Adani Ports and Logistics Mundra have advised that revised charges will apply for LNG vessels arriving at Mundra on or after 0001 hours on 1 July 2022.
Port Dues
– Existing Tariff Rate: USD 0.0516 per GT
– Revised Tariff New Rate: USD 0.06192 per GT
Ports dues are payable per vessel call and valid for a maximum of 15 days.
Pilotage Charges
– Existing Tariff Rate: USD 0.2087 per GT per day (first line ashore to last line cast off)
– Revised Tariff New Rate: USD 0.2087 per GT per day (first line ashore to last line cast off)
Anchorage Charges
– Existing Tariff Rate: USD 0.0341 per GT per day
– Revised Tariff New Rate: USD 0.0341 per GT per day
Shore gangway
– Existing Tariff Rate: USD 100 per calendar day
– Revised Tariff New Rate: USD 120 per calendar day
Port Environment Protection Safety charges
Up to 10000 GT
– Revised Tariff New Rate: USD 125 per calendar day
10001 to 30000 GT
– Revised Tariff New Rate: USD 190 per calendar day
More than 30001 GT
– Revised Tariff New Rate: USD 250 per calendar day
Mooring Charges
– Revised Tariff New Rate: USD 0.034720 per GT
Fuel Surcharge on Pilotage
– Revised Tariff New Rate: USD 0.126010 per GT (see note)
Note: Fortnightly revised tariff rate for Fuel Surcharge on pilotage will only be available on our website under “Trade Notices” section, which can be assessed through