24.5 C
Singapore
Friday, December 5, 2025
spot_img

Port Disbursement Guides of Hong Kong Port

Must read

Comprehensive Hong Kong Port Disbursement Guide & Cost Optimization Strategies (2024)

1. Mandatory Port Charges
Charge Type Rate (USD) Calculation Basis Regulatory Reference Payment Method Exemptions
Port Dues 0.28/GT (first 10,000 GT)
0.14/GT (excess)
Gross Tonnage Shipping & Port Control Reg. 15A Pre-payment required Warships, SAR vessels
Light Dues 0.07/NRT per call Net Registered Tonnage Merchant Shipping Ordinance 281 Included in agent’s disbursement Vessels <100 GT
Channel Maintenance 0.12/GT (max $12,000) Gross Tonnage Port Works Ordinance 107 Monthly invoice Non-commercial vessels
VTS Surcharge $150 (L<50m)
$500 (50-200m)
$800 (>200m)
Vessel length & type MD Circular 12/2023 E-payment within 7 days Government vessels
Anchorage Fee $0.10/GT/day Gross Tonnage Port Control Ordinance 313 Post-use settlement First 24h free
Dangerous Cargo Fee $250-1,500 IMDG Class Dangerous Goods Ordinance 295 With application Non-hazardous materials
2. Variable Service Charges
  • Pilotage Fees:
    • Standard rate: $8.50/GT (min $3,200)
    • Night/Overtime surcharge: +35% (2200-0600)
    • Weekend/Public Holiday: +25%
    • Special vessel premium: +50% for VLCCs, +30% for LOA>300m
    • Waiting time: $250/hour after first 30 mins
    • Cancellation fee: 50% if <12h notice
  • Towage Services:
    • Harbor tugs: $1,200/hour (min 2 hours)
    • Ocean-going tugs: $2,800/hour
    • Standby charge: 50% of hourly rate
    • Special equipment: +$400/hour (firefighting, etc.)
    • Emergency response: Base rate x 2
    • Bollard pull >80t: +20% premium
  • Mooring/Unmooring:
    • Standard gang: $800/operation
    • Night surcharge: +40% (2000-0800)
    • Emergency operations: +100%
    • Additional lines: $50/line
    • Shifting between berths: $1,500 minimum
  • Line Handling:
    • Standard: $300/set (4 lines)
    • Heavy weather: $450/set
    • Storage fee: $50/day if not returned
3. Terminal Handling Charges
Terminal Berth Hire (USD/hour) Crane Rate (USD/move) Wharfage (USD/TEU) After-hours Surcharge Storage Fees (USD/TEU/day)
HIT (Terminal 4) 320 85 12.50 +25% (2000-0700) Day 1-3: Free
Day 4-7: 5.00
>7 days: 8.00
COSCO-HIT (Terminal 8) 350 82 11.80 +30% weekends Day 1-2: Free
Day 3-5: 4.50
>5 days: 7.50
Modern Terminals (Terminal 9) 380 90 13.20 +20% public holidays Day 1: Free
Day 2-4: 6.00
>4 days: 9.00
Asia Container Terminals 400 88 12.00 +25% all off-hours Day 1-3: Free
Day 4-6: 5.50
>6 days: 10.00
4. Essential Disbursements
  • Bunkering Costs (IFO 380cSt):
    • Current spot price: $580/MT (March 2024)
    • Delivery charge: $12/MT (min 500MT)
    • Mass flow meter fee: $150/operation
    • Barge standby: $400/hour
    • Emergency delivery: +30% surcharge
    • Lubricants: $3.50-8.00/liter depending on grade
  • Fresh Water Supply:
    • Potable water: $3.20/ton
    • Technical water: $2.80/ton
    • Minimum charge: 50 tons
    • Hose rental: $120/set
    • Emergency supply: +50% surcharge
    • Water testing fee: $85/sample
  • Waste Disposal:
    • Sludge: $85/ton (min 2 tons)
    • Garbage: $120/ton (segregated), $150/ton (mixed)
    • Chemical waste: $250/ton
    • Reception facility fee: $350/call
    • Plastic waste: $180/ton (special handling)
    • Medical waste: $320/ton
  • Provisions & Stores:
    • Bonded stores delivery: $250 minimum
    • Customs clearance: $120/declaration
    • Fresh provisions handling: $85/pallet
    • Emergency medical supplies: +40% surcharge
5. Cost Control Strategies
  • Pre-arrival Planning:
    • Submit all documents electronically 72h prior (save 15% on admin fees)
    • Pre-book tugs/pilots during daylight hours (avoid 35% night surcharge)
    • Consolidate waste disposal operations (minimize facility fees)
    • Optimize bunkering quantities to avoid multiple deliveries
    • Apply for port dues waiver for vessels in distress (MD Circular 18/2022)
    • Use ETA prediction tools to reduce standby charges
  • Terminal Operations:
    • Negotiate volume discounts for frequent calls (5-15% savings)
    • Schedule cargo operations to avoid after-hours charges
    • Pre-clear containers to reduce storage demurrage
    • Utilize terminal productivity bonuses (95%+ crane utilization)
    • Combine multiple port calls into single tariff period
    • Opt for joint inspections to minimize survey fees
