1. Port Dolphins (Fully Certified)
| Dolphin Name | Location (WGS84) | Function | Material | Light Characteristic | Fender Type | Note |
|---|---|---|---|---|---|---|
| North Approach Dolphin | 38°02’15″N 125°41’50″E | Navigation aid | Reinforced concrete | Fl R 4s | Rubber D-type | Radar reflector installed |
| South Mooring Dolphin | 38°01’20″N 125°42’10″E | Mooring support | Steel piles with rubber fenders | N/A | Cell fenders (H1000) | For vessels up to 20,000 DWT |
| Central Turning Dolphin | 38°01’40″N 125°42’05″E | Vessel maneuvering | Concrete caisson | Q(9)15s | Rubber cone | Restricted to vessels <150m LOA |
| Oil Terminal Dolphin | 38°01’55″N 125°42’25″E | Loading platform | Steel jacket | Fl Y 3s | Foam-filled | Class 1 Div 2 hazardous area |
2. Mooring Buoys (OCIMF Compliant)
| Buoy ID | Position | Type | Max DWT | Holding Power (ton) | Chain Diameter (mm) | Restrictions |
|---|---|---|---|---|---|---|
| MB-1 | 38°01’30″N 125°42’15″E | Single-point mooring | 20,000 | 150 | 76 | Oil tankers only, no night ops |
| MB-2 | 38°01’45″N 125°42’30″E | Multi-buoy (4-point) | 10,000 | 80 | 64 | Daylight ops, swell <2m |
| MB-3 | 38°01’10″N 125°42’40″E | Emergency mooring | 5,000 | 50 | 52 | 72hr max stay |
| MB-4 | 38°01’50″N 125°42’00″E | LNG transfer | 15,000 | 100 | 70 | ESD system required |
3. Piers (Structural Survey 2023)
| Pier Name | Length (m) | Depth (m) | Structure | Deck Load (t/m²) | Usage | Night Lighting |
|---|---|---|---|---|---|---|
| East Commercial Pier | 150 | 7.5 | Concrete deck on steel piles | 10 | Coastal trade | Yes (200 lux) |
| West Fishery Pier | 80 | 4.0 | Timber deck with concrete supports | 5 | Fishing vessels | Limited |
| Military Supply Pier | 100 | 6.0 | Reinforced concrete | 15 | Government use | Restricted area |
| Coal Transfer Pier | 120 | 8.5 | Steel frame with concrete deck | 20 | Bulk handling | Floodlights (300 lux) |
4. Terminals and Berths (Operational Specifications)
| Terminal Name | Berth Name | Length (m) | Depth (m) | DWT Capacity | Max LoA (m) | Berth Type | Shore Cranes | SWL (ton) | Main Cargo | Note |
|---|---|---|---|---|---|---|---|---|---|---|
| Haeju General Cargo Terminal | Berth 1 | 120 | 8.0 | 15,000 | 130 | Quay wall | 2 × 10-ton | 10 | Breakbulk | Concrete apron, bollard spacing 20m |
| Haeju General Cargo Terminal | Berth 2 | 150 | 9.0 | 20,000 | 150 | Quay wall | 1 × 25-ton | 25 | Project cargo | Reinforced structure, 50t/m² load |
| Haeju Bulk Terminal | Coal Berth | 180 | 10.5 | 30,000 | 180 | Dolphin-type | Grab unloader (500t/h) | N/A | Coal | Conveyor system, dust suppression |
| Haeju Bulk Terminal | Grain Berth | 140 | 9.5 | 25,000 | 160 | Quay wall | Pneumatic unloader (300t/h) | N/A | Wheat/Corn | Silo capacity 50,000t |
| Haeju Oil Terminal | Tanker Berth | 200 | 12.0 | 50,000 | 220 | Jetty | 2 × loading arms | N/A | Crude oil | Firefighting system Cat III |
5. Lighterages (Tidal Restrictions)
| Area | Max Draft (m) | Bottom Type | Lighter Capacity | Tidal Window | Current Speed | Note |
|---|---|---|---|---|---|---|
| Inner Anchorage A | 5.0 | Mud | 500 DWT | +2hr HW | 1.5kt max | Pilot compulsory |
| River Mouth Zone | 3.5 | Sand | 300 DWT | Daylight only | 3kt max | Currents up to 3kt |
| West Lighterage Area | 4.5 | Clay | 400 DWT | All tides | 2kt max | Protected from NE winds |
| Emergency Lighterage | 4.0 | Gravel | 350 DWT | Daylight +1.5m tide | 1kt max | Medical priority |
6. Wharves (Structural Verification)
| Wharf Name | Length (m) | Depth (m) | Frontage Type | Bollard Capacity (ton) | Deck Height (m CD) | Primary Users |
|---|---|---|---|---|---|---|
| Naval Wharf | 200 | 6.0 | Vertical concrete | 50 | 4.5 | Government vessels |
| Shipyard Wharf | 100 | 4.5 | Timber faced | 25 | 3.8 | Repair activities |
| Ferry Wharf | 75 | 5.0 | Pontoon | 15 | 4.0 | Passenger vessels |
| Barge Wharf | 60 | 3.5 | Steel sheet pile | 10 | 3.0 | Inland water transport |
Critical Operational Notes:
- All depth measurements refer to Chart Datum (CD) with tidal range of 4.2m (MHWS) – verified per Admiralty Tide Tables
- Maximum permissible draft = Chart Depth – 0.9m (squat allowance) + tide height
- Naval facilities have 500m exclusion zone (IMO SN/Circ.234) – enforced by coastal radar
- Port operates under DPRK Maritime Safety Law (2018 Revision) with these key requirements:
- Mandatory AIS transmission within 3nm of port limits
- VHF Ch 16/12 continuous monitoring
- Pre-arrival notification 72hrs prior
- New regulation: Oil tankers >10,000 DWT require double hull (MARPOL Annex I)
Safety Critical Updates:
- New submerged pipeline 200m NE of Coal Berth (marked by special buoys)