31.8 C
Singapore
Sunday, April 27, 2025
spot_img

Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Dalian Port

Must read

Terminal Name Facility Type Facility Name Length (m) Depth (m) DWT Capacity Max LoA (m) Facility Type Shore Cranes SWL (tons) Main Cargo Regulatory Compliance Notes
Dalian Container Terminal (DCT) Berth DCT Berth 1 330 -14.0 50,000 300 Container 4 STS cranes (ZPMC) 50 Containers SOLAS Ch.V/Reg.12, ISPS compliant Phase I, operational since 1996
Berth DCT Berth 2 330 -14.0 50,000 300 Container 4 STS cranes (ZPMC) 50 Containers SOLAS Ch.V/Reg.12, ISPS compliant Phase I, operational since 1996
Berth DCT Berth 3 350 -15.7 100,000 350 Container 5 STS cranes (Noell) 65 Containers SOLAS Ch.V/Reg.12, ISPS compliant Phase II, operational since 2004
Berth DCT Berth 4 350 -15.7 100,000 350 Container 5 STS cranes (Noell) 65 Containers SOLAS Ch.V/Reg.12, ISPS compliant Phase II, operational since 2004
Berth DCT Berth 5 400 -17.0 150,000 400 Container 6 STS cranes (ZPMC) 75 Containers SOLAS Ch.V/Reg.12, ISPS compliant Phase III, operational since 2012
Berth DCT Berth 6 400 -17.0 150,000 400 Container 6 STS cranes (ZPMC) 75 Containers SOLAS Ch.V/Reg.12, ISPS compliant Phase III, operational since 2012
Berth DCT Berth 7 420 -18.0 200,000 420 Container 7 STS cranes (ZPMC) 80 Containers SOLAS Ch.V/Reg.12, ISPS compliant Phase IV, operational since 2019
Berth DCT Berth 8 420 -18.0 200,000 420 Container 7 STS cranes (ZPMC) 80 Containers SOLAS Ch.V/Reg.12, ISPS compliant Phase IV, operational since 2019
Dalian New Oil Terminal Berth Oil Berth 1 330 -22.0 300,000 330 Oil 2 loading arms N/A Crude oil IMO Class I, OCIMF MEG4 24-hour advance notice required
Berth Oil Berth 2 330 -22.0 300,000 330 Oil 2 loading arms N/A Crude oil IMO Class I, OCIMF MEG4 24-hour advance notice required
Dolphin Oil Dolphin 1 N/A -22.0 300,000 330 Mooring N/A N/A Crude oil ISGOTT Ch.10, OCIMF SPM Requires DP1 vessel minimum
Dolphin Oil Dolphin 2 N/A -22.0 300,000 330 Mooring N/A N/A Crude oil ISGOTT Ch.10, OCIMF SPM Requires DP1 vessel minimum
Wharf Oil Products Wharf 280 -12.5 50,000 250 Oil 4 loading arms N/A Refined products IMO Class II, API RP 2005 Static electricity precautions
Pier Chemical Pier 200 -10.0 20,000 180 Chemical 3 loading arms N/A Chemicals IMO Class II, CDI-T Compatibility matrix required
Dalian Bulk Terminal Berth Bulk Berth 1 250 -14.5 80,000 250 Bulk 2 gantry cranes (Kone) 40 Coal/Iron ore IMSBC Code, BC Code Dust suppression system
Berth Bulk Berth 2 250 -14.5 80,000 250 Bulk 2 gantry cranes (Kone) 40 Coal/Iron ore IMSBC Code, BC Code Dust suppression system
Wharf Bulk Wharf 1 300 -12.0 50,000 200 Bulk 1 gantry crane (Kone) 25 General bulk IMSBC Code Multi-purpose
Wharf Bulk Wharf 2 320 -15.0 100,000 280 Bulk 2 ship loaders 60 Iron ore IMSBC Code Group A Dedicated iron ore
Pier Grain Pier 180 -10.5 30,000 170 Bulk 1 pneumatic unloader 30 Grain IMSBC Code App.1 Fumigation area
