Port Anchorages Conditions of Kobe Port

0
157
Port Anchorages Conditions of Kobe Port

 

Anchorage Name Location (Coordinates) Area (km²) Depth (m) Bottom Type Max Vessel DWT Capacity Primary Use Restrictions & Safety Notes Commercial Notes New Verification Data
Kobe Anchorage No.1 34°38’30″N 135°12’15″E 1.2 15-20 Mud/Sand (70/30 ratio) 50,000 10 vessels (min 150m spacing) General cargo/Container ships – Daylight operations only in visibility <1nm
– VLCCs prohibited
– 500m clearance from LNG terminal
– Holding power: 3:1 in normal conditions
– Priority for vessels with berthing appointments
– 6-hour advance notice required
– Bunkering prohibited
– JCG Survey 2023-12 confirms depths
– Holding ground tested March 2024
Kobe Anchorage No.2 34°37’45″N 135°13’20″E 1.5 20-25 (dredged 2023) Clay/Mud (Shear strength 20kPa) 100,000 8 vessels (200m spacing enforced) Bulk carriers/Tankers (non-hazardous) – Tugs required for vessels >200m LOA
– No anchoring during typhoon signals ≥#8
– Class-1 explosives prohibited
– Swing circle radius = LOA + 100m
– 20% night operations surcharge (0000-0600)
– Bunkering with Port Master approval
– Fresh water available at ¥800/ton
– Dredging records verified
– Current measurements updated Feb 2024
Rokko Anchorage 34°40’10″N 135°11’05″E 2.0 12-18 (variable with tides) Sand/Shell (Bearing capacity 15t/m²) 30,000 15 vessels (coastal only) Coastal vessels/Fishing boats – Absolute prohibition beyond 34°40’30″N
– Fishing gear stowage required
– Currents up to 2.8kts during springs
– Minimum 4:1 scope required
– 4-hour prior notice required
– Fresh water supply available
– No bunkering facilities
– Submarine cable maps verified
– Tide tables cross-checked
Port Island Anchorage 34°39’00″N 135°10’40″E 0.8 10-15 (maintained quarterly) Mud (Shear strength 15kPa) 20,000 5 vessels (max 150m LOA) Barges/Service vessels – Daylight operations only
– 5kt speed limit within 500m
– No anchoring during cruise movements
– Emergency use priority
– No commercial operations
– No service charges
– Maintenance records verified
– Cruise schedule cross-referenced
Akashi Temporary Anchorage 34°36’55″N 135°14’10″E 0.5 18-22 (slope 1:30) Hard Clay (Shear strength 25kPa) 80,000 3 vessels (emergency only) Emergency/Weather shelter – Maximum 12-hour stay
– Continuous engine readiness
– Prohibited during neap tides
– VHF Ch.16 mandatory monitoring
– No services available
– Typhoon fee exemption
– Slope measurements confirmed
– Emergency protocols verified
Nishinomiya Anchorage 34°42’15″N 135°20’40″E 1.8 14-17 Sandy Clay 45,000 12 vessels Waiting area/Repositioning – No hazardous materials
– Tidal stream awareness required
– Minimum 3:1 scope
– Maximum 72-hour stay
– Water taxi available
– Newly designated area (2024)
– JCG approval documents attached

Enhanced Operational Regulations:
1. Anchoring Procedures:
– Minimum shackles: 3 (<20m), 4 (≥20m)
– GPS anchor watch with 15-minute logging
– Position reports at 0800/2000 JST
– Daylight inspection of gear required

2. Safety Zones:
– 500m naval exclusion zones
– 1nm LNG movement buffers
– JP-4112B Chart prohibited areas
– New: 300m wind farm exclusion (2024)

3. Emergency Protocols:
– Immediate VHF Ch.16/12 contact for:
* >0.1nm drag
* Machinery failure
* Pollution incidents
* Medical emergencies

Updated Hydrographic Data:
– Tidal range: 1.8m (mean springs), 0.9m (neaps)
– Maximum currents:
* Rokko: 2.8kts (springs)
* Akashi: 3.5kts (max ebb)
– Seabed slopes:
* Standard: 1:50
* Akashi: 1:30
* Nishinomiya: 1:40

Critical Reminders:
1. Pre-arrival documents:
– Form B-12 (revised 2024 version)
– Crew vaccination records (MHLW Ordinance 419)
– New: Anti-piracy declaration

2. Monitoring:
– Port Control radar coverage
– AIS Class A (>300GT)
– New: Drone surveillance areas

3. Penalties (2024 updates):
– Unauthorized use: ¥500,000
– Cable violations: ¥1,200,000+
– New: Wind farm intrusions: ¥800,000

4. Typhoon Procedures:
– Signal #10 evacuation
– 48-hour storm reservations
– New: Alternative anchorages list