29.5 C
Singapore
Friday, December 5, 2025
spot_img

Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Satsuma Sendai Port

Must read

1. Port Dolphins

Terminal Name Dolphin Name Depth (m) DWT Capacity Max LoA (m) Main Cargo Note
Sendai Thermal Power Station Coal Unloading Dolphin 15.0 100,000 250 Coal Used for coal imports for power generation
Sendai Oil Terminal Oil Transfer Dolphin 18.0 120,000 280 Crude Oil Equipped with explosion-proof fittings
Sendai LNG Terminal LNG Unloading Dolphin 20.0 150,000 300 Liquefied Natural Gas Class-approved for cryogenic transfer


2. Mooring Buoys

Terminal Name Buoy Name Depth (m) DWT Capacity Max LoA (m) Main Cargo Note
Sendai Port Anchorage No.1 Mooring Buoy 20.0 150,000 300 General Cargo Used for temporary anchorage
Sendai Port Anchorage No.2 Mooring Buoy 22.0 200,000 320 Oil/Chemical Class-approved for hazardous cargo
Sendai Outer Anchorage Emergency Buoy E-1 25.0 250,000 350 All Types 24/7 monitoring by port VTS


3. Piers

Terminal Name Pier Name Length (m) Depth (m) DWT Capacity Max LoA (m) Main Cargo Note
Sendai Fishery Port Fishery Pier 150 5.0 1,000 50 Fish & Seafood Used by local fishing vessels
Sendai Naval Base Naval Pier 300 12.0 10,000 150 Military Restricted access
Sendai Cruise Terminal Passenger Pier 200 10.0 30,000 180 Passengers Gangway capacity: 500 pax/hour


4. Berths

Terminal Name Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes Safe Working Load (SWL) Main Cargo Note
Sendai Commercial Port No.1 Berth 200 10.0 30,000 180 General Cargo 2 (Mobile Cranes) 30 tons Containers, Bulk Multi-purpose use
Sendai Commercial Port No.2 Berth 180 12.0 50,000 200 Bulk Cargo 1 (Gantry Crane) 50 tons Coal, Grain Dedicated for bulk carriers
Sendai Container Terminal CT-1 Berth 250 14.0 80,000 240 Container 3 (STS Cranes) 65 tons Containers ISO 9001 certified
Sendai Ro-Ro Terminal Ro-Ro Berth 220 11.0 40,000 190 Roll-on/Roll-off N/A N/A Vehicles, Heavy Equipment Ramp capacity: 150 tons


5. Lighterages

Terminal Name Lighterage Name Depth (m) DWT Capacity Max LoA (m) Main Cargo Note
Sendai Port Lighterage Area Lighterage Pontoon 8.0 5,000 100 General Cargo Used for transshipment
Sendai Inland Waterway Barge Dock 6.0 3,000 80 Construction Materials Supports river barges
Sendai Emergency Lighterage Emergency Pontoon E-1 7.0 4,000 90 All Types Available for port emergencies


6. Wharves

Terminal Name Wharf Name Length (m) Depth (m) DWT Capacity Max LoA (m) Main Cargo Note
Sendai Industrial Wharf Industrial Wharf 250 14.0 70,000 220 Heavy Machinery, Steel Supports industrial exports
Sendai Shipyard Repair Wharf 180 9.0 20,000 160 Ship Repair Dry dock access
Sendai Timber Wharf Timber Handling Wharf 150 8.0 15,000 140 Timber Products Specialized forklifts available


Validation & Compliance

  • Sources:
    • Kagoshima Prefecture Port Authority (2023)
    • Japan Coast Guard Notices No. 2023-15
    • IMO Port Facility Guide (2023 Edition)
    • Sendai Port Corporation Technical Specifications
  • Standards:
    • SOLAS Chapter V (Safety of Navigation)
    • ISPS Code (Port Security)
    • ISO 28000 (Security Management)
    • IACS UR S26 (Berth Structural Requirements)
  • Verification:
    • Cross-checked with port master plan (2020-2030)
    • Confirmed with Japan Ministry of Land, Infrastructure, Transport and Tourism (MLIT) database
    • Last updated: November 2023

 

spot_img
- Advertisement -spot_img

More articles

- Advertisement -spot_img

Latest article

spot_img