1. Vessel-Related Charges
– Tonnage Dues:
– ¥0.85/GT for vessels <5,000 GT – ¥0.72/GT for 5,001-20,000 GT – ¥0.65/GT for >20,000 GT
– Minimum charge: ¥25,000 (Shingu Port Tariff Section 3.1)
– Port Dues:
– International vessels: ¥1.20/GT
– Domestic vessels: ¥0.90/GT
– 15% discount for vessels calling ≥12 times/year
– Pilotage:
– Compulsory for all vessels >500 GT
– Daytime (0600-1800): ¥28,000
– Nighttime (1800-0600): ¥42,000
– Cancellation fee: 50% if <2 hours notice
– Towage:
– Standard tugs (2,400HP): ¥45,000/hour
– High-power tugs (4,000HP): ¥68,000/hour
– Minimum 3 hours charge per operation
– Berthage:
– Main Wharf: ¥1,800/berth meter/day
– South Terminal: ¥2,100/berth meter/day
– Oil Terminal: ¥2,500/berth meter/day
– Mooring/Unmooring:
– Day operations: ¥18,000/operation
– Night operations: ¥27,000/operation
– Light Dues:
– Included in port dues (Japan Ports Act Article 24)
– Quarantine:
– Standard inspection: ¥48,000
– Additional sampling: ¥12,000/sample
– Customs Clearance:
– Basic clearance: ¥35,000
– Express clearance (after hours): ¥55,000
– Barge Services:
– 200T barge: ¥22,000/hour
– 500T barge: ¥35,000/hour
– Minimum 4 hours charge
– Hold Cleaning:
– Grain holds: ¥6,500/hatch
– Bulk holds: ¥8,000/hatch
– Tank cleaning: ¥12,000/tank
– Trimming:
– Mechanical trimming: ¥950/ton
– Manual trimming: ¥1,250/ton
– Oil Boom:
– Standard deployment: ¥55,000/day
– Emergency deployment: ¥85,000 + actual costs
2. Service Charges (Updated 2024)
– Garbage:
– Food waste: ¥4,200/m³
– Plastics: ¥6,800/m³
– Hazardous waste: ¥9,500/m³
– Surveys:
– Condition survey: ¥95,000/day
– Bunker survey: ¥65,000
– Fumigation:
– Methyl bromide: ¥180,000
– Phosphine: ¥220,000
– Aerial disinfection: ¥75,000
– Launch Service:
– Official launch: ¥9,000/trip
– Private launch: ¥12,000/trip
– Fire Services:
– Standby: ¥50,000/hour
– Actual firefighting: ¥120,000/hour + consumables
– ISPS:
– Level 1: ¥18,000
– Level 2: ¥35,000
– Level 3: ¥75,000
– Water Supply:
– Potable water: ¥350/ton
– Technical water: ¥220/ton
– Bunkering:
– IFO 180: Market price + 3% service fee
– MGO: Market price + 3.5% service fee
– LNG: Special quotation required
– Shore Power:
– 440V: ¥25,000 connection + ¥18/kWh
– 6.6kV: ¥40,000 connection + ¥25/kWh
– Sludge:
– Bilge water: ¥7,200/m³
– Sludge oil: ¥8,800/m³
– Chemical waste: ¥12,500/m³
– Sundries:
– Port clearance: ¥5,000
– Waste manifests: ¥3,500
– Special permits: ¥8,000-¥20,000
3. Agency & Crew Costs
– Agency Fees:
– Full agency: 0.28% of disbursements (min ¥180,000)
– Husbandry only: ¥120,000
– Tally:
– Breakbulk: ¥2,800/man-hour
– Bulk: ¥1,900/man-hour
– Containers: ¥2,100/TEU
– Crew:
– Sign-on/off: ¥30,000/crew
– Medical assistance: ¥15,000/visit
– Repatriation: Actual costs + 15%
– Communications:
– Postage: Cost + 15%
– Urgent documents: ¥5,000 + actual
– Internet access: ¥1,500/hour
4. Cargo Operations
– Cargo Dues:
– General: ¥160/ton
– Containers: ¥1,300/TEU
– Bulk: ¥90/ton
– Project cargo: ¥220/ton
– Stevedoring:
– General: ¥1,900/ton
– Containers:
– ¥900/TEU (20′)
– ¥1,350/TEU (40′)
– Ro-Ro: ¥2,700/unit
– Stowage:
– Planning: ¥30,000
– Supervision: ¥25,000/day
– Storage:
– Open yard: ¥130/ton/day
– Shed: ¥180/ton/day
– Reefer: ¥350/ton/day
– Lighterage:
– Standard: ¥25,000/hour
– Special: ¥40,000/hour
– Warehouse:
– Dry: ¥220/m²/day
– Cold: ¥480/m²/day
– Dangerous goods: ¥350/m²/day
5. Passenger Operations
– Passenger Fees:
– Domestic: ¥380/pax
– International: ¥550/pax
– Transit: ¥280/pax
– Cruise:
– Basic: ¥1,500/meter
– Utilities:
– Water: ¥400/ton
– Power: ¥30/kWh
– Waste: ¥6,000/m³
Safety-Critical Notes:
1. All bunkering operations require prior port approval
2. Waste disposal must use licensed contractors only
3. Emergency services response time: <15 minutes
4. Mandatory safety equipment checks before operations
5. Hazardous cargo operations require special permits
6. Night navigation restrictions apply for certain vessels
Cost Optimization:
1. Pre-arrange all services through agent
2. Bundle multiple services for discounts
3. Utilize free periods effectively
4. Verify all meter readings independently
5. Maintain detailed records for dispute resolution
6. Consider off-peak operations (2100-0500) for 10-15% discounts