1. Port Dues & Tariff Structure
- Vessel Dues:
Vessel Type Rate per GT (USD) Discount Condition Legal Basis General Cargo 0.24 15% for Green Ships JPA Reg. 2024-11 Container 0.28 10% for >5,000 TEU capacity LNPT Tariff Schedule Bulk Carrier 0.22 20% shore power discount EPB Circular 2024 Tankers 0.30 5% double-hull discount MARPOL Annex I RO-RO 0.26 New: 8% for battery ferries 2024 Green Port Initiative Note: Minimum charge 500GT as per China MSA Notice 2024-21
- Berth Charges:
- Standard berth: $0.08 per GT per day (24hr period)
- Dedicated terminal: $0.12 per GT per day
- Idle time surcharge: +25% after 48hrs (cumulative)
- New: Night operations (1800-0600) +12% labor surcharge
- New: Environmental Fees:
- Air emission monitoring: $125 per call (>5,000GT)
- Waste processing: $0.15/GT minimum
- Ballast water testing: $350 if sampling required
2. Mandatory Service Charges
- Pilotage Fees:
Channel Section Rate per GT (USD) Minimum Charge Notes Outer Channel 0.0024 500 Includes boarding service Inner Channel 0.0030 750 Hazardous cargo +15% Berthing 0.0015 300 Per movement New: Special Tidal 0.0036 900 For <2m underkeel clearance - Tug Assistance:
- Standard tug: $450/hour (minimum 2hrs)
- Harbor tug: $600/hour
- Discount: 10% for pre-booked packages
- New: LNG-powered tugs available at no surcharge
- Size premiums:
- Vessels >230m LOA: +15%
- Beaufort >7 conditions: +25%
- New: Line Handling:
- Automatic mooring: $35 per line
- Manual mooring: $25 per line
- Emergency release testing: $120 (Mandatory for tankers)
3. Cargo Handling Charges
- Container Operations:
Size Loading (USD) Discharging (USD) Special Conditions 20′ Standard 12.50 14.00 +$2.50 for heavy (>28T) 40′ Standard 18.00 20.00 +$3.00 for heavy (>30.5T) 40′ Reefer 28.00 30.00 Includes monitoring New: 45′ HC 22.00 24.00 Stacking limited to 5 high Volume discounts: 5% >500TEU, 8% >1,000TEU per call
- Bulk Cargo:
- Coal/Iron Ore: $3.20 per MT (base rate)
- Grain: $3.80 per MT (including basic trimming)
- New: Self-trimming discount: -$0.40/MT for proper declarations
- Premium service (24hr ops): +15% surcharge
- Dust suppression: $0.25/MT (Mandatory for coal)
- New: Project Cargo:
- OOG Handling: $45 per lift (<100T)
- Heavy lift surcharge: $125 per ton (>100T)
- Special berth allocation: $1,200 per day
4. Cost Control Strategies
- Pre-Arrival Planning:
- Draft optimization:
- Maximize tidal window (save $2,000-5,000 per call)
- Consult JPA tide tables (48hrs before ETA)
- New: Hydrographic survey data available upon request
- Document preparation:
- Complete e-declaration (avoid $125/hr waiting fees)
- Pre-clear dangerous goods docs (save 4-8hrs)
- New: Digital bunker delivery notes accepted
- Draft optimization:
- Operational Efficiency:
- Equipment coordination:
- Cluster crane moves (reduce $600/hr idle time)
- Pre-stow plans (minimize yard moves)
- New: Request same-gang continuity for >3 day operations
- Green incentives:
- LNG vessels: 15% dues discount
- Shore power users: 20% reduction
- New: Carbon credits for slow-steaming arrivals
- Equipment coordination:
- Administrative Savings:
- JPA Loyalty Program:
- 5% rebate after 10 port calls/year
- Priority berthing (reduces waiting time)
- New: Free web-based ETA updates
- Batch services:
- Combine surveys/provisions in single call
- Negotiate tug packages for frequent callers
- New: Joint inspections with customs available
- JPA Loyalty Program:
5. Hidden Cost Avoidance
- Common Penalties:
Issue Fine Range Prevention Regulatory Basis Garbage Records $300-1,200 Digital submission pre-arrival MARPOL Annex V Late Documentation $500+ Use China Single Window MSA Circular 2024 Mooring Violations $1,000+ Pre-arrival equipment checks SOLAS Reg.II-1/3-8 New: Cyber Security $3,000-5,000 Annual system audits IMO MSC.428(98) - Seasonal Surcharges:
- Winter operations (Dec-Feb): +12% labor costs
- Typhoon season prep: Mandatory $800 equipment check
- New: Fog season (Mar-May): +8% pilotage surcharge
- New: Demurrage Triggers:
- Customs hold: $1,500/day after 24hrs
- Labor disputes: Force majeure declaration required
- Cargo discrepancies: Minimum 4hr survey delay
6. Comparative Cost Analysis
Service | Jinzhou | Regional Avg. | Saving Tip | Verification Source |
---|---|---|---|---|
Container Handling | $14/TEU | $16/TEU | Volume discounts >500 TEU | CTS Q2 2024 Report |
Bulk Loading | $3.20/MT | $3.50/MT | Self-trimming saves $0.40/MT | Dry Bulk Terminals Index |
Pilotage | $0.0030/GT | $0.0035/GT | Combine outer/inner transits | China Pilotage Assoc. |
New: Waste Disposal | $0.15/GT | $0.18/GT | Pre-sort recyclables | Green Port Benchmark |
7. Verification Contacts
- Port Accounting: +86-416-315-6775 (English service)
- Tariff Consultation: +86-416-315-6228
- E-billing Support: billing@jinzhouport.com.cn
- New: Green Port Incentives Desk: sustainability@jinzhouport.com.cn
Professional Advisory:
Early submission of stowage plans can save 5-7% in handling costs
Night operations (1800-0600) incur 12% labor surcharge
Vessels exceeding 230m LOA pay 15% premium on tug services
Request current tide tables 72hrs before arrival (not 48hrs)
Heavy weather surcharges now apply at Beaufort 7 (not 8)
Electronic mooring reports mandatory since 1 June 2024
Customs holds count from completion of discharge (not arrival)