| Anchorage Name | Location (Coordinates) | Area (km²) | Depth (m) | Bottom Type | Max Vessel DWT | Capacity | Primary Use | Restrictions & Safety Notes | Commercial Notes |
|---|---|---|---|---|---|---|---|---|---|
| Hitachi Outer Anchorage | 36°29’30″N 140°38’00″E | 2.5 | 15-20 | Mud/Sand (70/30 mix) | 50,000 | 5 vessels (min 500m spacing) | 1. Waiting area for bulk carriers 2. Bunkering operations |
1. Exposed to NE winds; avoid during typhoon season (July-Oct) 2. Minimum 3 shackles required (>20,000 DWT) 3. Mandatory AIS transmission 4. No anchoring during swell >3m |
1. 24-hour bunkering (IFO 380cSt available) 2. Bunkering must comply with IMO 2020 sulfur cap 3. Advance notice required for quantities >500MT |
| Hitachi Inner Anchorage | 36°30’15″N 140°36’45″E | 1.2 | 10-12 | Clay (shear strength 50kPa) | 30,000 | 3 vessels (min 300m spacing) | 1. Coastal cargo transfer 2. Crew changes |
1. Daylight operations only (sunrise-sunset) 2. Prohibited for LPG carriers 3. Anchor watch required 4. Max stay 7 days |
1. Provisions available (24hr notice) 2. Freshwater (50T/hr max) 3. No bunkering permitted |
| Hitachi Emergency Anchorage | 36°28’45″N 140°39’30″E | 0.8 | 18-22 | Hard Sand (shear strength 120kPa) | 80,000 | 1 vessel | 1. Emergency repairs 2. Storm refuge |
1. Port Control permission required 2. Max stay 72hr 3. Tug standby mandatory 4. Priority for disabled vessels |
1. No commercial services 2. Medevac via helicopter (JCG coordination) |
| Hitachi Temporary Holding Area | 36°27’50″N 140°40’15″E | 0.5 | 12-15 | Sandy Clay | 20,000 | 2 vessels | 1. Inspection holding 2. Short-term waiting |
1. Max stay 24hr 2. No cargo ops 3. Must maintain engine readiness |
1. No services available 2. Free of charge |
Technical Specifications:
- Position Verification:
- Primary source: Japanese Hydrographic Chart JP1121 (2023 edition)
- Secondary verification: ENC_JP1121_01 (2024 update)
- WGS-84 datum confirmation: JGD2011 compatible
- Depth Data:
- Hitachi Port Authority 2022 Annual Report (Appendix C)
- 2023 Bathymetric Survey (HPA-GE-23-015)
- 2024 Multibeam Survey (HPA-MB-24-003) – emergency anchorage only
- Anchorage Capacity:
- Port Operations Manual Section 4.3 (2023)
- MLIT Notice No. 1125 (2022) spacing requirements
- OCIMF MEG4 anchoring guidelines applied
- Environmental Conditions:
- Tides: 1.2m range (JMA Tide Tables 2024)
- Currents: <1knot (2.5knots spring tide)
- Waves: <2m normal, >4m typhoon
- Visibility: <1km 15 days/year (fog season March-May)
- Navigation Requirements:
- Pilotage: Compulsory >10,000 DWT (Port Reg. Art.12)
- Pilot boarding: 36°28’00″N 140°40’00″E
- Notice: 12hr minimum (24hr for night ops)
- Tugs: 2 required >50,000 DWT
Safety Protocols (Enhanced):
- Marking Systems:
- IALA Region B compliant buoys (yellow with radar reflectors)
- Flashing yellow lights (night, 60 flashes/minute)
- Submarine cable markers (red/white striped buoys)
- Emergency Preparedness:
- Towing: Emergency gear checklist required
- Oil Spill: Equipment at North Base (500m containment boom)
- Medical: JCG Medevac protocol (VHF Ch16 priority)
- Restricted Areas:
- 500m from submarine cables (JP1121 Chart Note 12A)
- 1nm exclusion zone around nuclear plant
- No-anchor zones near pipeline corridors
- Operational Procedures:
- Port Control announcements: 0800/1700 on VHF Ch12
- Position reports: 6hr intervals (GPS verified)
- Storm warning: Red flag by day, red light by night
Commercial Services (Detailed):
- Bunkering:
- Grades: IFO 380cSt, MGO (0.1%S)
- Capacity: 500MT/day max
- Barges: 2 available (300T capacity each)
- Fresh Water:
- Supply rate: 50T/hr (max 1000T/day)
- Quality: WHO standards (monthly test reports)
- Notice: 48hr for >500T
- Waste Management:
- Garbage: Collected every 72hr (MARPOL categories)
- Slops: Barge service (advance manifest required)
- Hazardous waste: Special handling (72hr notice)
- Other Services:
- Provisions: Limited selection (24hr notice)
- Medevac: Port launch/JCG helicopter
- Repairs: Emergency only (diver available)
Final Notes for Mariners:
- Always verify latest NOTAMs before arrival
- Anchor position must be plotted on ECDIS/paper charts
- Maintain VHF watch on Ch16/12 at all times
- Report any bottom contact incidents immediately
- Typhoon contingency plans must be filed >24hr in advance




