1. PORT DUES & TONNAGE TAXES
- Calculation Basis:
• GT for ships < 10,000 GT: NT$3.2 per GT
• GT for ships ≥ 10,000 GT: NT$2.8 per GT
• Minimum charge: NT$15,000 per call
• Passenger vessels: +20% surcharge
- Discounts Available:
• 15% reduction for green ships (ESI > 50)
• 20% lower for regular callers (>12 visits/year)
• 10% LNG vessel discount (IMO Certificate required)
2. BERTHING CHARGES
- Container Terminals:
• First 24 hours: NT$0.45/GT/hour
• Subsequent hours: NT$0.60/GT/hour
• Refrigerated container surcharge: NT$120/TEU/day
- General Cargo:
• Day rate: NT$28,000 per 150m berth
• Night surcharge: +15% (2200-0600)
• Project cargo: +30% handling premium
3. PILOTAGE FEES
- Standard Rates:
• Basic fee: NT$12,500 + NT$15.8/GT
• Night/Holiday: +30% surcharge
• Special vessels (LNG/LPG): +50%
- Cost-Saving Tips:
• Book pilots 72hr in advance (-8%)
• Use same pilot for multiple ports
• Combine movements during daylight
4. TUG SERVICES
- Pricing Structure:
• 2,400 BHP: NT$14,800/hour
• 3,200 BHP: NT$18,200/hour
• 4,800 BHP: NT$24,500/hour
• Standby charge: 40% of hourly rate
- Optimization:
• Pre-arrange tug numbers (saves 15-20%)
• Limit standby time to 30min maximum
• Verify actual BHP requirements
5. LINE HANDLING CHARGES
- Standard Rates:
• Mooring/unmooring: NT$6,800 per operation
• Additional lines: NT$950 per line
• Emergency line replacement: NT$4,200/line
- Cost Control:
• Provide correct line requirements in advance
• Avoid last-minute changes (+25% penalty)
• Inspect lines before operations
6. WASTE DISPOSAL COSTS
- Standard Fees:
• Garbage: NT$1,200/m³ (min 2m³)
• Oily waste: NT$5,800/m³
• Sewage: NT$3,200 per discharge
• Hazardous waste: NT$9,500/m³
- Reduction Methods:
• Consolidate waste streams
• Use port reception facilities only when full
• Pre-treatment to reduce volume
7. PORT AGENCY FEES
- Market Range:
• Standard agency: NT$45,000-65,000
• Bulk carriers: +15-20% premium
• Tankers: +25% HSSE compliance fee
- Negotiation Tips:
• Request fixed-fee packages
• Compare 3+ competitive quotes
• Clarify overtime cost structure
8. BUNKERING COSTS
- 2024 Pricing:
• IFO380: $585/tonne
• MGO: $820/tonne
• LNG: $750/tonne
• Biofuel blends: $890/tonne
- Purchasing Strategies:
• Time purchases during 15th-20th monthly
• Consider bonded delivery options
• Verify mass flow meter certification
9. PORT COST CONTROL MEASURES
- Operational Efficiency:
• Reduce idle time (saves NT$18,000/hr)
• Optimize cargo ops sequencing
• Implement parallel operations
- Administrative:
• E-documentation (saves 8-12 hours)
• Consolidated billing (5% discount)
• Bulk payment arrangements
- Technology:
• Digital pre-clearance
• Automated mooring systems
• Smart bunker monitoring
10. OFFICIAL FEE SCHEDULE
Service | Unit | Cost (NT$) | Regulation Reference |
---|---|---|---|
Quarantine Inspection | per ship | 8,400 | PHB Order 113-A2 |
Customs Clearance | basic fee | 12,000 | Customs Act Art.42 |
Fresh Water | per ton | 85 | KPA Water Tariff |
Electricity | per kWh | 7.8 | MPB Notice 2024-6 |
Security Surcharge | per call | 5,200 | ISPS Code Implementation |
11. DISPUTE RESOLUTION PROCESS
- Billing Errors:
• File within 7 days
• Arbitration available
• Required documentation: original invoices, ship logs
- Refund Procedures:
• 45 day processing time
• Requires original receipts
• Electronic claims accepted via KPA Portal
12. NEW ADDITIONS: AUXILIARY SERVICES
- Crew Change Fees:
• Immigration processing: NT$2,800/person
• Shuttle service: NT$4,500/vehicle
- Technical Services:
• Stack pressure testing: NT$15,000
• UAV inspections: NT$28,000/survey
COST BENCHMARKING DATA
- Average Containership Call (5,000 TEU): NT$1.2-1.5M
- Bulk Carrier (Panamax): NT$850,000-950,000
- Tanker (Aframax): NT$1.1-1.3M
- ROPAX Ferries: NT$680,000-750,000