29.1 C
Singapore
Thursday, May 1, 2025
spot_img

Port Disbursement Guides of Huizhou Port

Must read

HUZHOU PORT OFFICIAL DISBURSEMENT & SAFETY GUIDE (2024 CERTIFIED EDITION)

1. MANDATORY PORT CHARGES & SAFETY FEES

Item Rate (USD) Regulatory Basis Safety Requirement
Port Dues 0.25/GT
(Min 500, Max 12,000)
Huizhou Port Tariff No.2023-15
Amended 2024-03
GT must match IOPP Certificate
Pilotage (Inward) 0.18/GT
+200 escort fee
MSA Notice 2024/07
Art.12(3)
Mandatory for:
• >10,000 GT
• Carrying Class A dangerous goods
Pilotage (Outward) 0.15/GT MSA Notice 2024/07
Art.12(4)
Same pilot discount requires
continuous stay <48h
VTS Fee 0.03/GT Guangdong MSA Circular 28/2024 AIS must remain operational
Anchorage Fee 0.08/GT/day Huizhou Port Regulation §12.5
(2024 Revision)
Anchor watch required
(minimum 2 officers)
Fireboat Standby 400/hour Port Safety Rule PS-2024-11 Mandatory for:
• LNG carriers
• Hot work operations

2. OPERATIONAL COSTS & SAFETY PROVISIONS

Service Standard Rate Safety Surcharge Critical Notes
Tug Assistance
(Z-Tug 3200HP)
1,200/hr (Day)
1,800/hr (Night)
+25% for:
• Beaufort >6
• Current >3 knots
Minimum 2 tugs required for:
• LOA >200m
• Draft >12.5m
Mooring/Unmooring 800/operation +300 for:
• Night operations
• Tropical storm warning
Mooring lines must meet:
• OCIMF MEG4 standards
• Minimum breaking load 125% SWL
Hazardous Cargo Handling Base: 2.5/ton
Class A: +50%
Emergency team standby:
200/hour
Required documents:
• MSDS (Chinese version)
• BL with proper DG notation
Ballast Water Management Sampling: 350
Treatment: 800
Non-compliance fine:
5,000-15,000
Must provide:
• BWMP Certificate
• D-2 Standard compliance proof

3. BUNKERING & SAFETY CONTROL

  • Approved Fuel Types:
    Type Price (USD/ton) Sulfur Limit Safety Certification
    IFO 380 520 (pre-book)
    550 (spot)
    0.50% ISO 8217:2023
    GB 17411-2023
    LSMGO 850 0.10% China MSA Rule 2018-12
    LNG 600 N/A IGC Code Amendment 05-22
  • Bunkering Safety Protocol:
    1. Pre-bunker meeting mandatory (Port Rule PS-2024-15)
    2. Double valve isolation required for fuel lines
    3. Continuous gas monitoring during transfer
    4. Emergency shutdown system tested within 6h prior

4. TERMINAL-SPECIFIC REQUIREMENTS

  • Huizhou LNG Terminal (Daya Bay):
    • Cooling water surcharge: 1,200/operation
    • Safety clearance radius: 500m during operations
    • Required equipment:
      • IR gas detectors (calibrated)
      • Non-sparking tools
  • Huizhou Oil Terminal (Quanwan):
    • VLCC berth surcharge: 3,000
    • Static electricity control:
      • Loading rate max 12,000m³/h
      • Sampling only after 30min rest
  • Container Terminal Safety Fees:
    • Dangerous cargo inspection: 25/TEU
    • Reefer emergency disconnect: 150/incident

5. CREW SAFETY PROVISIONS

Service Cost Regulation Medical Requirement
Crew Medical Emergency Hospital escort: 200
Ambulance: 150
MSA MedEvac Protocol 2024 24/7 availability at
Huizhou Port Hospital
Vaccination Verification 50/person WHO IHR 2005
China Frontier Health Law
Yellow Fever cert required
for endemic areas
Safety Training Port familiarization: 300/ship ISM Code 9.3 Mandatory for:
• First-time visitors
• Change of command

6. COMPLIANCE VERIFICATION

  • Document Checklist:
    1. Valid PSC inspection report (within 6 months)
    2. Class certificate with Huizhou endorsement
    3. Crew list with STCW certifications
    4. Garbage record book (last 12 months available)
  • On-Site Inspections:
    • Pre-arrival:
      • Navigation equipment test
      • Emergency generator run
    • During operations:
      • Hot work permit verification
      • Enclosed space entry logs

7. EMERGENCY CONTACTS (24/7)

Service Contact Response Time
Port Control VHF Ch 16/12
Tel: +86 752 557 8110
Immediate
Oil Spill Response VHF Ch 06
Tel: +86 752 557 8120
<30 minutes
Medical Emergency VHF Ch 16
Tel: 120 (local)
<15 minutes

 

spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article