1. Port Dolphins

Dolphin Name Location (Coordinates) Structure Type Fendering System Max Vessel Size (DWT) Bollard Capacity (t) Inspection Date Note
Gamagori North Dolphin 34°50’12″N, 137°13’45″E Reinforced concrete D-type rubber fenders (H:1000mm, SWL:200kN) 50,000 75 2023-11-15 ClassNK certified for oil tankers
Gamagori South Dolphin 34°49’58″N, 137°13’30″E Steel pile cluster Cell-type fenders (SWL:150kN) 30,000 50 2023-09-22 Equipped with quick-release hooks (SOLAS compliant)
Central Mooring Dolphin 34°50’05″N, 137°13’50″E Concrete caisson Arch fenders (H:1200mm, SWL:180kN) 20,000 40 2024-01-10 Dedicated for barge operations (night lighting available)
East Auxiliary Dolphin 34°50’18″N, 137°14’05″E Steel jacket Cone fenders (H:800mm) 15,000 30 2023-12-05 For workboat mooring only

2. Mooring Buoys

Buoy ID Location (Coordinates) Type Max Vessel Size (DWT) Holding Capacity (t) Chain Scope (m) Maintenance Cycle Lighting Note
GM-1 34°50’15″N, 137°14’10″E Single-point CALM 50,000 200 250 Annual (June) Fl.Y 10s Approved for crude oil transfer (OCIMF standards)
GM-2 34°49’45″N, 137°14’05″E Multi-point SALM 30,000 150 200 Biennial Fl.R 5s Restricted to daylight operations (0700-1800)
GM-3 34°50’30″N, 137°13’55″E Yoke mooring 10,000 80 150 Quarterly Fl.G 15s For LPG carriers only (IGC Code compliant)
GM-4 34°49’30″N, 137°13’40″E Multi-buoy 20,000 100 180 Semi-annual Fl.Y 12s For general cargo vessels (max 24h stay)

3. Piers

Pier Name Length (m) Depth (m) Deck Load (t/m²) Bollard Capacity (t) Lighting System Firefighting Class Access Width (m) Note
Main Commercial Pier 320 10.5 5.0 50 200 lux (LED) Class III 12 ISO 9001 certified operations (crane rails installed)
Fishing Pier 180 6.0 3.0 25 150 lux Class II 8 Ice-making facilities available (24/7)
Ferry Terminal Pier 150 8.0 4.0 40 180 lux Class II 10 Passenger gangways compliant with SOLAS Ch.II-1/3-9
Coal Handling Pier 200 11.5 8.0 60 220 lux Class IV 15 Dust suppression system installed (2022)

4. Berths

Terminal Name Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes Safe Working Load (SWL) Main Cargo Operational Restrictions Note
Gamagori General Cargo Terminal Berth 1 150 9.0 20,000 140 Quay wall 2 x 25t (Liebherr LHM 280) 25t General cargo No hazardous materials Concrete facing (50cm wear layer), 8 bollards
Gamagori General Cargo Terminal Berth 2 180 10.0 30,000 160 Quay wall 1 x 40t (Konecranes Gottwald Model 6) 40t Project cargo Prior 48h notice required Heavy lift capability (DNV certified), 10 bollards
Gamagori Liquid Terminal Tanker Berth 200 12.5 50,000 190 Dolphin-type None N/A Petroleum products Double hull required, max transfer rate 1,000m³/h Pipeline connections (8″ diameter), vapor recovery
Gamagori Container Terminal CT-1 220 11.0 35,000 200 Open wharf 2 x 45t STS (ZPMC) 45t under spreader Containers Max stack height 4, windspeed limit 15m/s Reefer plugs available (100 units), OCR system
Gamagori Ro-Ro Terminal Ro-Ro 1 250 9.5 25,000 230 Ramp-equipped 2 x 20t forklifts 20t Vehicles/rolling stock Max ramp slope 10% Vehicle inspection area (600m²)

5. Lighterages

Lighterage Area Location (Coordinates) Max Draft (m) Area (m²) Current Speed (kts) Anchorage Type Holding Ground Note
North Lighterage Zone 34°51’00″N, 137°13’20″E 5.0 15,000 1.5 Mud bottom Good Daylight operations only (0700-1800)
South Lighterage Zone 34°48’45″N, 137°12’55″E 4.5 10,000 2.0 Sand bottom Fair Restricted to barges <100m LOA
East Lighterage Zone 34°50’30″N, 137°14’30″E 6.0 20,000 1.2 Clay bottom Excellent For dangerous goods only (Class 3-9)

6. Wharves

Wharf Name Length (m) Depth (m) Ownership Access Type Security Level Fendering Note
Municipal Wharf 120 5.5 Public Open access ISPS Level 1 Rubber D-type 24/7 CCTV monitoring, pilot boarding area
Industrial Wharf 250 8.0 Private Prior approval ISPS Level 2 Cell-type Armed guards present, restricted area
Shipyard Wharf 180 7.5 Private Contractual ISPS Level 2 Timber Drydock access available, repair facilities
Fisheries Wharf 90 4.0 Cooperative Member only ISPS Level 1 Timber Ice and fuel services, fish market adjacent

7. Additional Facilities

Facility Type Name/ID Specifications Regulatory Compliance Availability Note
Pilot Station Gamagori Pilot 2 pilot boats (12m LOA, 15kn speed) MLIT Ordinance No.28 24/7 Mandatory for >500GT vessels, VHF Ch.12
Tug Base Mikawa Tug Co. 3 tugs (40t, 60t, 80t bollard pull) ClassNK certified 24/7 Advance booking required for >80t assist
Bunkering Station Gamagori Bunker IFO380, MGO, LNG available ISO 8217 standards 0600-2200 72h notice for LNG bunkering
Waste Reception Port Waste Facility Capacity: 50m³/day liquid, 20t/day solid MARPOL Annex V 0800-2000 Pre-paid system, mandatory for international ships

Technical Verification:

  • All depth measurements refer to Chart Datum (CD) +0.5m tidal allowance
  • Coordinates based on WGS84 datum (EPSG:4326)
  • Load limits comply with Japan Port and Harbor Law Article 37 (2021 revision)
  • Safety margins calculated per IMO MSC.1/Circ.1212 (2020 edition)
  • Firefighting systems meet NFPA 307 standards
  • All fendering systems certified to PIANC 2002 guidelines

Operational Notes:

  • Port operating hours: 0700-2200 (Extended for emergencies with prior notice)
  • Mandatory pre-arrival notification: 72 hours via JP-MARINE system (96h for hazardous cargo)
  • Winter operations: Anti-icing measures available December-February (brine spray system)
  • Maximum permissible windspeed for cargo operations: 15m/s (gusting)