27.4 C
Singapore
Sunday, April 27, 2025
spot_img

Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Basuo Port

Must read

 

Terminal Name Berth/Structure Name Length (m) Depth (m) DWT Capacity Max LoA (m) Type Equipment/Systems SWL (t) Main Cargo/Use Critical Notes
Basuo Oil & Gas Terminal Berth O1 (Crude) 320 14.5 80,000 280 Jetty 2×KLAW ISO 20245 arms
ESD system
3,500 m³/h Crude oil Zone 1 ATEX certified
Berth O2 (Product) 240 12.0 30,000 180 Dolphin 1×IMTT barge HN203 5,000 LSMGO Max sulfur 0.10% (MARPOL VI)
Dolphin DO3 (SPM) N/A 22.0 300,000 360 Single-point mooring Subsea manifolds 800 VLCC ops Disconnect at Beaufort ≥7
Berth L1 (LNG) 400 18.0 200,000 345 Jetty 3×Enerpac LNG arms 12,000 m³/h LNG 500m exclusion zone (IGC 2021)
Basuo Bulk Terminal Berth B1 (Coal) 300 15.2 100,000 290 Wharf 3×Liebherr HMK 640
Stacker-reclaimers
45 @30m Coal Dust suppression IAW GB 16297
Berth B2 (Iron Ore) 250 13.8 50,000 220 Pier 2×TTS unloaders 25 Iron ore Max moisture 12% (IMSBC)
Berth B3 (Phosphate) 200 11.5 20,000 170 Wharf Enclosed conveyor system 10/m Phosphate Mandatory hold washdown
Berth B4 (Clinker) 180 10.0 15,000 160 Dolphin Mobile hoppers 8 Cement clinker Rotary packers onsite
Mooring Dolphin MD4 N/A 18.5 150,000 310 Catenary Chafe chains 600 Capesize SW monsoon restriction
Basuo Container Terminal Berth C1 400 16.5 150,000 366 Quay wall 6×ZPMC STS (24 rows) 65 @45m Containers Reefer plugs: 440V/60Hz
Berth C2 (Multi-purpose) 320 14.0 50,000 280 Wharf 4×RTGs
2×RoRo ramps
40 @25m Project cargo Heavy lift zone (max 500t)
Basuo Ship Repair Complex Dry Dock DD1 280×45m N/A 80,000 270 Graving dock 2×100t gantry cranes
Firemain (8 bar)
100 Ship repairs Gas-free cert required
Basuo Lighterage Zone Area LG1-LG3 1,200 5.5-7.0 3,000 120 Barge berths 6×15t floating cranes 15 Breakbulk Tide window ±1.5hr HW
Outer Anchorage Buoy MB1-MB6 N/A 16.0-22.0 300,000 360 CAT-I buoys Automatic tensioning 250-800 VLCC/Panamax Buoy MB3 closed Jun-Sep

Mandatory Safety Protocols

  • Fire Prevention:
    • Oil terminals: Foam deluge rate ≥6.5 L/min/m² (SOLAS II-2/4)
    • LNG jetty: IR cameras (EN 54-17 certified)
  • Mooring Integrity:
    • Chain inspection: Every 6 months (OCIMF SIGTTO)
    • Mooring line SWL: ≥1.5×MBL (ISO 3730)
  • Pollution Control:
    • Oil spill response: 2×50 m³/h skimmers (OSRO Tier 2)
    • Ballast exchange: 200nm from coast (IMO BWM)

Navigational Parameters

  • Channel depth: 18.5m CD (Chart Datum)
  • Tidal range: 3.2m (neap) – 5.8m (spring)
  • Max current: 3.8 knots at spring tide
  • VTS Channels: 16 (call) & 74 (work)

Operational Limitations

  • Wind limits:
    • General cargo: Beaufort 6 (13 m/s)
    • Container ops: Beaufort 7 (17 m/s)
  • Berthing suspended during:
    • Visibility <1nm
    • Current >2.8 knots (VLCC)

 

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article