1. Port Dolphins

Dolphin Name Position Material Dimensions Function Lighting Note
Entrance Channel Dolphin N1 34°54’05″N 128°03’40″E Reinforced concrete 6m diameter Navigation reference White flashing (Fl(3) 10s) Fitted with radar reflector
West Breakwater Dolphin W1 34°54’15″N 128°03’55″E Steel pile cluster 8m x 8m Mooring assistance Fixed red 4-pile configuration, fendered
East Breakwater Dolphin E1 34°54’20″N 128°04’00″E Steel pile cluster 10m x 10m Mooring assistance Fixed green 6-pile configuration
Oil Terminal Dolphin OT1 34°54’30″N 128°03’50″E Concrete caisson 12m x 12m Product transfer Yellow flashing 2 x loading arms (8″ diameter)
Inner Harbor Dolphin IH1 34°54’22″N 128°03’58″E Concrete-filled steel 5m diameter Emergency mooring None Bollard capacity 50t

2. Mooring Buoys

Buoy ID Position Type Max Vessel Size Mooring System Lighting Note
SCP-B01 34°54’12″N 128°03’45″E Single-point 5,000 DWT 50-ton chain + 200m nylon Yellow (Fl Y 5s) Class-approved to OCIMF standards
SCP-B02 34°54’18″N 128°03’50″E Multi-point 10,000 DWT 80-ton chain + 4 x 100m wires Red (Fl R 5s) Requires 2 tugs for approach
SCP-B03 34°54’25″N 128°03’58″E Emergency 3,000 DWT 30-ton chain + 150m nylon White (Fl W 10s) Daylight use only
SCP-B04 34°54’30″N 128°04’05″E Lighterage 1,500 DWT 20-ton chain + 100m polypropylene Yellow (Q Y) Restricted to barges

3. Piers, Berths and Wharves

Terminal Berth Length (m) Depth (m CD) DWT Max LoA (m) Type Cranes SWL (t) Bollards Cargo Note
General Cargo Terminal Berth 1 150 8.5 15,000 130 Quay wall 2 x Liebherr LHM 280 25 10 x 50t General, steel Deck load 3t/m²
Berth 2 180 9.0 20,000 150 Quay wall 1 x Noell 40t gantry 40 12 x 50t Project cargo Ro-Ro ramp available
Fisheries Terminal Wharf A 120 6.0 3,000 90 Open wharf None 6 x 15t Fishing vessels Ice plant capacity 20t/day
Wharf B 80 5.0 1,500 60 Open wharf None 4 x 10t Small boats No night operations
Oil Terminal Berth OT1 100 10.0 30,000 120 Dolphin-type 2 x loading arms 6 x 75t Fuel oil, diesel Hazard Zone 1
Container Terminal Berth CT1 200 12.0 35,000 180 Quay wall 2 x STS cranes 50 15 x 50t Containers Reefer plugs available

4. Lighterage Facilities

Facility Type Location Max Barge Equipment Wave Limit Note
Inner Harbor Platform Floating pontoon 34°54’25″N 128°03’50″E 500 DWT 2 x 10t cranes 0.5m Tidal compensation system
East Basin Area Open water Anchorage E3 1,000 DWT None (STS) 1.0m Requires 2 tugs
Coastal Lighterage Point Beach ramp 34°54’40″N 128°04’10″E 200 DWT Forklifts 0.3m Daylight only

5. Supporting Infrastructure

Facility Specifications Operational Parameters Note
Main Breakwater Length: 850m, Height: +8.5m CD Design wave: Hsig 5.0m Concrete tetrapod armor (10-15t units)
Navigation Channel Width: 150m, Depth: -11.0m CD Max current: 2.5 knots Dredged annually (maintained depth)
Turning Basin Diameter: 300m, Depth: -10.0m CD Tug requirement: >20,000 DWT Soft clay bottom

 

Critical Safety Information

  • Maximum permissible squat allowance: 0.7m (main channel)
  • Tidal range: Mean 2.1m (springs 3.0m, neaps 1.2m)
  • Pilotage: Compulsory for vessels >5,000 GT (KCG Regulation 2021-45)
  • Mooring line requirements: Minimum 8 lines for vessels >10,000 DWT
  • Emergency contact: VHF Ch 16/12 (Port Control)

 