- PILOTAGE & NAVIGATION
- Mandatory pilotage thresholds:
Vessel Type Requirement Exception All foreign vessels >3,000 GT Warships Domestic vessels >10,000 GT Coastguard - Pilot boarding details:
- Primary point: 30°38’00″N 121°12’00″E (±50m accuracy)
- Alternative point: 30°37’45″N 121°11’20″E (helicopter transfer)
- Night restrictions: Suspended when visibility <1nm or wind >7 Beaufort
- Navigation warnings:
- Strong cross-current (3.5kn max) at harbor entrance during spring tides
- Prohibited areas:
Position Restriction Penalty 30°33’42″N 121°08’15″E No anchoring (submarine cable) $5,000 fine 30°35’10″N 121°09’30″E Speed <5kn (dolphin zone) $3,000 fine
- Mandatory pilotage thresholds:
- PORT ENTRY PROTOCOLS
- Document submission:
Document Format Deadline System IMO Summary XML Schema 3.2 72hr pre-ETA China MSW Crew List FAL Form 5 24hr pre-ETA PORTROUTE - Special quarantine measures:
- From Africa: Original mosquito eradication certificate issued within 7 days
- From Japan: Radiation screening with <0.25μSv/h limit
- Plague areas: 6hr UV sterilization at quarantine anchorage
- New AIS requirements:
- Continuous transmission within 12nm of port
- Silent mode prohibited except under MSA authorization
- Document submission:
- BERTHING & MOORING
- Mooring configuration:
DWT Head Lines Breast Lines Spring Lines <50,000 3 (min 32mm) 2 2 50,000-100,000 4 (min 38mm) 3 3 - Tension limits:
- Container berths:
Berth Fore Spring Aft Breast 1-3 25t 18t 4-6 30t 22t - Winch brake capacity must exceed 60% MBL at all times
- Container berths:
- Mooring configuration:
- CARGO OPERATIONS
- Bulk terminals:
Berth Cargo Rate Restrictions 7-9 Coal 8,000MT/hr Dust suppression when wind >10m/s 10-12 Iron Ore 6,500MT/hr Moisture <8% TML - Container terminals:
- Reefer plugs: 120 slots @440V/60Hz (phase rotation protection mandatory)
- Gantry crane SWL: 65 tons under spreader (certificate must be current)
- VGM verification: 5% random checks, must be submitted 24hr pre-loading
- Dangerous goods:
- New DG berth (No.15) specs:
Firewater capacity 5,000m³/hr Vapor detection LEL monitoring @30m intervals - Class 1 explosives: 15-day pre-approval required
- New DG berth (No.15) specs:
- Bulk terminals:
- ENVIRONMENTAL COMPLIANCE
- Emission controls:
Parameter Limit Monitoring SOx 0.1% (ECA) Continuous EMS NOx 3.4g/kWh (Tier III) Data logger - Ballast water: Zero discharge within 12nm (USCG type-approved systems only)
- Emission controls:
- LEGAL DOCUMENTATION
- Updated requirements:
Document Validity Remarks Anti-bribery statement Notarized Board resolution required Crew contracts Original + copy Must show social security payments - Clearance processing: Minimum 4hr before ETD
- Updated requirements:
CRITICAL CONTACTS
- Port Control: +86 573 8523 1111 (Channel 16/12)
- MSA Inspection: +86 573 8521 4885 (24hr)