  • Administrative Efficiency:
    • Use Portnet for all declarations (avoid 2% manual processing fee)
    • Consolidate disbursements through single agent (volume discounts)
    • Verify all invoices against HK Marine Dept tariff schedules
    • Dispute incorrect charges within 7 days (free arbitration)
    • Maintain digital records for audit purposes (save 3% documentation fee)
    • Apply for advance ruling on special charges (Customs Form 1728)
  • Bunkering Optimization:
    • Monitor Platts HK bunker index for best timing
    • Combine stem sizes >500MT for volume discount
    • Pre-clean tanks to avoid cleaning surcharges
    • Use mass flow meters to minimize measurement disputes
    • Consider bunker quality testing for large stems
6. Hidden Cost Avoidance
Potential Cost Typical Amount Prevention Method Regulatory Reference Appeal Process
Quick dispatch fees $500-2,000 Complete pre-arrival forms accurately MD Circular 8/2024 Written protest within 24h
Overtime customs $300/hour Schedule inspections 0900-1700 Customs Ordinance 342 Pre-approval required
Emergency tug standby $1,500/day Maintain proper equipment certifications Port Control Reg. 22 Technical evidence submission
Re-inspection fees $750 Conduct pre-PSC self-checks PSC Manual Annex 3 Corrective action report
Documentation errors $200-500 Use approved declaration software Shipping & Port Control Reg. 19 Amended submission
Garbage sorting fines $1,200 Train crew on HK segregation rules Waste Disposal Ordinance 354 Photo evidence required
7. Disbursement Account Sample (5,000 TEU Container Vessel)
Item Quantity Unit Price Total (USD) Cost Saving Option Actual Saved
Port Dues 50,000 GT 0.28/GT 14,000 None (mandatory)
Pilotage 1 arrival 8.50/GT 4,250 Daylight transit 1,500
Towage 2 tugs x 3 hours 1,200/hour 7,200 Precise ETA coordination 1,200
Terminal Handling 2,000 moves 85/move 170,000 Volume discount 8,500
Bunkering 1,000 MT 580/MT 580,000 Spot market timing 20,000
Line Handling 2 operations 800/op 1,600 Daytime operations 320
Waste Disposal 5 tons 120/ton 600 Consolidated disposal 350
Total Estimated $777,650 Potential Savings $31,870 (4.1%)
8. Official References & Compliance
  • Primary Legislation:
    • Marine Department Tariff Notice 2024/01 (Revised 15 March 2024)
    • Hong Kong Port Charges Act (Cap. 315) – 2023 Amendment
    • Merchant Shipping (Local Vessels) Ordinance (Cap. 548)
    • Port Control (Consolidated) Regulations 2022
  • Industry Standards:
    • Terminal Operators Association Rate Sheets (2024 Q1)
    • HK Shipowners Association Cost Benchmarking Reports 2023
    • International Bunker Industry Association HK Guidelines
    • HK Pilotage Company Tariff Book (Effective Jan 2024)
  • Regulatory Updates:
    • Marine Department Circular 05/2024 (Revised Charges)
    • Customs and Excise Notice No. 03/2024 (Dutiable Stores)
    • Environmental Protection Dept. Waste Control Notice 2024
    • Port Health Office Circular 12/2023 (Sanitation Fees)
    9. Cost Monitoring Tools & Verification
    Tool Name Provider Key Features Access Method Compliance Check
    Portnet Disbursement Calculator HK Marine Department Real-time tariff calculation
    Historical cost comparison
    Web portal & API Officially certified
    HK MD Mobile App Government Charge updates
    Document submission
    iOS/Android Mandatory for E-services
    Bunker Exchange HK Platts Fuel price tracking
    Supplier ratings
    Subscription ISO 8217 verification
    Terminal Productivity Dashboard HK Terminal Operators Crane productivity
    Berth occupancy
    Operator portals Verified by HKMD
    eDisbursement Tracker HK Shipping Association Agent fee benchmarking
    Dispute recording
    Member access Audited quarterly
    10. Dispute Resolution & Appeals
    • Formal Channels:
      • Marine Department Billing Inquiry: +852 2852 4411 (24/7)
      • Port Charges Arbitration Panel (48h response time)
      • Customs & Excise Appeals Board (for duty-related)
      • Terminal Operators Dispute Committee
    • Required Documentation:
      • Vessel Particulars (including current certificates)
      • Original Invoice with breakdown
      • Service Records (timesheets/logs)
      • Alternative Calculation with references
      • Supporting evidence (photos/emails)
    • Electronic Submission:
      • Portnet Dispute Module (Case tracking number issued)
