Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Guangzhou Port

0
193
Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Guangzhou Port

 

Terminal Name Berth Name Length (m) Depth (m)
(Chart Datum)
DWT Capacity Max LoA (m) Berth Type Shore Cranes SWL (tons) Main Cargo Safety Notes
Nansha Container Terminal Phases II-IV NCT-6 (Phase II) 400 -16.8 180,000 380 Container 6×ZPMC STS Cranes (65t) 65 Container Mandatory bow thruse operation for vessels >350m
NCT-9 (Phase IV Auto) 480 -17.2 200,000 420 Ro-Ro 4×Auto Ramps (24m width) NA Vehicles EV handling requires Class 1 Div 2 area certification
NCT LNG Bunkering 150 -12.5 30,000 160 LNG Bunker 2×Cryogenic Arms NA LNG Gas-free certificate required before departure
NCT Emergency Berth 300 -15.0 100,000 280 Multi-purpose Mobile Crane (100t) 100 Emergency Priority for SAR operations (MSA Notice 2024/11)
NCT Dolphins 1-4 NA -22.0 500,000 NA Mooring Dolphin Hydrostatic Tension Sensors 200t/m² VLCC Max wind force 6 Beaufort during mooring
NCT Barge Jetty 200 -8.0 5,000 75 Lighterage Feeder Tug must standby during cargo transfer
Xinsha Coal & Ore Terminal XCT-2A (Coal) 350 -14.5 150,000 265 Dry Bulk 4×Stacker-Reclaimers 55 Coal Thermal coal spontaneous combustion monitoring system
XCT-2B (Ore) 400 -16.0 250,000 360 Dry Bulk 2×Shiploaders (8,000t/h) 60 Iron Ore Dedicated stockpile area for 62% Fe content ore
XCT HAZMAT Berth 180 -11.0 50,000 155 Chemical Explosion-proof Cranes 40 Chemicals ISGOTT compliance required
XCT Mooring Buoys #1-3 NA -25.0 400,000 NA Mooring Buoy CAPESIZE Emergency release system tested quarterly
XCT Barge Transfer 120 -6.5 2,000 50 Lighterage 2×Floating Cranes 35 Transshipment Max current 2.5 knots during ops
Huangpu Traditional Port Area HPT-7 (Dangerous Cargo) 200 -10.5 40,000 165 Multi-purpose 3×EX-rated Cranes 30 Class 1-9 DG 500m Exclusion Zone during handling
HPT Dolphins 5-6 NA -18.0 80,000 NA Mooring Dolphin Tug Winches 80t General Spring line angle ≤45°
HPT Ro-Ro Wharf 280 -9.5 30,000 135 Ro-Ro 2×Vessel Ramps NA Cars/Machinery Deck load limit 5t/m²
HPT Lighterage Jetties 80/each -4.5 1,500 60 Lighterage General Daylight operations only
Guangzhou Cruise Terminal GCT Main 420 -11.0 150,000 360 Passenger 3×Passenger Bridges Cruise MUSTER stations cleared before docking
Dayushan Outer Anchorage Buoy A1-A6 (VLCC) NA -32.0 500,000 NA Mooring Buoy NA 300t Crude Oil Static electricity discharge mandatory pre-berthing
Buoy B1-B12 (General) NA -25.0 200,000 NA Mooring Buoy NA 150t General VHF Ch 16 & 70 monitoring required
GWS Shiprepair Dock Graving Dock #1 520 -15.0 300,000 500 Dry Dock 2×500t Goliath Cranes 500 Repair Gas-free certification for hot works