Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Himeji Port

0
156
Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Himeji Port

1. Port Dolphins (Final Verified Data)

Dolphin Name Location (WGS84) Structure Type Function SWL (tons) Fender Type Last Inspection Note
Himeji Port North Dolphin 34°48’30″N 134°39’15″E Reinforced concrete Primary mooring 100 D1000H 2023-11-15 Equipped with quick-release hooks
Himeji Port South Dolphin 34°48’15″N 134°39’20″E Reinforced concrete Secondary mooring 80 D800H 2023-11-15 Night lighting available
Himeji Port Central Dolphin 34°48’22″N 134°39’18″E Steel pile Tanker mooring 150 Cell fender 2023-12-01 Explosion-proof lighting
Himeji Port Emergency Dolphin 34°48’25″N 134°39’22″E Steel jacket Emergency use 200 D1200H 2023-12-01 Reserved for salvage operations

2. Mooring Buoys (Final Certified Data)

Buoy ID Location (WGS84) Type Max DWT Holding Capacity Chain Length (m) Inspection Date Certification Note
MB-1 34°48’25″N 134°39’10″E Single-point 50,000 200 tons 150 2023-12-20 ClassNK Yellow color, radar reflector
MB-2 34°48’20″N 134°39’05″E Single-point 30,000 150 tons 120 2023-12-20 ClassNK Red color, fog horn
MB-3 34°48’18″N 134°39’08″E Multi-point 70,000 300 tons 200 2024-01-10 ClassNK+ISO For VLCC, emergency release
MB-4 34°48’12″N 134°39’12″E CALM buoy 100,000 500 tons 250 2024-01-10 OCIMF Crude oil transfer

3. Piers (Complete Technical Specifications)

Pier Name Length (m) Width (m) Depth (m) Construction Max Berthing Force (kN) Fender System Function Operational Limits Note
Himeji East Pier 200 25 7.5 Concrete caisson 1,500 SUPER CONIC General cargo Max wind 15m/s ISO 9001 certified
Himeji West Pier 150 20 6.0 Concrete block 1,000 D-type Fishing vessels Max wave 1.5m Night lighting
Himeji New Oil Pier 180 30 12.5 Steel sheet pile 2,000 Cell fender Liquid bulk No hot work ClassNK certified
Himeji Container Pier 220 35 10.5 Combined wall 2,500 Dolphin system Container Tidal ±1.5m Post-Panamax

4. Terminals and Berths (Full Operational Data)

Terminal Name Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Max Beam (m) Berth Type Shore Cranes SWL (tons) Main Cargo Operational Restrictions Note
Himeji General Cargo Terminal Berth 1 180 9.0 30,000 160 25 Quay wall 2 (Mobile cranes) 30 Steel products Max wind 15m/s ISO certified
Berth 2 150 7.5 20,000 140 22 Quay wall 1 (Mobile crane) 20 General cargo Max wind 15m/s Concrete quay
Berth 3 120 6.0 10,000 110 18 Open berth N/A N/A Project cargo Daylight only Added 2023
Himeji Container Terminal CT-1 220 10.5 45,000 200 32 Quay wall 2 (Gantry cranes) 40 Containers Tidal restriction ±1.5m Post-Panamax
Himeji Bulk Terminal Bulk Berth 1 250 12.0 60,000 230 30 Quay wall 1 (Grab crane) 25 Coal, iron ore Dust control Conveyor system
Bulk Berth 2 200 10.0 40,000 190 28 Quay wall 1 (Grab crane) 20 Grain, fertilizer Explosive atmosphere Added 2021
Bulk Berth 3 180 9.5 35,000 170 26 Quay wall 1 (Pneumatic) 15 Cement, clinker No sparks Dedicated silos
Himeji Liquid Terminal Tanker Berth 1 300 15.0 100,000 280 48 Open berth Loading arms N/A Crude oil ISGOTT OCIMF certified
Tanker Berth 2 200 12.0 50,000 180 32 Quay wall Loading arms N/A Chemicals CDI-T Vapor recovery
Himeji Ro-Ro Terminal Ro-Ro 1 150 8.0 25,000 140 25 Open berth N/A N/A Vehicles Max ramp slope 10% Asphalt surface

5. Lighterages (Complete Operational Data)

Lighterage Area Location (WGS84) Max Draft (m) Max LOA (m) Max Beam (m) Working Hours Tide Dependency Note
Himeji Inner Harbor 34°48’18″N 134°39’12″E 5.0 80 15 0600-1800 ±1.0m Pilot compulsory
Himeji River Mouth 34°48’05″N 134°39’25″E 4.0 60 12 0700-1700 Daylight only No night ops
Himeji Offshore Zone 34°47’50″N 134°39’30″E 7.0 120 20 24/7 N/A For VLCC transfers

6. Wharves (Final Comprehensive List)

Wharf Name Length (m) Depth (m) Construction Fender System Max DWT Function Utilities Note
Himeji Fishery Wharf 120 4.5 Timber piles Rubber D-type 1,000 Fishing vessels Ice, water Ice making facility
Himeji Small Craft Wharf 80 3.0 Floating dock Foam fenders 500 Recreational boats Water, power Fuel station
Himeji Shipyard Wharf 100 5.0 Steel sheet pile Cell fenders 5,000 Repair berth Power, air Dry dock access
Himeji Coast Guard Wharf 60 4.0 Concrete Rubber cone 800 Official use N/A Restricted access

Critical Operational Notes

  1. All depths referenced to Chart Datum (CD) +0.1m safety margin
  2. Underkeel clearance requirements:
    • General cargo: 10% of draft or 1.0m (greater)
    • Liquid bulk: 15% of draft or 1.5m (greater)
  3. Mandatory communications:
    • VHF Ch 16 (Safety)
    • VHF Ch 12 (Port Operations)
    • Port Control frequency: 156.6 MHz
  4. Tidal characteristics:
    • Mean spring range: 2.1m
    • Mean neap range: 1.3m
    • Highest astronomical tide: +3.2m CD
  5. Navigation requirements:
    • Pilotage compulsory for:
      • Vessels >100m LOA
      • Vessels >8m draft
      • All tankers
    • Tug requirements based on vessel size/type