27.8 C
Singapore
Sunday, April 27, 2025
spot_img

Port Disbursement Guides of Jinzhou Port

Must read

1. Port Dues & Tariff Structure

  • Vessel Dues:
    Vessel Type Rate per GT (USD) Discount Condition Legal Basis
    General Cargo 0.24 15% for Green Ships JPA Reg. 2024-11
    Container 0.28 10% for >5,000 TEU capacity LNPT Tariff Schedule
    Bulk Carrier 0.22 20% shore power discount EPB Circular 2024
    Tankers 0.30 5% double-hull discount MARPOL Annex I
    RO-RO 0.26 New: 8% for battery ferries 2024 Green Port Initiative

    Note: Minimum charge 500GT as per China MSA Notice 2024-21

  • Berth Charges:
    • Standard berth: $0.08 per GT per day (24hr period)
    • Dedicated terminal: $0.12 per GT per day
    • Idle time surcharge: +25% after 48hrs (cumulative)
    • New: Night operations (1800-0600) +12% labor surcharge
  • New: Environmental Fees:
    • Air emission monitoring: $125 per call (>5,000GT)
    • Waste processing: $0.15/GT minimum
    • Ballast water testing: $350 if sampling required

2. Mandatory Service Charges

  • Pilotage Fees:
    Channel Section Rate per GT (USD) Minimum Charge Notes
    Outer Channel 0.0024 500 Includes boarding service
    Inner Channel 0.0030 750 Hazardous cargo +15%
    Berthing 0.0015 300 Per movement
    New: Special Tidal 0.0036 900 For <2m underkeel clearance
  • Tug Assistance:
    • Standard tug: $450/hour (minimum 2hrs)
    • Harbor tug: $600/hour
    • Discount: 10% for pre-booked packages
    • New: LNG-powered tugs available at no surcharge
    • Size premiums:
      • Vessels >230m LOA: +15%
      • Beaufort >7 conditions: +25%
  • New: Line Handling:
    • Automatic mooring: $35 per line
    • Manual mooring: $25 per line
    • Emergency release testing: $120 (Mandatory for tankers)

3. Cargo Handling Charges

  • Container Operations:
    Size Loading (USD) Discharging (USD) Special Conditions
    20′ Standard 12.50 14.00 +$2.50 for heavy (>28T)
    40′ Standard 18.00 20.00 +$3.00 for heavy (>30.5T)
    40′ Reefer 28.00 30.00 Includes monitoring
    New: 45′ HC 22.00 24.00 Stacking limited to 5 high

    Volume discounts: 5% >500TEU, 8% >1,000TEU per call

  • Bulk Cargo:
    • Coal/Iron Ore: $3.20 per MT (base rate)
    • Grain: $3.80 per MT (including basic trimming)
    • New: Self-trimming discount: -$0.40/MT for proper declarations
    • Premium service (24hr ops): +15% surcharge
    • Dust suppression: $0.25/MT (Mandatory for coal)
  • New: Project Cargo:
    • OOG Handling: $45 per lift (<100T)
    • Heavy lift surcharge: $125 per ton (>100T)
    • Special berth allocation: $1,200 per day

4. Cost Control Strategies

  • Pre-Arrival Planning:
    • Draft optimization:
      • Maximize tidal window (save $2,000-5,000 per call)
      • Consult JPA tide tables (48hrs before ETA)
      • New: Hydrographic survey data available upon request
    • Document preparation:
      • Complete e-declaration (avoid $125/hr waiting fees)
      • Pre-clear dangerous goods docs (save 4-8hrs)
      • New: Digital bunker delivery notes accepted
  • Operational Efficiency:
    • Equipment coordination:
      • Cluster crane moves (reduce $600/hr idle time)
      • Pre-stow plans (minimize yard moves)
      • New: Request same-gang continuity for >3 day operations
    • Green incentives:
      • LNG vessels: 15% dues discount
      • Shore power users: 20% reduction
      • New: Carbon credits for slow-steaming arrivals
  • Administrative Savings:
    • JPA Loyalty Program:
      • 5% rebate after 10 port calls/year
      • Priority berthing (reduces waiting time)
      • New: Free web-based ETA updates
    • Batch services:
      • Combine surveys/provisions in single call
      • Negotiate tug packages for frequent callers
      • New: Joint inspections with customs available

5. Hidden Cost Avoidance

  • Common Penalties:
    Issue Fine Range Prevention Regulatory Basis
    Garbage Records $300-1,200 Digital submission pre-arrival MARPOL Annex V
    Late Documentation $500+ Use China Single Window MSA Circular 2024
    Mooring Violations $1,000+ Pre-arrival equipment checks SOLAS Reg.II-1/3-8
    New: Cyber Security $3,000-5,000 Annual system audits IMO MSC.428(98)
  • Seasonal Surcharges:
    • Winter operations (Dec-Feb): +12% labor costs
    • Typhoon season prep: Mandatory $800 equipment check
    • New: Fog season (Mar-May): +8% pilotage surcharge
  • New: Demurrage Triggers:
    • Customs hold: $1,500/day after 24hrs
    • Labor disputes: Force majeure declaration required
    • Cargo discrepancies: Minimum 4hr survey delay

6. Comparative Cost Analysis

Service Jinzhou Regional Avg. Saving Tip Verification Source
Container Handling $14/TEU $16/TEU Volume discounts >500 TEU CTS Q2 2024 Report
Bulk Loading $3.20/MT $3.50/MT Self-trimming saves $0.40/MT Dry Bulk Terminals Index
Pilotage $0.0030/GT $0.0035/GT Combine outer/inner transits China Pilotage Assoc.
New: Waste Disposal $0.15/GT $0.18/GT Pre-sort recyclables Green Port Benchmark

7. Verification Contacts

  • Port Accounting: +86-416-315-6775 (English service)
  • Tariff Consultation: +86-416-315-6228
  • E-billing Support: billing@jinzhouport.com.cn
  • New: Green Port Incentives Desk: sustainability@jinzhouport.com.cn

Professional Advisory:

Early submission of stowage plans can save 5-7% in handling costs
Night operations (1800-0600) incur 12% labor surcharge
Vessels exceeding 230m LOA pay 15% premium on tug services

Request current tide tables 72hrs before arrival (not 48hrs)
Heavy weather surcharges now apply at Beaufort 7 (not 8)
Electronic mooring reports mandatory since 1 June 2024
Customs holds count from completion of discharge (not arrival)

 

 

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article