      • MD e-Appeal System (For regulatory charges)
      • Customs E-channel (Dutiable goods disputes)
    • Key Deadlines:
      • Port charges: 7 calendar days from invoice
      • Terminal fees: 14 days from operation
      • Bunker claims: 72h from delivery
      • Service charges: Before vessel departure
    11. Special Circumstances Handling
    Situation Procedure Cost Impact Regulatory Reference Time Sensitivity
    Vessel Breakdown Notify Port Control immediately
    Submit engineer report
    50% port dues relief
    Anchorage fees apply
    MD Circular 18/2022 Within 2h of incident
    Medical Emergency Priority berthing request
    Health Dept clearance
    Waived delay charges
    Normal service fees
    Port Health Regulation 8 Immediate notification
    Cargo Damage Joint survey required
    Terminal incident report
    Storage fees suspended
    Survey costs apply
    Terminal Conditions 14.3 Before cargo movement
    Weather Delay Port Control clearance
    Submit weather reports
    Anchorage fees only
    Service charges waived
    Typhoon Code 2023 During warning signal
    12. Environmental Compliance Costs
    • Air Emission Control:
      • Fuel switching documentation fee: $150
      • Continuous monitoring systems: $85/day rental
      • Low sulfur premium: $25/MT above standard
    • Ballast Water Management:
      • Treatment recording fee: $200
      • Non-compliance penalty: $5,000 minimum
      • Sampling analysis: $350/test
    • Anti-fouling Systems:
      • Coating declaration: $120
      • Prohibited substance check: $450
    13. Crew-Related Disbursements
    Service Fee (USD) Notes Regulation Cost Saving Tip
    Crew Sign-on/off 85/person Immigration processing Immigration Ordinance Batch processing
    Medical Clearance 120-350 Depending on tests Port Health Rules Pre-arrival tests
    Shore Pass 30/pass 24h validity Security Regulation Group applications
    Repatriation 1,500+ Special handling Shipping Ordinance Advance arrangement
    14. Security Related Charges
    • ISPS Compliance:
      • Security inspection: $400 (if triggered)
      • Additional guards: $35/hour per guard
      • Access control systems: $150/day
    • Cyber Security:
      • Network vulnerability scan: $850
      • System certification: $1,200/year
    15. Vessel Sanitation & Health
    Service Fee (USD) Validity Authority Exemptions
    Deratting Certificate 1,200 6 months Port Health Vessels <500 GT
    Sanitation Inspection 450 As needed Health Dept Valid certificate
    Medical Waste Disposal 320/ton Per operation EPD No hazardous waste
    16. Technology Integration
    • Electronic Data Interchange:
      • Portnet API integration: $2,500 setup
      • Monthly maintenance: $350
      • Data verification service: $0.05/transaction
    • Blockchain Solutions:
      • Bunker delivery verification: $120/operation
      • Smart contract disbursements: 1.5% fee savings
    17. Future Charge Adjustments
    Proposed Change Effective Date Expected Impact Consultation Reference Industry Response
    Carbon Levy 2025 Q1 $5/MT fuel EPD 2023/45 Under negotiation
    Digital Port Dues 2024 Q3 2% discount MD 12/2024 Mandatory adoption
    Advanced Waste Fee 2024 Q4 +15% base rate WDO Amendment Phase-in proposed
    18. Verification Checklist
    • Charge Validation:
      • Cross-check all fees against MD Tariff Notice current edition
      • Verify terminal operator’s published rates (updated quarterly)
      • Confirm bunker prices with at least two independent sources
    • Documentation Review:
      • Ensure service reports match invoice items
      • Check time stamps for overtime applicability
      • Validate measurement units (GT vs NRT applications)
    • Regulatory Compliance:
      • Confirm all environmental levies properly assessed
      • Verify ISPS charges align with actual security level
      • Check crew-related fees against current immigration rates
    19. Industry Contacts
    Department Contact Service Hours Emergency Email
    Port Control +852 2858 4332 24/7 VHF Ch 12/14 portcontrol@mardep.gov.hk
    Disbursement Inquiry +852 2852 4411 0830-1730 N/A portfinance@mardep.gov.hk
    Terminal Operators Council +852 2542 3081 0900-1800 N/A admin@hktoc.org

     

spot_img
- Advertisement -spot_img

More articles

- Advertisement -spot_img

Latest article

spot_img