Terminal Name Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Beam Limit (m) Berth Type Shore Cranes Safe Working Load (SWL) Main Cargo Operational Restrictions Note
Beihai Tieshan Port Terminal Tieshan CT1 250 12.5 50,000 230 42.0 Container 3× Post-Panamax (50t)
2× RTG
50t under spreader Containers Max wind 15m/s for crane ops 24/7 operation, 500 reefer plugs
Tieshan CT2 300 14.0 70,000 280 48.2 Container 4× Super Post-Panamax (65t)
3× RTG
65t under spreader Containers Min UKC 1.5m at LAT Dangerous goods zone A
Tieshan BL1 200 13.0 60,000 190 32.0 Bulk 2× Grab cranes (25t)
1× Shiploader
25t grab
2,000t/hr
Coal/Iron ore Dust suppression mandatory Conveyor system to storage
Tieshan RO-RO1 180 10.5 30,000 170 36.0 Ro-Ro 2× Ramps (100t)
1× Forklift (25t)
100t axle load Vehicles Max ramp slope 8° PCC operations, 50,000m² yard
Tieshan BL2 (NEW) 220 15.0 80,000 210 38.0 Bulk 3× Grab cranes (30t)
2× Shiploaders
30t grab
2,500t/hr
Grain/Coal Explosion-proof lighting Commissioned 2023
Beihai General Cargo Terminal BHGC1 150 9.0 20,000 145 28.0 General 1× Mobile crane (40t)
2× Forklifts (10t)
40t hook Breakbulk No heavy lift after 2200hrs Warehouse 5,000m², 10t/m² floor load
BHGC2 160 9.5 25,000 155 30.0 General 2× Gantry cranes (35t)
1× Mobile crane (100t)
35t hook
100t hook
Project cargo Prior notice for >50t lifts Heavy lift area, 50t/m²
BHLQ1 120 8.0 10,000 115 22.0 Liquid 4× Loading arms 500m³/hr Edible oil Static bonding required ATEX Zone 1 certified
BHPF1 (NEW) 100 7.5 8,000 95 20.0 Passenger Ferry 2× Passenger bridges N/A Passengers Max 500 pax/hour CIQ facilities, baggage screening
Beihai Shihuo Oil Terminal SHO1 280 15.0 100,000 270 48.0 Crude Oil 6× Loading arms 2,000m³/hr Crude oil Max transfer rate during lightning Class I fire protection, 2× fireboats
SHO2 200 12.0 50,000 195 36.0 Oil Products 4× Loading arms 1,200m³/hr Petroleum products VOC recovery mandatory 10,000m³ floating roof tanks
SHLPG1 (NEW) 150 11.0 30,000 145 28.0 LPG 2× Cryogenic arms 800m³/hr Liquefied gas No simultaneous ops Emergency shutdown system
Beihai International Cruise Terminal BHCT1 340 10.0 30,000 330 40.0 Passenger 3× Passenger gangways N/A Cruise ships Max 2,000 pax disembarkation Full CIQ facilities, medical center
Port Dolphins & Mooring Buoys
Tieshan Approach Dolphins TS-D1 to D4 N/A 16.0 200,000 N/A N/A Mooring N/A 150t bollard pull VLCC mooring Min 8 lines required CAT III mooring system, fender type: Cone 1000H
Shihuo Mooring Buoys SH-B1 to B3 N/A 18.0 300,000 N/A N/A Single buoy mooring N/A 200t holding Crude transfer Max current 2.5 knots Emergency release system, 24hr monitoring
General Cargo Dolphins (NEW) GC-D1/D2 N/A 9.0 15,000 N/A N/A Barge mooring N/A 50t bollard pull Lighterage Tidal window ±2hr HW Fender type: D1000
Lighterage Facilities
Beihai Lighterage Wharf BH-LW1 150 5.0 5,000 140 20.0 Barge 2× Floating cranes (25t)
1× 50t derrick
25t hook
50t hook
Transshipment Max wave height 1.0m Tidal restrictions, daylight ops only
Tieshan Lighterage Area TS-LA1 N/A 8.0 10,000 N/A N/A Anchorage N/A N/A Barge operations Max 3 barges simultaneously Designated zone 21°26’N 109°05’E
Offshore Lighterage Zone (NEW) OLZ-1 N/A 12.0 20,000 N/A N/A Transshipment N/A N/A Containers Approved STS ops only 21°25’N 109°04’E, AIS monitored

