digital Clearance System:
    • e-Port app reduces agency fees by 15%
    • Mandatory for all vessels >10,000GT from 2024-04

 

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article