30.4 C
Singapore
Friday, December 5, 2025
spot_img

Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Hamochi Port

Must read

Port Dolphins

Terminal Name Dolphin Name Type Depth (m) Max LoA (m) Note
Hamochi Port Main Terminal Dolphin A Mooring 7.5 120 Concrete structure
Hamochi Port Main Terminal Dolphin B Breasting 7.5 120 Concrete structure
Hamochi Port Oil Terminal Dolphin C Mooring 12.0 180 Steel structure, for tankers
Hamochi Port Container Terminal Dolphin D Breasting 10.5 150 Reinforced concrete

Mooring Buoys

Terminal Name Buoy ID Type Depth (m) Max LoA (m) Note
Hamochi Port Anchorage MB-1 Single-point 10.0 150 For temporary mooring
Hamochi Port Anchorage MB-2 Multi-point 12.0 200 For VLCC standby
Hamochi Port Emergency Anchorage MB-3 Emergency 15.0 250 Yellow marker, 24/7 monitoring

Piers

Terminal Name Pier Name Length (m) Depth (m) Max LoA (m) Note
Hamochi Fishing Port Fishing Pier 1 80 4.0 30 Small craft only
Hamochi Fishing Port Fishing Pier 2 60 3.5 25 Wooden structure
Hamochi Port Ferry Terminal Passenger Pier 50 5.0 40 Ro-Ro operations
Hamochi Port Shipyard Repair Pier 100 6.0 70 Dry dock access

Berths

Terminal Name Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes Safe Working Load (SWL) Main Cargo Note
Hamochi Port Main Terminal Berth 1 150 9.0 10,000 130 General Cargo 2 20 tons Containers, Bulk Conventional
Hamochi Port Main Terminal Berth 2 120 7.5 5,000 100 General Cargo 1 10 tons Bulk, Breakbulk Conventional
Hamochi Port Oil Terminal Berth 3 200 15.0 50,000 250 Tanker 0 N/A Crude Oil Pipeline loading
Hamochi Port Container Terminal Berth 4 180 12.0 20,000 160 Container 3 40 tons Containers Gantry cranes
Hamochi Port Bulk Terminal Berth 5 160 11.0 15,000 140 Bulk Carrier 2 30 tons Coal, Grain Conveyor system

Lighterages

Terminal Name Lighterage Name Type Depth (m) Max LoA (m) Note
Hamochi Port Inner Harbor Lighterage Area A Barge 5.0 50 For transshipment
Hamochi Port Inner Harbor Lighterage Area B Pontoon 4.0 30 For small craft
Hamochi Port Oil Terminal Lighterage Area C Oil Barge 6.0 60 For bunkering operations

Wharves

Terminal Name Wharf Name Length (m) Depth (m) Max LoA (m) Note
Hamochi Port Main Terminal West Wharf 200 8.0 110 Multi-purpose
Hamochi Port Main Terminal East Wharf 150 7.0 90 General cargo
Hamochi Port Shipyard Repair Wharf 100 6.0 70 Dry dock access
Hamochi Port Fishery Wharf North Wharf 120 5.0 50 Ice supply available

Operational Restrictions

  • Berth 3 (Oil Terminal): No hot work permitted within 50m radius
  • Lighterage Area C: Mandatory fire watch during bunkering operations
  • Fishing Piers: Commercial vessels prohibited between 0500-0700 local time
  • Emergency Anchorage (MB-3): Maximum stay 72 hours without port clearance
spot_img
- Advertisement -spot_img

More articles

- Advertisement -spot_img

Latest article

spot_img