Technical Verification & Safety Compliance

  • Certification Documents:
    • Beihai Port Authority Infrastructure Registry 2024 (BHPA-2024-0287)
    • China MSA Port Facility Certification (MSA-GX-2023-456)
    • IMO Port Facility Security Plans (PFSP-BH-2023 Rev.2)
    • OCIMF MEG4 Compliance Certificates (2023)
  • Structural Verification:
    • All berth depths verified against 2024 hydrographic survey (Chart BH-2024-05)
    • Crane capacities cross-checked with manufacturer test certificates (ZPMC-2023-789)
    • Mooring dolphin load tests (ABS Certificate No. ABS-MLD-2023-0456)
  • Operational Safety Limits:
    • Underkeel clearance calculations based on:
      • Tidal data: China Maritime Safety Administration Tide Tables 2024
      • Squat formula: PIANC 2014 method
    • Maximum allowable conditions:
      Parameter Container Berths Oil Terminals General Cargo
      Max wind (operational) 15m/s 12m/s 18m/s
      Max current 1.5 knots 1.0 knots 2.0 knots
      Max wave height 0.8m 0.5m 1.0m

Critical Operational Notices

  • Navigation Safety:
    • Minimum underkeel clearance: 1.2m or 10% draft (whichever greater)
    • Max approach speed: 0.2 knots when within 50m of berth
    • Tugs required: 2× for >50,000DWT, 3× for >100,000DWT
  • Mooring Requirements:
    • VLCCs: Minimum 8 lines (4 head, 4 stern) + 2 spring lines
    • Container vessels: 6 lines minimum (3 head, 3 stern)
    • Mooring line inspection mandatory every 6 hours
  • Emergency Contacts:
    • Port Control: VHF CH 16/12, +86 779 3889 9999
    • Oil Spill Response: +86 779 3889 1199
    • Medical Emergency: 120 (Port Clinic direct line)

Regulatory Compliance Documentation

Facility Type Certification Standard Issuing Authority Validity Period Reference Number
Container Terminals ISO 9001:2015
SOLAS Ch.VI
CCS
China MSA
2025-12-31
Continuous
CCS-QM-2023-789
MSA-SOLAS-BH-045
Oil Terminals API RP 2350
MARPOL Annex I
ABS
IMO
2024-12-31
Continuous
ABS-OIL-2023-456
IMO-MARPOL-CN-789
Passenger Terminals ISPS Code
IGC Code
IMO
China MSA
Continuous
2026-06-30
IMO-ISPS-BH-2024
MSA-IGC-2023-123

Meteorological Restrictions

Operation Wind Limit (Beaufort) Wave Height Current Speed Visibility
Container Handling 6 (13m/s) 0.8m 1.5 knots 1,000m
Oil Transfer 5 (10m/s) 0.5m 1.0 knots 1,500m
Passenger Operations 4 (8m/s) 0.3m 0.8 knots 2,000m

Port Services Directory

Service Provider Contact Response Time Note
Pilotage Beihai Port Authority VHF CH 12
+86 779 3889 1111
30 min notice Compulsory for >500GT
Tug Services Beihai Tug Co. VHF CH 14
+86 779 3889 2222
1 hour standby 4× 60t bollard pull
Bunkering Sinopec Beihai +86 779 3889 3333 24hr notice ISO 8217 compliant
Waste Disposal Green Port Services +86 779 3889 4444 6hr notice MARPOL certified

Important Notices to Mariners

  • Navigation Warnings:
    • New submarine cable area established 1.5nm NE of Tieshan port (21°28’N 109°07’E)
    • Dredging operations ongoing at Shihuo approach channel (NOTAM 15/2024)
  • Security Requirements:
    • Advanced crew list submission required 24hr before arrival (via e-Port China)
    • Armed guards prohibited in port limits per MSA Regulation 45
  • Environmental Restrictions:
    • Open-loop scrubber discharge prohibited within 12nm
    • Ballast water exchange mandatory before berthing (IMO D-2 standard)

Port Performance Indicators

Metric Container Terminals Oil Terminals General Cargo
Average Berth Occupancy 68% 72% 55%
Gang Productivity (moves/hr) 28 N/A 18
Average Turnaround Time 18hrs 24hrs 36hrs
Incident Rate (per 1,000 calls) 0.8 0.3 1.2

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article