Terminal Name Facility Type Berth/Dolphin Name Length (m) Depth (m) DWT Capacity Max LoA (m) Structure Type Shore Cranes SWL (ton) Main Cargo Safety Certification Operational Notes
Zhapu Container Terminal Berth CT-1 300 13.5 50,000 280 Quay wall 4 STS (ZPMC) 65 Containers ISO 45001:2018 Hazard Zone 1-100m
Berth CT-2 280 12.8 (+0.5 dredge tolerance) 35,000 260 Quay wall 3 STS (Noell) 50 Containers/RORO GB/T 16560-2016 REEFER capacity 400 plugs
Berth CT-3 250 11.5 25,000 240 Quay wall 2 STS (Konecranes) 45 Containers SOLAS Ch.II-1 Night ops permitted
Jiaxing General Cargo Terminal Berth GC-1 200 11.2 30,000 190 Open wharf 2 Gantry (SWKK) 30 Steel/Project GL certified Magnet cranes available
Berth GC-2 180 10.5 20,000 170 Covered wharf 1 Gantry (ZPMC) 25 Timber FSC certified No open flames
Berth GC-3 150 9.8 15,000 140 Wharf 1 Mobile (Liebherr) 15 Breakbulk DG Class 4.1 Chem spill kit onsite
Berth GC-4 120 8.5 10,000 110 Wharf None 10 Aggregates MSDS required Dust control mandatory
Dolphin GC-D1 N/A 9.0 5,000 90 Breasting dolphin None 5 Service craft Lloyd’s Register Fuel transfer only
Zhapu Chemical Terminal Dolphin CH-1 220 12.0 40,000 200 Catenary mooring None N/A Class I DG IBC Code certified Vapor recovery required
Dolphin CH-2 180 10.8 25,000 160 Multi-point mooring None N/A Edible Oil HACCP certified Temp control ±2°C
Pier CH-P1 150 9.5 15,000 140 T-shaped pier 2 Arm 15 Packaged chem IMDG compliant Explosion-proof lighting
Jiaxing Coal Terminal Pier CL-1 280 14.0 (+0.3/-0.0) 70,000 270 Conveyor pier 2 Grab (Hitachi) 40 Coal ATEX Zone 22 Water spray system
Zhapu Bulk Terminal Wharf BK-1 240 13.2 50,000 230 Gravity wharf 1 Grab (Takraf) 35 Iron Ore ISO 4706:2015 3000t/hr capacity
Wharf BK-2 210 11.5 35,000 200 Wharf 1 Grab (FLSmidth) 30 Grain IPPC certified Pheromone traps
Dolphin BK-D1 N/A 10.0 20,000 180 Mooring dolphin None N/A Waiting OCIMF MEG4 Max 12hr stay
Outer Anchorage Mooring Buoy MB-1 N/A 16.0 100,000 300 Single-point None N/A All types ABS certified Emergency release
Outer Anchorage Mooring Buoy MB-2 N/A 14.5 50,000 250 Multi-leg None N/A Non-DG DNV Type Approval 6 lines minimum
Inner Anchorage Mooring Buoy MB-3 N/A 12.0 30,000 200 Conventional None N/A Bunkering OCIMF compliant Daylight ops only
Zhapu Lighter Basin Dolphin LT-1 80 5.5 3,000 75 Breasting dolphin None 10 Transshipment SOLAS Ch.VI Max draft 5.2m
Wharf LT-W1 150 6.0 5,000 100 Marginal wharf 2 Mobile 15 Barge ops GB/T 3003-2017 Tidal restrictions
Pier LT-P1 60 4.5 1,000 50 Finger pier None 5 Service craft Local regulation No night navigation
Zhapu Ro-Ro Terminal Berth RO-1 200 10.0 25,000 190 Linkspan 2 MHC 25 Vehicles ISO 10830:2019 Max 2.5m air draft

Critical Operational Parameters

  • Depth References: All depths at Chart Datum (CD) + maximum tidal variation of 3.8m (spring) per Zhapu Tide Table 2024
  • Load Limits: SWL includes dynamic factor of 1.25 per GB/T 3811-2008
  • Mooring Arrangements: Minimum 6 lines for vessels >200m LOA (Port Regulation ZJ-2023-11)
  • Hazard Zones: Chemical berths require 500m exclusion zone during operations (MEPC.1/Circ.869)
  • Bunkering: Only at MB-3 with prior Port Control clearance (VHF Ch 12)

Safety Notices

1. Maximum Allowable Draft: Charted depth + tide – 0.8m (squat allowance for vessels >150m LOA)

2. Crane Operations: Wind limit 15m/s (Beaufort 7) for all container cranes

3. Emergency Contacts: Port Control +86 573 8553 1111 (24/7 English speaking)