25.9 C
Singapore
Tuesday, April 29, 2025
spot_img

Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Lianyungang Port

Must read

Terminal Name Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes SWL (tons) Main Cargo Special Notes
Lianyungang Container Terminal CT1 350 -14.5 100,000 330 Quay 6 STS (ZPMC ZP1515) 65 Containers Automated gates since 2023
CT2 360 -15.0 120,000 350 Quay 7 STS (ZPMC ZP1618) 65 Containers Reefer plugs: 1,200
CT3 380 -16.5 150,000 366 Quay 8 STS (ZPMC ZP1719) 70 Containers ULCS dedicated
CT4 400 -17.0 180,000 400 Quay 8 STS (ZPMC ZP2025) + 2 RMG 75 Containers 24,000 TEU vessels
CT5 300 -12.5 50,000 280 Quay 4 STS (Noell N2100) 50 Feeders Coastal service only
CT6 320 -13.5 80,000 310 Quay 5 STS (ZPMC ZP1412) 60 Containers New in 2024
Eastern Bulk Terminal EB1 250 -13.0 60,000 240 Dolphin 3 grabs (Hanjin HJ450) 25 Coal/Ore 5,000 tph conveyor
EB2 280 -14.0 80,000 260 Pier 4 grabs (ZPMC G80) 30 Alumina Silo capacity: 400,000t
EB3 200 -11.5 30,000 190 Wharf 2 mobiles (Liebherr LHM500) 16 General bulk Dust suppression system
EB4 150 -9.0 20,000 140 Pier 1 mobile (Sennebogen 640E) 12 Agricultural Covered storage
LNG Terminal LNG1 340 -15.5 216,000 315 Jetty 2 arms (Svanehøj) N/A LNG Q-Max compatible
LNG2 300 -14.0 120,000 290 Jetty 2 arms (FMC) N/A LPG/Chemicals Class I Hazmat
CR1 380 -18.0 300,000 360 Dolphin 4 arms (Emco Wheaton) N/A Crude oil VLCC capable
General Cargo Terminal GC1 220 -11.0 45,000 210 Wharf 2 gantry (Konecranes) 40 Project cargo 100t lift capacity
GC2 180 -10.5 30,000 170 Pier 1 mobile (Gottwald HMK260) 25 Breakbulk Ro-Ro ramp available
GC3 150 -9.5 20,000 140 Wharf None N/A Timber Fumigation zone
GC4 200 -12.0 50,000 190 Quay 3 gantry (ZPMC) 35 Fertilizer Covered storage
GC5 160 -8.5 15,000 150 Wharf None N/A Steel coils Magnetic cranes only
Grain Terminal GT1 300 -14.0 80,000 280 Quay 3 unloaders (Bühler) N/A Grain 500,000t silo capacity
Multi-purpose Terminal MP1 220 -12.5 60,000 210 Pier 2 gantry + 1 mobile 50 Project cargo 100-ton lift capacity
MP2 180 -11.0 40,000 170 Wharf 2 mobiles (Liebherr) 30 General DG storage available
MP3 200 -12.0 50,000 190 Wharf 1 floating crane 120 Heavy lift Special permission

OFFSHORE FACILITIES

Crude Oil Dolphins COD1-2 N/A -25.0 500,000 400 Tandem mooring Loading platform N/A Crude oil
Mooring Buoys MB1-3 N/A -25.0 500,000 400 CALM system N/A N/A Crude oil 3x buoys, SPM system
Lighterage Area LA1 500 -8.0 10,000 150 Open water N/A N/A Transshipment Barge operations only
Shipyard Wharves SY1 280 -9.5 30,000 270 Repair quay 2 gantries 25 Ship repair Drydock access
SY2 320 -10.5 50,000 310 Repair quay 3 gantries 35 Shipbuilding Fabrication yard

 

Navigation Safety Notes:

  • Tidal range: 3.5m (max) – all depths at Chart Datum
  • Channel dimensions:
    • Main channel: 350m wide × -17.5m depth
    • North channel: 200m wide × -14.5m depth
  • Restricted visibility procedures apply when visibility <1nm
  • Ice conditions possible December-February – icebreaker available

Contact Information:

Service Contact Availability
VTS Center VHF CH 08/16
+86-518-8223 4119
24/7
Port Control VHF CH 12
+86-518-8238 8123
24/7
Pilot Station VHF CH 06
+86-518-8223 4185
24/7 (3h notice)

Important Addenda:

  • New Western Terminal Phase 1 (WT1-2) under construction (ETA 2026)
  • Seasonal sedimentation observed in Eastern Channel – regular dredging
  • Bunkering services available at GC2, MP2 berths (24h notice)
  • All container berths equipped with cold ironing capability
  • Port security level currently: LEVEL 1 (normal)

 

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article