24.8 C
Singapore
Tuesday, April 29, 2025
spot_img

Port Disbursement Guides of Keelung Port

Must read

1. PORT DUES & TONNAGE TAXES

  • Calculation Basis:

    • GT for ships < 10,000 GT: NT$3.2 per GT

    • GT for ships ≥ 10,000 GT: NT$2.8 per GT

    • Minimum charge: NT$15,000 per call

    • Passenger vessels: +20% surcharge

  • Discounts Available:

    • 15% reduction for green ships (ESI > 50)

    • 20% lower for regular callers (>12 visits/year)

    • 10% LNG vessel discount (IMO Certificate required)

2. BERTHING CHARGES

  • Container Terminals:

    • First 24 hours: NT$0.45/GT/hour

    • Subsequent hours: NT$0.60/GT/hour

    • Refrigerated container surcharge: NT$120/TEU/day

  • General Cargo:

    • Day rate: NT$28,000 per 150m berth

    • Night surcharge: +15% (2200-0600)

    • Project cargo: +30% handling premium

3. PILOTAGE FEES

  • Standard Rates:

    • Basic fee: NT$12,500 + NT$15.8/GT

    • Night/Holiday: +30% surcharge

    • Special vessels (LNG/LPG): +50%

  • Cost-Saving Tips:

    • Book pilots 72hr in advance (-8%)

    • Use same pilot for multiple ports

    • Combine movements during daylight

4. TUG SERVICES

  • Pricing Structure:

    • 2,400 BHP: NT$14,800/hour

    • 3,200 BHP: NT$18,200/hour

    • 4,800 BHP: NT$24,500/hour

    • Standby charge: 40% of hourly rate

  • Optimization:

    • Pre-arrange tug numbers (saves 15-20%)

    • Limit standby time to 30min maximum

    • Verify actual BHP requirements

5. LINE HANDLING CHARGES

  • Standard Rates:

    • Mooring/unmooring: NT$6,800 per operation

    • Additional lines: NT$950 per line

    • Emergency line replacement: NT$4,200/line

  • Cost Control:

    • Provide correct line requirements in advance

    • Avoid last-minute changes (+25% penalty)

    • Inspect lines before operations

6. WASTE DISPOSAL COSTS

  • Standard Fees:

    • Garbage: NT$1,200/m³ (min 2m³)

    • Oily waste: NT$5,800/m³

    • Sewage: NT$3,200 per discharge

    • Hazardous waste: NT$9,500/m³

  • Reduction Methods:

    • Consolidate waste streams

    • Use port reception facilities only when full

    • Pre-treatment to reduce volume

7. PORT AGENCY FEES

  • Market Range:

    • Standard agency: NT$45,000-65,000

    • Bulk carriers: +15-20% premium

    • Tankers: +25% HSSE compliance fee

  • Negotiation Tips:

    • Request fixed-fee packages

    • Compare 3+ competitive quotes

    • Clarify overtime cost structure

8. BUNKERING COSTS

  • 2024 Pricing:

    • IFO380: $585/tonne

    • MGO: $820/tonne

    • LNG: $750/tonne

    • Biofuel blends: $890/tonne

  • Purchasing Strategies:

    • Time purchases during 15th-20th monthly

    • Consider bonded delivery options

    • Verify mass flow meter certification

9. PORT COST CONTROL MEASURES

  • Operational Efficiency:

    • Reduce idle time (saves NT$18,000/hr)

    • Optimize cargo ops sequencing

    • Implement parallel operations

  • Administrative:

    • E-documentation (saves 8-12 hours)

    • Consolidated billing (5% discount)

    • Bulk payment arrangements

  • Technology:

    • Digital pre-clearance

    • Automated mooring systems

    • Smart bunker monitoring

10. OFFICIAL FEE SCHEDULE

Service Unit Cost (NT$) Regulation Reference
Quarantine Inspection per ship 8,400 PHB Order 113-A2
Customs Clearance basic fee 12,000 Customs Act Art.42
Fresh Water per ton 85 KPA Water Tariff
Electricity per kWh 7.8 MPB Notice 2024-6
Security Surcharge per call 5,200 ISPS Code Implementation

11. DISPUTE RESOLUTION PROCESS

  • Billing Errors:

    • File within 7 days

    • Arbitration available

    • Required documentation: original invoices, ship logs

  • Refund Procedures:

    • 45 day processing time

    • Requires original receipts

    • Electronic claims accepted via KPA Portal

12. NEW ADDITIONS: AUXILIARY SERVICES

  • Crew Change Fees:

    • Immigration processing: NT$2,800/person

    • Shuttle service: NT$4,500/vehicle

  • Technical Services:

    • Stack pressure testing: NT$15,000

    • UAV inspections: NT$28,000/survey

COST BENCHMARKING DATA

  • Average Containership Call (5,000 TEU): NT$1.2-1.5M
  • Bulk Carrier (Panamax): NT$850,000-950,000
  • Tanker (Aframax): NT$1.1-1.3M
  • ROPAX Ferries: NT$680,000-750,000
spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article