29.9 C
Singapore
Wednesday, April 30, 2025
spot_img

Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Inchon Port

Must read

1. Port Dolphins

Terminal Name Dolphin Name Depth (m) DWT Capacity Max LoA (m) Main Cargo Note
Incheon North Port North Port Dolphin 1 12.0 50,000 250 General Cargo Reinforced concrete structure
Incheon North Port North Port Dolphin 2 12.0 50,000 250 General Cargo Reinforced concrete structure
Incheon South Port South Port Dolphin 1 14.5 70,000 280 Liquid Bulk Steel pile construction
Incheon Oil Terminal Oil Dolphin 1 16.0 120,000 320 Crude Oil Fireproof design

2. Mooring Buoys

Terminal Name Buoy Name Depth (m) DWT Capacity Max LoA (m) Main Cargo Note
Incheon Outer Anchorage Buoy A-1 15.0 100,000 300 Crude Oil Single point mooring
Incheon Outer Anchorage Buoy A-2 15.0 100,000 300 Crude Oil Single point mooring
Incheon Inner Anchorage Buoy B-1 12.0 50,000 250 Chemical Classified Zone 1
Incheon Emergency Anchorage Buoy E-1 18.0 150,000 350 Emergency Use Yellow marker

3. Piers

Terminal Name Pier Name Length (m) Depth (m) DWT Capacity Max LoA (m) Main Cargo Note
Incheon Coastal Pier Coastal Pier 1 200 8.0 20,000 150 Coastal Cargo Concrete structure
Incheon Ferry Pier International Ferry Pier 180 7.5 15,000 160 Passenger/Ro-Ro Wave breaker protected
Incheon Naval Pier Naval Pier 1 220 9.0 25,000 180 Military Restricted access

4. Berths

Terminal Name Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes Safe Working Load (SWL) Main Cargo Note
Incheon Container Terminal ICT Berth 1 350 14.0 50,000 300 Container 4 50 tons Containers Post-Panamax
Incheon Container Terminal ICT Berth 2 350 14.0 50,000 300 Container 4 50 tons Containers Post-Panamax
Incheon General Cargo Terminal GCT Berth 1 200 10.0 30,000 200 General Cargo 2 25 tons General Cargo Multi-purpose
Incheon Bulk Terminal BT Berth 1 250 13.5 60,000 230 Dry Bulk 3 40 tons Coal/Grain Conveyor system equipped
Incheon LNG Terminal LNG Berth 1 300 15.0 80,000 280 LNG 0 N/A LNG Exclusion zone 500m

5. Lighterages

Terminal Name Lighterage Name Length (m) Depth (m) DWT Capacity Max LoA (m) Main Cargo Note
Incheon Inner Harbor Lighterage 1 100 5.0 5,000 80 Bulk Cargo Barge operations
Incheon West Basin Lighterage 2 120 6.0 7,000 90 Construction Materials Restricted daylight operations
Incheon East Basin Lighterage 3 90 4.5 3,000 70 Project Cargo Prior approval required

6. Wharves

Terminal Name Wharf Name Length (m) Depth (m) DWT Capacity Max LoA (m) Main Cargo Note
Incheon Fishing Wharf Fishing Wharf 1 150 6.0 10,000 100 Fishery Products Concrete structure
Incheon Shipyard Wharf Repair Wharf 1 180 8.5 15,000 150 Ship Repair Docking facilities available
Incheon Customs Wharf Inspection Wharf 1 120 7.0 8,000 110 Customs Inspection 24/7 security

Operational Notes:
1. Maximum allowable drafts subject to tidal variations (+/- 2.5m)
2. All petroleum facilities comply with API RP 2009
3. Container handling equipment meets OCIMF standards
4. Night navigation restrictions apply to inner harbor areas

 

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article