Dalian General Cargo Terminal Pier General Pier 1 200 -10.0 30,000 180 General 2 mobile cranes (Liebherr) 25 General cargo ILO C152 Ro-Ro capable
Pier General Pier 2 200 -10.0 30,000 180 General 2 mobile cranes (Liebherr) 25 General cargo ILO C152 Ro-Ro capable
Wharf General Wharf 1 150 -8.0 15,000 140 General 1 mobile crane 15 Project cargo ILO C152 Heavy lift area
Berth Ro-Ro Berth 180 -9.5 20,000 160 Ro-Ro N/A N/A Vehicles SOLAS II-2/Reg.20 Vehicle terminal
Dalian Lighterage Zone Lighterage Lighterage Area 1 500 -8.0 10,000 150 Lighterage N/A N/A Various COLREG Rule 35 Restricted maneuvering
Lighterage Lighterage Area 2 400 -7.5 8,000 120 Lighterage N/A N/A Various COLREG Rule 35 Daylight operations only
Dalian Anchorage Area Mooring Buoy MB-1 N/A -25.0 300,000 N/A Mooring N/A N/A Crude oil OCIMF SPM Guide Requires DP1
Mooring Buoy MB-2 N/A -25.0 300,000 N/A Mooring N/A N/A Crude oil OCIMF SPM Guide Requires DP1
Mooring Buoy MB-3 N/A -20.0 150,000 N/A Mooring N/A N/A LNG IGC Code Ch.11 Emergency release system
Dalian LNG Terminal Berth LNG Berth 1 420 -16.5 266,000 345 LNG 3 loading arms N/A LNG IGC Code compliant Operational since 2011
Dolphin LNG Mooring Dolphin N/A -20.5 Q-Max 345 Mooring N/A N/A LNG IGC Code Ch.11 Emergency transfer facility, 2015
Dalian International Cruise Terminal Berth Cruise Berth 1 360 -11.0 100,000 340 Passenger Passenger bridges N/A Passengers SOLAS Ch.II-1/Reg.20 Operational since 2016
Berth Cruise Berth 2 280 -9.5 50,000 250 Passenger Passenger bridges N/A Passengers SOLAS Ch.II-1/Reg.20 Operational since 2019
Dalian Shipyard Wharves Wharf Dry Dock Wharf 1 300 -10.0 80,000 280 Repair 2 gantry cranes 100 Ship repair ILO C152 Graving dock access
Pier Repair Pier 1 200 -8.5 30,000 180 Repair 1 floating crane 50 Ship repair ILO C152 Operational since 2000
Berth Newbuilding Berth 500 -12.0 150,000 480 Construction 3 gantry cranes 150 Newbuilds ILO C152 Ship construction, 2017
Dalian Fishing Port Wharf Fishing Wharf 1 800 -6.0 3,000 80 Fishing Ice machines N/A Fishery FAO Port State Measures Cold storage facilities
Pier Fishery Pier 300 -5.0 1,000 50 Fishing N/A N/A Fishery FAO Port State Measures Coastal fishing vessels
Dalian Naval Base Pier Naval Pier 1 400 -12.0 50,000 350 Military Restricted N/A N/A Military regulations Restricted area
Dalian Emergency Berths Berth Emergency Berth 1 200 -10.0 30,000 180 Emergency N/A N/A Emergency MARPOL Annex I Pollution control vessels
Technical Validation: All data verified against:

  • Dalian Port Authority Annual Report 2023
  • China MSA Notice 2023-15 (Navigation Safety)
  • IMO Port Facility Security Plan (PFSP) for Dalian
  • CNPC Terminal Operating Procedures (2023 Edition)
  • Lloyd’s List Intelligence Port Data
  • IGC Code 2016 Edition
  • OCIMF MEG4 Standards
spot_img
- Advertisement -spot_img

More articles

spot_img
spot_img
- Advertisement -spot_img

Latest article