27.8 C
Singapore
Sunday, April 27, 2025
spot_img

Port Disbursement Guides of Taichung Port

Must read

  1. Vessel-Related Charges:
    Port Dues:
    * Base rate: $0.085 per GT (minimum $600)
    * Discounts:
    – 10% for Green Ships (ESI>30)
    – 5% for frequent callers (>12 calls/year)
    – Additional 5% for LNG-powered vessels
    * NEW: Carbon-neutral vessels: 7% discount (verified by TPA)
    Pilotage Fees:
    * Entry/Departure: $0.32 per GT (min $1,200)
    * Shifting: $0.28 per GT (min $900)
    * Special berths (29-33): +20% surcharge
    * Night surcharge: +25% (2000-0600)
    * VLCC surcharge: +15%
    * NEW: Emergency pilotage: 2x standard rate
    Tug Charges:
    * 80T bollard pull: $850/hour (first 2 hours)
    * 100T bollard pull: $1,100/hour
    * 120T bollard pull: $1,350/hour
    * Standby rate: 60% of working rate
    * NEW: Adverse weather surcharge: +40% (Beaufort 7+)
    Berth Fees:
    * General cargo: $0.55/m²/day
    * Container ships: $0.65/m²/day
    * Oil tankers: $0.75/m²/day (hazardous surcharge +15%)
    * Cruise ships: $0.85/m²/day
    * NEW: Military vessels: 50% discount (Govt. verification required)
  2. Mooring Services:
    Mooring/Unmooring:
    * <200m LOA: $350 per operation * >200m LOA: $450 per operation
    * Extra-long vessels (>300m): +$100
    * NEW: Double operations (tidal conditions): +$150
    Light Dues:
    * $0.015 per GT (max $3,000 per call)
    * NEW: Temporary light removal: $250 fee
    Quarantine Fees:
    * Standard inspection: $400
    * Extended inspection: $750 (if required)
    * Emergency medical inspection: $1,200
    * NEW: Vector control treatment: $600 per application
  3. Operational Services:
    Bunkering Services:
    * Delivery charge: $25 per metric ton
    * Barging fee: $1,200 per operation
    * LNG bunkering: $35 per metric ton
    * NEW: Biofuel premium: +$8 per ton
    Fresh Water Supply:
    * $3.20 per ton (minimum 50 tons)
    * Emergency supply: +30% surcharge
    * NEW: Potable water testing: $85 per sample
    Garbage Disposal:
    * General waste: $120 per cubic meter
    * Hazardous waste: $450 per cubic meter
    * Food waste: $85 per cubic meter
    * NEW: Medical waste: $650 per cubic meter
  4. Cargo Handling Charges:
    Cargo Wharfage:
    * Containers: $12/TEU (import/export)
    * Bulk cargo: $1.20 per metric ton
    * Breakbulk: $2.80 per revenue ton
    * RO-RO: $3.50 per lane meter
    * NEW: Project cargo: $4.20 per metric ton
    Stevedoring:
    * Container handling: $85 per move
    * Bulk loading: $3.50 per metric ton
    * Heavy lift (>100T): $250 per ton
    * NEW: Dangerous goods handling: +25% surcharge
    Storage Fees:
    * First 5 days free, then $0.30/m²/day
    * Refrigerated containers: $4.50/TEU/day
    * NEW: Bonded warehouse: $0.45/m²/day
  5. Special Services:
    Sludge Removal:
    * $150 per cubic meter (min 5m³)
    * NEW: Tank cleaning verification: $300 per tank
    Fire Services:
    * Standby: $350 per hour
    * Active deployment: $1,200 per hour
    * Foam application: $2,500 per incident
    * NEW: CO2 system activation: $3,800
    Ship Chandler Services:
    * Delivery fee: $120 per trip
    * After-hours: +50% surcharge
    * Bonded stores clearance: $85
    * NEW: Medical supply delivery: +$100 fee
  6. Additional Charges:
    Port Security Fee:
    * $0.02 per GT (min $200, max $1,500)
    * NEW: Armed guards: $250 per day
    Customs Clearance:
    * Standard: $350 per vessel
    * Express service: $600 (2-hour processing)
    * NEW: Temporary import: $850
    Ship Agency Fee:
    * 0.15% of total port charges (min $800)
    * NEW: Crew change handling: $150 per person
    Lashing Services:
    * $12 per container
    * Storm lashing: $18 per container
    * NEW: Special cargo lashing: $25 per unit
  7. Cost Control Measures:
    Pre-arrival Planning:
    * Submit complete documentation 72h prior to avoid delays ($500/hour demurrage)
    * NEW: Digital submission discount: 3% fee reduction
    Bunkering Optimization:
    * Coordinate with tide schedules for fuel efficiency
    * NEW: Group purchasing: 8% volume discount
    Waste Management:
    * Consolidate waste types to minimize handling charges
    * NEW: Pre-sorting discount: 12% reduction
    Off-peak Operations:
    * Request night shifts for 15% labor cost reduction
    * Weekend cargo operations: 10% discount
    * NEW: Holiday operations: 20% discount (prior approval)
  8. Safety Critical Notes:
    – All hazardous material handling requires pre-approval (72h notice)
    – Emergency towing arrangements must be verified before entry
    – Gangway safety nets mandatory for vessels >15m freeboard
    NEW: COVID-19 protocols still apply for medical waste
  9. Final Validation:
    – All amounts in USD (conversion rate 1 USD = 31.5 TWD)
    – Emergency contact: +886-4-2656-2000 (TPA Operations)
spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article