25.6 C
Singapore
Saturday, April 26, 2025
spot_img

Port Disbursement Guides of Mailiao Port

Must read

1. Vessel-Related Charges

Fee Type Calculation Basis Rate (USD) Notes
Port Dues GT per call 0.28/GT Min $1,800, max $25,000
Harbor Dues GT per day 0.12/GT After first 24h free
Pilotage LOA x draft
  • Basic: 0.15/GT
  • Night: +30%
  • Holiday: +50%
Min $1,200
Shifting Charges Per movement
  • 0-500m: $800
  • 500-1000m: $1,500
  • >1000m: $2,500
Including pilot
Tug Assistance Per tug/hour
  • 2,400hp: $450
  • 4,000hp: $650
  • 6,000hp: $850
  • 8,000hp: $1,100
Min 2 hours charge
Berth Occupancy Per m²/day 3.50 After free 24h
Mooring/Unmooring Per operation 400/line Min 4 lines, max 12 lines
Light Dues GT per call 0.03/GT Min $300
Quarantine Per inspection 350 Free if no issues found
Customs Clearance Per declaration 200 Inbound/outbound separate
Lighterage Per barge move 1,200 Min 2 barges
Hatch Handling Per hatch
  • Opening: $150
  • Closing: $150
Mechanical only
Trimming Per hour 250 Min 4 hours
Oil Boom Per deployment
  • Small: $800
  • Large: $1,500
Mandatory for tankers

2. Service Charges

Service Unit Rate (USD) Notes
Garbage Disposal Per m³
  • Normal: 85
  • Hazardous: 120
Min 1m³
Slop Reception Per m³ 150 Min 5m³
Fresh Water Per ton 5.00 Min 50 tons
Bunkering Service fee 300 + actual fuel cost
LNG Bunkering Service fee 1,200 Special equipment required
Shore Power Per kWh 0.18 Min 8h connection
Ship Chandler Service fee 250 + goods cost
ISPS Security Per day 180 Mandatory for all vessels
Fire Patrol Per hour 85 Required for hot work
Fumigation Per treatment
  • Spaces <20,000m³: $1,500
  • Spaces >20,000m³: $2,500
24h quarantine period
Ship Inspection Per survey 400 On-hire/off-hire
Crew Transport Per vehicle
  • Car: 50/trip
  • Van: 80/trip
Port area only
Post/Courier Service fee 25 + postage costs
Ship Agency Basic fee 1,200 + disbursements

3. Cargo-Related Charges

Fee Type Calculation Basis Rate (USD) Notes
Cargo Dues Per ton
  • General: 1.20
  • Container: 0.80/TEU
  • Dangerous: +30%
  • Bulk: 0.60
Min $3,000
Stevedoring Per ton
  • Bulk: 2.50
  • Breakbulk: 4.00
  • RO-RO: 5.00
  • Neobulk: 3.50
Min 500 tons
Storage Per ton/day
  • Days 1-3: 0.30
  • Days 4-7: 0.50
  • >7 days: 0.80
After free 48h
Wharfage Per ton 0.25 Min $500
Lashing Per container 8.00 Min $800
Tallying Per bill 0.10/ton Min $500
Barge Hire Per day
  • 500T: 1,200
  • 1,000T: 2,000
  • 2,000T: 3,500
Min 12h hire
Passenger Fees Per passenger
  • Embark: 8.00
  • Disembark: 8.00
  • Transit: 4.00
Min $400

4. Cost Control Measures

  • Pre-Arrival Planning:
    • Submit accurate ETA 72h in advance to avoid standby charges
    • Complete pre-arrival documentation electronically
    • Combine multiple services during single port call
  • Operational Efficiency:
    • Optimize ballast operations to minimize deballasting fees
    • Schedule crew changes during cargo operations
    • Use shore power during off-peak hours (0000-0600 at 50% discount)
  • Contract Negotiation:
    • Volume discounts available for >5 calls/year (up to 15%)
    • Bundled service packages (e.g., tug+pilotage 10% discount)
    • Advance payment discounts (2% for 30-day prepayment)
  • Dispute Resolution:
    • Request meter calibration certificatesfor bunkering operations
    • Verify independent tally reports before signing
    • Use port-approved surveyors for damage claims
    • Request detailed breakdown of all charges

5. Important Notes

  • Currency conversion rate: 1 USD = 30.5 TWD (fixed for 2024)
  • Non-standard services require prior quotation approval
  • Vessels must declare exact dimensions (LOA/beam/draft) for accurate charging
  • Electronic payment preferred (wire transfer fees apply)
spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article