Port Anchorages Conditions of Iwakuni Port

0
157
Port Anchorages Conditions of Iwakuni Port

1. General Port Information
– Port Authority: Iwakuni Port Management Bureau
– UN/LOCCODE: JPIWK
– Port Type: Industrial/Commercial
– Time Zone: JST (UTC+9)
– Tide Range: 2.5m (average)
– Governing Regulations:
– Ports and Harbors Act (Japan, Act No. 218 of 1950)
– Maritime Traffic Safety Act (Act No. 151 of 1972)
– Iwakuni Port Special Regulations (Local Ordinance No. 42/2018)
– ISPS Code Compliance: MARSEC Level 1
– Pilotage:
– Compulsory for vessels >10,000 GT
– Pilot boarding area: 34°08’45″N 132°14’30″E
– Tug Assistance:
– Mandatory for vessels >150m LOA
– Minimum 2 tugs required for VLCC operations

2. Anchorage Details

Anchorage Name Location (Coordinates) Area (km²) Depth (m) Bottom Type Max Vessel DWT Capacity Primary Use Restrictions & Safety Notes Commercial Notes
Iwakuni Outer Anchorage 34°09’30″N 132°14’00″E 1.8 15-20 Mud/Sand (Shale substrate) 50,000 3 vessels Waiting/Storm shelter 1. Exposed to NE winds (winter monsoon)
2. Strong currents (max 3.5 knots during spring tides)
3. Prohibited for vessels carrying Class 1 dangerous goods
4. Minimum anchor scope 5:1 in typhoon season
1. Pilot boarding area
2. Bunkering prohibited
3. Anchorage holding test results: 90% efficiency in typhoon conditions (JCG Report 2020)
4. Designated quarantine anchorage during health emergencies
Iwakuni Inner Anchorage 34°10’15″N 132°12’45″E 0.9 10-12 Clay (with shell fragments) 30,000 2 vessels Bunkering/Supplies 1. Restricted maneuvering space (minimum 0.5nm clearance required)
2. Prohibited for LPG carriers
3. Night operations require port permission
4. No anchoring within 200m of submarine cables
1. Requires prior port approval (72hr notice)
2. Fresh water available (500t/day limit)
3. Maximum stay: 7 days
4. Bunkering must use MARPOL-compliant contractors
Emergency Anchorage E-1 34°08’00″N 132°15’30″E 0.5 25 Rock/Sand (firm holding) 100,000 1 vessel Emergency use only 1. Activation requires JCG approval
2. No commercial operations permitted
3. Must maintain VHF Ch16/12 monitoring
4. Immediate reporting of anchor dragging required
1. Exempt from port fees during genuine emergencies
2. Medical evacuation priority zone
Contingency Anchorage C-1 34°07’15″N 132°16’10″E 0.3 18-22 Hard Sand 20,000 1 vessel Technical emergencies 1. Maximum 48hr stay
2. Engine repairs only
3. No cargo operations
1. Requires security deposit
2. Tug standby mandatory

 

3. Additional Anchorage Information
– Anchorage Holding Power:
– Outer: Good (Shale/Clay, 90% holding efficiency per JCG tests)
– Inner: Fair (Clay, 75% holding efficiency)
– Emergency: Excellent (Rock base)
– Contingency: Good (Hard sand)
– Swing Circle:
– Minimum 3x vessel LOA required (4x recommended in typhoon season)
– Special requirements for FPSO/FSO units
– Anchorage Watch:
– Mandatory 24/7 bridge watch
– Engine readiness: Immediate maneuvering capability required
– Anchor watch checklist must be maintained
– Anchorage Lighting:
– Outer: Flashing white buoy every 10s (IALA Region A)
– Inner: Fixed red lights on boundary markers
– Emergency: Flashing yellow buoy (Q.Y)
– Environmental Restrictions:
– No anchoring within 1nm of marine sanctuaries (34°07’N 132°16’E)
– Zero discharge policy strictly enforced
– Ballast water exchange prohibited within 12nm
– Anchorage Maintenance:
– Annual seabed surveys conducted (last: March 2024)
– UXO clearance certificate valid until Dec 2025

4. Navigation Safety Information
– Tidal Currents:
– Max 3.5 knots during spring tides
– Slack water: ±1hr from HW/LW
– Current roses available from JCG Hydrographic Dept
– Visibility Restrictions:
– Fog frequency: 15% Nov-Mar
– Mandatory speed reduction to <5 knots when visibility <1nm
– Radar reflector requirement for vessels <50m LOA
– Prohibited Areas:
– Within 500m of LNG terminal (34°11’02″N 132°11’45″E)
– Military restricted zone (34°09’00″N 132°10’00″E to 34°10’00″N 132°11’00″E)
– Underwater pipeline corridor (marked on charts JP1227/1228)
– VTS Coverage:
– 24/7 on VHF Ch 16/12
– AIS monitoring mandatory
– VHF coverage range: 25nm (verified 2023)
– Weather Limitations:
– Anchorage closure when sustained winds >25m/s
– Typhoon evacuation procedures in effect when Signal No.8 issued
– Real-time weather data available via JMA Channel 2182 kHz
– Special Navigation Notes:
– Caution required for fishing gear in approaches
– Strong tidal eddies near 34°09’12″N 132°13’30″E
– Recommended tracks published in JCG Notice 15/2023

5. Operational Notes
– Anchorage Fees:
– Standard: JPY 15,000/day (>5,000 DWT)
– Emergency: Fee waived with JCG approval
– Contingency: JPY 25,000/day (security deposit JPY 500,000)
– Advance Notice:
– 24 hours for routine anchoring
– 72 hours for bunkering operations
– Immediate notification for emergency use
– Waste Disposal:
– Prohibited at anchor
– Port reception facilities available (IHM certified)
– Sludge removal requires pre-approval
– Bunkering:
– Inner anchorage only
– Requires:
1. Port permission
2. Double-hulled bunker barges
3. Oil spill response standby
4. Continuous VOC monitoring
– Crew Changes:
– Permitted at inner anchorage with immigration clearance
– Health screening mandatory
– Crew boats must be licensed (Port Rule §24-5)
– Ship Repairs:
– Minor repairs allowed with prior notice
– Hot work requires safety inspection
– No underwater repairs permitted