- Vessel-Related Charges
- Tonnage Dues:
- International commercial: $0.25/GT (min $500)
- Domestic vessels: $0.18/GT (min $300)
- Passenger ships: $0.12/GT (min $200)
- Fishing vessels: $0.08/GT (min $100)
- Port Dues:
- Basic: $0.15/GT (cap 50,000 GT)
- Environmental surcharge: $0.03/GT
- Port development fee: $0.02/GT
- Winter navigation fee (Dec-Mar): +15%
- Pilotage Fees:
- Entrance/Exit: $0.08/GT (min $800, max $8,000)
- Shifting: $0.05/GT (min $500, max $5,000)
- Berthing: $0.03/GT (min $300)
- Dangerous cargo: +20%
- Night (2200-0600): +30%
- Holiday: +50%
- Tugboat Charges:
- 3,200HP: $1,200/hour (min 2 hours)
- 4,800HP: $1,800/hour (min 2 hours)
- 6,400HP: $2,400/hour (min 2 hours)
- Emergency standby: $500/hour
- Icebreaking tugs: +40%
- Berth Fees:
- General cargo: $0.08/GT/day
- Container: $0.12/TEU/day
- Bulk carrier: $0.10/GT/day
- Oil terminal: $0.15/GT/day
- Free time: 72 hours
- Overtime: +100% after free period
- Tonnage Dues:
- Mooring & Anchorage Services
- Mooring/Unmooring:
- Standard: $150/line
- VLCC/ULCC: $200/line
- Extra-long lines: +20%
- Emergency remooring: $300/line
- Anchorage Fees:
- Outer anchorage: $0.05/GT/day
- Quarantine anchorage: $0.07/GT/day
- Minimum charge: $200/day
- Mooring/Unmooring:
- Safety & Inspection Services
- Port Security:
- ISPS compliance check: $400
- Security guard: $30/hour (min 8 hours)
- Patrol boat escort: $200/hour
- Fire Services:
- Standby: $400/hour
- Actual deployment: $1,200/hour
- Foam application: $500/ton
- Ship Inspections:
- Delivery/redelivery: $1,200
- Condition survey: $800
- Bunker survey: $500
- On-hire inspection: $900
- Port Security:
- Cargo Handling Charges
- Loading/Unloading:
- General cargo: $5-8/ton
- Containers: $25/TEU
- Bulk grain: $4/ton
- Project cargo: $15-50/ton
- Special Handling:
- Heavy lift (>100t): $500/unit + $10/ton
- Dangerous goods: +30%
- Reefer monitoring: $5/TEU/day
- Loading/Unloading:
- Storage & Warehouse
- Yard Storage:
- Days 1-5: Free
- Days 6-10: $0.20/ton/day
- After 10 days: $0.50/ton/day
- Hazardous materials: +100%
- Warehousing:
- General cargo: $1.50/ton/day
- Valuable cargo: $3.00/ton/day
- Minimum charge: $50/day
- Yard Storage:
- Utility Services
- Fresh Water:
- Standard: $5/ton (min 50 tons)
- Potable: $8/ton
- Emergency supply: +50%
- Bunkering:
- Service fee: $0.50/ton
- Mass flow meter verification: $200
- Sampling analysis: $150
- Power Supply:
- Shore power: $0.15/kWh
- Connection fee: $500
- High-voltage: +20%
- Fresh Water:
- Waste Management
- Garbage Disposal:
- General: $100/ton
- Plastic: $150/ton
- Food: $80/ton
- Medical: $300/ton
- Sludge Removal:
- Standard: $80/ton (min 5 tons)
- Hazardous: +100%
- After hours: +50%
- Garbage Disposal:
- Administrative Fees
- Customs Clearance:
- Basic: $200
- Express: +50%
- Holiday: +200%
- Quarantine:
- Health inspection: $300
- Crew inspection: $20/person
- Ship sanitation: $150
- Customs Clearance:
- Passenger Services
- Terminal Fees:
- Embarkation: $5/person
- Disembarkation: $5/person
- Transit: $3/person
- Facilities:
- Terminal usage: $200/hour
- Cleaning deposit: $1,000
- Terminal Fees:
- Cost Optimization Strategies
- Operational Planning:
- Schedule bunkering during cargo ops
- Combine tug/pilot services
- Pre-clear customs documentation
- Waste Reduction:
- Separate waste streams
- Minimize hazardous waste
- Schedule sludge removal with port call
- Documentation:
- Submit documents 72hrs in advance
- Verify all certificates pre-arrival
- Use electronic clearance systems
- Operational Planning:
Important Notes
- All fees subject to 6% VAT
- Payment methods: Bank transfer/Alipay/WeChat Pay
- Disputes must be filed within 7 days
- Eco-friendly discounts: ESI >50 (10%)
- Regular caller program: >12 calls/year (5%)
- Currency: USD (1USD=7.2CNY fixed rate)
Safety Reminders
- Maintain 24hr radio watch on VHF Ch 12/16
- Conduct pre-departure safety checks
- Verify all mooring equipment certifications
- Report hazards to Port Control immediately




