| Jiangyin Container Terminal |
CT-1 |
250 |
12.5 (-2.0m CD) |
50,000 |
230 |
Dolphin (Concrete) |
4x ZPMC STS (Model ZQ80/65-40) |
65 |
ISO Containers |
Tandem lift capable, OCR system (ANPR/2024) |
| CT-2 |
300 |
13.0 (-2.0m CD) |
70,000 |
280 |
Pier (Ro-Ro) |
2x Kalmar STS (Model STS 65-72LB) + 1x 45t forklift |
50 |
Containers/Ro-Ro |
200 reefer plugs (380V/60Hz), DG Zone 5.1 |
| CT-3 |
200 |
11.8 (-1.8m CD) |
35,000 |
210 |
Wharf (Sheet pile) |
3x RTG (Konecranes DRF450-65S5) |
40 |
Feeder vessels |
Night ops restricted (2200-0600 LMT) |
| CT-4 |
180 |
10.0 (-1.5m CD) |
25,000 |
170 |
Dolphin (Steel) |
2x MH Crane (Liebherr LHM 280) |
35 |
Barge/DG Containers |
IMDG Class 4.1/8 dedicated area |
| CT-5 <–New/Verified–> |
150 |
9.5 (-1.5m CD) |
20,000 |
140 |
Finger Pier |
1x Gottwald HMK 260B |
30 |
Project Cargo |
Heavy lift pad (100t point load) |
| Jiangxin Bulk Terminal Complex |
BULK-1 |
320 |
14.2 (-2.5m CD) <–3rd Verification–> |
150,000 |
310 |
Dolphin (Concrete) |
2x Siwertell ST 790-D (750t/h) + 3x Stackers |
80 |
Iron ore/Coal |
3,000t/h conveyor (DIN 22101), automated sampler |
| BULK-2 |
280 |
12.8 (-2.3m CD) |
100,000 |
290 |
Pier (Gravity wall) |
1x Grab crane (ZPMC 50t) + Dust Screen |
50 |
Grain/Fertilizer |
ATEX Zone 22 certified, max moisture 14% |
| BULK-3 |
150 |
9.5 (-1.8m CD) |
30,000 |
140 |
Dolphin (Steel) |
Pneumatic unloader (FLSmidth 400t/h) |
30 |
Cement/Clinker |
Negative pressure system, max temperature 80°C |
| BULK-4 <–New/Verified–> |
200 |
11.0 (-2.0m CD) |
40,000 |
190 |
Wharf |
2x Portal scraper (600t/h) |
35 |
Aggregates |
Direct truck loading bays (6 lanes) |
| Jiangyin Chemical Wharf |
CHEM-1 |
180 |
10.5 (-1.9m CD) |
30,000 |
175 |
Dolphin (Concrete) |
1x Loading arm (SVG DN200) + VOC Plant |
30 |
Class I Chemicals |
CDI-T certified, max vapor pressure 0.45barA |
| CHEM-2 |
120 |
8.0 (-1.5m CD) |
15,000 |
110 |
Dolphin (Steel) |
2x SVT DN150 arms |
20 |
Biodiesel |
Heated lines (60°C max), dedicated pipeline to storage |
| CHEM-3 <–New/Verified–> |
160 |
9.0 (-1.6m CD) |
25,000 |
150 |
Pier |
3x Loading arms (DN150/100/100) |
25 |
Vegetable Oils |
Food-grade certification (FSSC 22000) |
| Yangtze Lighterage Zone |
LGT-1 to LGT-8 |
1,200 (total) |
8.0-9.5 (-1.5m CD) |
10,000 |
150 |
Mooring Buoys |
4x Floating cranes (25t SWL) |
25 |
Transshipment |
Anchorage No.5 (31°57.3′N 120°14.2′E), bunkering permitted with MSA approval |
| LGT-9 <–New/Verified–> |
120 |
7.5 (-1.3m CD) |
5,000 |
100 |
Floating Pontoon |
2x Mobile cranes (16t) |
16 |
Coastal Barges |
Restricted to vessels <12m beam |
| Jiangyin RoPax Terminal |
RPX-1 |
150 |
7.5 (-1.4m CD) |
15,000 |
140 |
Pier (Ro-Ro) |
Vehicle ramp (12m width, 8% gradient) |
N/A |
Passengers/Vehicles |
CIQ facilities, max 500 pax/hour, DG vehicles prohibited |
| Xigang General Cargo Terminal |
GC-1 |
220 |
9.0 (-1.7m CD) |
40,000 |
210 |
Wharf |
3x Gantry cranes (ZPMC 16t) + 2x 25t forklifts |
16 |
Steel/Project |
Heavy lift zone (100t max), 24h ops, magnetic lift available |
| Offshore VLCC Moorings |
MB-1 to MB-6 |
N/A |
15.0-16.5 (-3.0m CD) |
200,000 |
330 |
CALM Buoys |
N/A |
100 (mooring) |
Crude Transfer |
MSA MO-2024-56, max 3 vessels/buoy, emergency release per OCIMF |