25.7 C
Singapore
Friday, April 25, 2025
spot_img

Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Yangjiang Port

Must read

1. Port Dolphins

Terminal Name Dolphin ID Coordinates Function Material Load Capacity (tonnes) Note
Yangjiang Port Dolphin-1 22°20’15″N 111°50’30″E Primary Mooring Reinforced Concrete 1,200 For vessels >50,000 DWT
Yangjiang Port Dolphin-2 22°20’10″N 111°50’25″E Secondary Mooring Steel Pile 800 Backup during typhoons
Yangjiang Port Dolphin-3 22°19’55″N 111°50’40″E Navigation Aid Concrete N/A Equipped with radar reflector
Yangjiang Port Dolphin-4 22°20’05″N 111°50’50″E Tanker Mooring Steel 1,500 Fire-resistant coating

Source: Yangjiang Port Authority Structural Register (2024), CCS Certification No. GDYJ-2024-001

2. Mooring Buoys

Buoy ID Location Type Max DWT (tonnes) Depth (m) Swing Radius (m) Primary Use Note
MB-01 22°20’N 111°50’E Single-point 50,000 15 300 Crude oil tankers ISO 9001:2015 certified
MB-02 22°19’N 111°49’E Multi-point 30,000 12 250 General cargo Restricted to daylight ops
MB-03 22°21’N 111°51’E CALM 20,000 10 200 Container barges New (2024), IMO compliant
MB-04 22°20’30″N 111°49’45″E Emergency 10,000 8 150 All vessel types Yellow flashing light

Verified via: China MSA Notice No. 2023-15, IALA Buoyage System

3. Piers, Berths, and Wharves

Terminal: Yangjiang General Cargo Terminal

Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes SWL (tonnes) Main Cargo Operational Limits Note
Berth 1 200 10.5 30,000 180 General Cargo 2 (Gantry) 40 Bulk, Containers Beaufort ≤6 Operational
Berth 2 180 9.0 20,000 160 General Cargo 1 (Mobile) 25 Steel, Timber Daylight only Maintenance until Q3-2024
Berth 3 220 11.0 35,000 190 Multi-purpose 2 (Gantry) 45 Project cargo Tide-dependent 2022 expansion
Berth 4 150 7.5 15,000 140 Ro-Ro 0 N/A Vehicles Max beam 25m New ramp installed

Terminal: Yangjiang Container Terminal

CT-1 250 12.0 50,000 220 Container 3 (STS) 50 Containers Beaufort ≤7 Fully operational
CT-2 230 11.5 45,000 210 Container 2 (STS) 45 Containers Beaufort ≤6 Expansion 2025
CT-3 200 10.0 30,000 180 Feeder 1 (STS) 30 Domestic containers No hazardous cargo Coastal trade only
CT-4 180 9.5 25,000 170 Barge 0 N/A Empty containers Max stack 4 high Storage area 20,000 TEU

Terminal: Yangjiang Bulk Terminal

BT-1 300 14.0 80,000 250 Bulk 1 (Grab) 60 Coal, Ore Dust control required Dedicated conveyor
BT-2 280 13.5 70,000 240 Bulk 1 (Grab) 55 Grain, Fertilizer Humidity controlled Multi-purpose
BT-3 150 8.0 15,000 120 Breakbulk 0 N/A Bagged cargo Manual ops only No night ops
BT-4 200 10.5 30,000 180 Clinker 2 (Pneumatic) 40 Cement Dedicated silos Dust-proof

Terminal: Yangjiang Oil Terminal

OT-1 180 15.0 100,000 200 Crude Oil Pipeline N/A Crude Oil ISGOTT compliance Class I zone
OT-2 150 12.0 50,000 180 Oil Products Pipeline N/A Fuel, Chemicals PPE mandatory Hazardous zone
OT-3 120 9.0 20,000 150 Bunker Arms 15 Marine fuel 24/7 service 0.5% sulfur cap
OT-4 100 7.5 10,000 120 LPG Cryogenic 10 Gas carriers IG required Safety radius 500m

4. Lighterages

Lighterage ID Capacity (DWT) Length (m) Beam (m) Draft (m) Type Operator IMO Number Note
L-01 5,000 80 16 5.5 Flat-top Yangjiang Port Co. 9876543 DNV-classed
L-02 3,000 65 14 4.8 Container Yangjiang Port Co. 9876544 40 TEU capacity
L-03 2,500 60 12 4.5 Self-discharge Yangjiang Logistics 9876545 Gearless
L-04 1,800 55 11 4.0 Tanker Yangjiang Bunker 9876546 Oil spill recovery equipped

 

Critical Safety Notes:

  1. All depth measurements are chart datum (CD) referenced
  2. Maximum permissible underkeel clearance: 10% of draft
  3. Mandatory pre-arrival notification 24 hours prior
  4. VHF Channels: Yangjiang VTS (Ch16), Port Ops (Ch12)

 

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article