26.9 C
Singapore
Thursday, May 1, 2025
spot_img

Port Disbursement Guides of Huludao Port

Must read

1. Mandatory Port Charges

Fee Type Rate (USD) Calculation Basis Regulatory Reference Cost Control & Safety Notes
Port Dues 0.25/GT (max $12,500) Gross Tonnage Huludao Port Tariff No.2023-01
Amended 2024-03
• GT certificate must be valid (saves $0.05/GT for vessels <10 years old)
• Safety inspection required for vessels >20 years (+5% surcharge)
Pilotage $450 (basic) + $3.5/GT
Night: +30%
GT + Distance zones MSA Notice 2022-07
Huludao Pilotage Regulation Art.8
• Mandatory for vessels >10,000 GT
• Minimum 2 pilots required for LOA>200m
• Emergency pilotage (+50%) available 24/7
Berthage $0.18/GT/day
Oil Terminal: +20%
GT × Days (prorated hourly) Port Rule HL-2024-BTH
Dangerous Cargo Annex
• Central Berths 1-3: $0.21/GT/day (reinforced for heavy lifts)
• Marginal Berths 4-6: 15% discount
• Safety zone clearance required before docking
Towage $1,200/assist (min 2)
Harbor Tug: 3,200 BHP
LOA × Beam × Draft Huludao Tug Co. Rate Card 2024
MSA Tug Standard GB/T 29110
• 4 tugs mandatory for VLCCs
• Tug power must exceed 5% of vessel’s GT
• Emergency towing gear inspection required
Quarantine $300 base
Medical Waste: +$150
Per inspection China Customs Notice 2024-05
WHO Port Health Guide
• Crew health declarations mandatory
• Vaccination records must be current
• Medical waste must be double-bagged

2. Discretionary Services

Service Standard Rate Safety Requirements Regulatory Reference
Fresh Water $25/ton
(min 50 tons)
• ISPS compliant delivery
• Backflow prevention valves required
Port Water Quality GB 5749-2022
Garbage Disposal $120-400/type
(segregated)
• MARPOL categories must be labeled
• Incinerator available ($250/load)
MEPC.1/Circ.896 Rev.2
Sludge Removal $80/m³
(min 5m³)
• Flash point certification required
• No mixing with cargo residues
IMO Resolution MEPC.365(79)
Shore Power $0.12/kWh
(440V/60Hz)
• IEC/ISO/IEEE 80005-1 compliant
• Ground fault protection mandatory
China GB/T 35725-2021
Emergency Response $2,500 standby
+$1,500/hr active
• Pre-arrival drill report required
• Minimum 2 escape routes marked
SOLAS Chapter XI-2

3. Bunkering Operations

Fuel Type Price (USD/ton) Safety Protocols Testing Standards
IFO 380 520 (barge)
+15 delivery
• Hot work permit required
• 30m safety zone
ISO 8217:2017
MGO 780 (truck)
+20 delivery
• Static bonding wires
• No-smoking 50m radius
ASTM D975
LNG 680 (special barge)
+25 delivery
• Gas detection system
• Emergency shutdown drills
IGF Code Ch.16

Bunkering Safety Checklist:

  1. Confirm barge has valid SIRE report
  2. Verify fuel compatibility with engine specs
  3. Conduct pre-transfer safety meeting
  4. Test emergency stop systems
  5. Post “No Smoking” signs in 3 languages

4. Navigation Safety Fees

Service Rate Regulation Operational Requirements
VTS Monitoring $0.03/GT IMO A.857(20) • AIS must be operational
• Mandatory for >300 GT
Dredging Surcharge $0.01/GT Port Rule HL-2024-DRG • Applies to vessels >9m draft
• Updated bathymetry charts required
Icebreaker Escort $5,000/day China MSA Winter Nav • Mandatory when ice >30cm
• Hull ice class certification

5. Compliance Verification

  • Required Certificates:
    1. Valid Class Certificate (ABS/LR/DNV)
    2. Port State Control clearance (no outstanding deficiencies)
    3. Crew competency certificates (STCW compliant)
    4. Dangerous cargo manifest (if applicable)
  • Port Safety Inspections:
    • Firefighting systems (tested within 3 months)
    • Life-saving equipment (annual servicing tags)
    • Pollution prevention equipment (OPRC compliance)

6. Emergency Contacts

Service Contact Response Time
Port Control VHF Ch.16/12 24/7 immediate
Medical Emergency +86-429-120 <15 minutes
Oil Spill Response +86-429-119 <30 minutes
Security Alert ISPS Hotline <10 minutes

7. Official References

Master’s Final Checklist:

  1. Verify all safety equipment is operational and certified
  2. Confirm crew has completed port-specific safety training
  3. Check weather forecasts and tidal windows
  4. Validate bunker calculations with chief engineer
  5. Ensure emergency muster list is posted

 

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article