26.3 C
Singapore
Wednesday, April 30, 2025
spot_img

Port Disbursement Guides of Lanshan Port

Must read

1. MANDATORY PORT CHARGES

Service Rate (USD) Basis Regulatory Reference
Pilotage (Inner Harbor) 0.38/GT Gross Tonnage Shandong MSA Tariff No.SD-2023-11
Tug Assistance (Basic) 1,200/hour Minimum 4 hrs for VLCCs Port Operation Rule Art.7
Tug Assistance (Emergency) 3,500 flat fee After-hours response Port Contingency Schedule
Berth Dues 0.12/GT/day Pro-rata after 4 hours IMO Port Pricing Guidelines
VTS Fees Fixed 850 Per port call SOLAS Ch.V Reg.12
Garbage Disposal 120-400 0-10m³/11-20m³ MARPOL Annex V
Anti-Pollution Fee 0.08/GT Mandatory EPL 2021 Art.42

2. CARGO HANDLING COSTS

Cargo Type Day Rate Night Rate Special Notes
Dry Bulk (per ton) 3.20 4.16 (+30%) Includes dust suppression
Containers (TEU) 85 102 (+20%) Reefers +25%
Liquid Bulk (per ton) 2.80 3.92 (+40%) Class I chemicals +15%
RO-RO (per lane meter) 12.50 16.25 (+30%) Minimum 100m charge

3. UTILITY SERVICES

Service Rate Minimum Technical Standard
Shore Power (per kWh) 0.28 2,000kWh IEC/ISO/IEEE 80005-1
Potable Water (per ton) 4.50 50 tons WHO Guidelines
Bunker Delivery (service fee) 15/ton 100 tons ISO 13739
Sludge Removal (per m³) 85 5m³ MARPOL Annex I

4. COST REDUCTION STRATEGIES

  • Documentation Efficiency
    • E-submission 48hrs prior: 5% discount (Port Circular 2024-06)
    • Single Window completion: 2hrs off processing time
  • Operational Optimization
    • Daytime cargo ops: Avoids 20-40% night surcharges
    • Tide planning: Saves 1-2 tug hours per movement
  • Service Bundling
    • Waste+oil disposal combo: 18% discount (EPL Art.31)
    • Annual volume contracts: 5-12% tiered rebates
  • Fuel Management
    • Shore power break-even: 8hrs at 1.5MW load
    • Bunkering during cargo ops: Saves 6-8hrs port time

5. HIDDEN COST ALERTS

Item Trigger Condition Rate
Overtime Labor After 2000hrs +50% base rate
Holiday Operations Official holidays Double rates
Delay Penalties Beyond 2hr grace 1,200/hour
Special Surveys Random PSC inspections 850 flat fee

6. DISPUTE RESOLUTION

  • Evidence Requirements
    • Notarized time logs (ISO 8601 format)
    • Class-approved survey reports
  • Resolution Pathway
    1. Protest filing within 7 days (MSA Form P-112)
    2. Port accountant review (max 10 days)
    3. Arbitration under CIETAC Rules if unresolved

7. REGIONAL COST COMPARISON

Service Lanshan Qingdao Shanghai
Container Handling (TEU) 85 92 110
Bulk (per ton) 3.20 3.45 4.10
Shore Power (per kWh) 0.28 0.32 0.40

 

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article