30.9 C
Singapore
Friday, December 5, 2025
spot_img

Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Himekawa Port

Must read

1. Port Dolphins

Dolphin Name Location Function Max Vessel Size Construction Fender Type Installation Year Inspection Cycle Note
Himekawa North Dolphin 42°20’15″N 140°56’30″E Mooring assistance 10,000 DWT Reinforced concrete Cell fender (D1000) 2015 Annual Night lighting available
Himekawa South Dolphin 42°19’45″N 140°56’15″E Mooring assistance 10,000 DWT Reinforced concrete Cell fender (D1000) 2015 Annual Equipped with bollards (SWL 50t)
Himekawa East Dolphin 42°20’20″N 140°57’00″E Tanker mooring 15,000 DWT Steel pile Super Cone fender 2018 Biannual ISO 17357-1 certified, fireproof coating
Himekawa West Dolphin 42°20’10″N 140°55’45″E Emergency mooring 8,000 DWT Composite Dual-cell fender 2020 Annual Restricted to vessels <150m LOA

2. Mooring Buoys

Buoy ID Position Type Max DWT Chain Diameter (mm) Scope Ratio Light Characteristic Maintenance Cycle Note
MB-1 42°20’30″N 140°56’45″E Single-point mooring 5,000 DWT 50 5:1 Fl.G.4s Quarterly JIS F 2002 compliant, yellow hull
MB-2 42°19’30″N 140°55’50″E Multi-point mooring 8,000 DWT 65 6:1 Fl.R.6s Biannual Seasonal use (Apr-Nov), heavy weather mooring prohibited
MB-3 42°20’10″N 140°56’20″E Emergency mooring 3,000 DWT 40 4:1 Fl.Y.5s Monthly 24/7 availability, max stay 48 hours
MB-4 42°19’50″N 140°56’40″E LNG carrier mooring 20,000 DWT 80 7:1 Fl.G.R.10s Monthly IGF Code compliant, exclusion zone 500m

3. Piers

Pier Name Length (m) Depth (m) Max LoA (m) Structure Deck Load (t/m²) Fender System Function Note
Himekawa Fishery Pier 120 5.5 60 Concrete deck on steel piles 3.0 D100 rubber fenders Fishing operations Ice-making facilities (20t/day capacity)
Himekawa Ferry Pier 80 6.0 70 Reinforced concrete 5.0 D200 rubber fenders Passenger ferry RO-RO ramp (SWL 20t), ADA compliant
Himekawa Coast Guard Pier 50 4.5 40 Steel sheet pile 10.0 Marine rubber fenders Official use only Restricted access, surveillance cameras installed
Himekawa Research Pier 40 4.0 35 Timber deck 2.0 Timber fenders Scientific use Limited to vessels <500 GT

4. Berths

Terminal Name Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes Safe Working Load (SWL) Main Cargo Operational Restrictions Note
Himekawa General Cargo Terminal Berth 1 150 8.5 15,000 130 Quay wall 2 (30t) 30t General cargo Max wind 15m/s JIS A 5308 standard concrete
Himekawa General Cargo Terminal Berth 2 180 9.0 20,000 150 Quay wall 3 (40t) 40t General cargo Max wind 15m/s Class A seismic design
Himekawa Container Terminal CT-1 200 12.0 30,000 180 Dolphin 2 (STS cranes) 50t Containers Max wind 12m/s Post-Panamax capable (16-row)
Himekawa Container Terminal CT-2 220 14.0 50,000 220 Quay wall 3 (STS cranes) 65t Containers Max wind 12m/s New Panamax capable (20-row)
Himekawa Bulk Terminal BT-1 250 15.0 80,000 250 Quay wall Gantry (1,000t/hr) N/A Coal/Iron ore Max wind 10m/s Dust suppression system installed

5. Lighterages

Area Name Max Draft (m) Max DWT Equipment Anchorage Type Wave Height Limit Current Limit Note
Himekawa Lighterage Zone A 4.5 3,000 2 floating cranes (15t) Protected anchorage <1.5m <1.5 knots Daylight operations only
Himekawa Lighterage Zone B 5.0 5,000 1 floating crane (25t) Open water area <2.0m <2.0 knots Requires tug assistance
Himekawa Lighterage Zone C 6.0 7,000 1 derrick barge (30t) Sheltered bay <1.8m <1.8 knots Requires pilotage
Himekawa Lighterage Zone D 7.0 10,000 2 floating cranes (40t) Deep water <2.5m <2.5 knots 24/7 operations permitted

6. Wharves

Wharf Name Length (m) Depth (m) Max LoA (m) Structure Deck Load (t/m²) Fire Protection Function Note
Himekawa Oil Wharf 100 10.0 120 Steel sheet pile 5.0 Foam system Petroleum products NFPA 30 compliant, Class 1 DG
Himekawa Bulk Wharf 150 9.5 140 Concrete caisson 10.0 Water curtain Coal/grains Conveyor system (500t/hr)
Himekawa LNG Wharf 180 15.0 200 Gravity wall 15.0 Dry chemical LNG carriers IGF Code compliant, 300m exclusion
Himekawa Chemical Wharf 120 12.0 150 Composite 8.0 Dual protection Hazardous liquids IBC Code compliant

 

Critical Operational Notices

  • Mandatory pre-arrival notification: 24 hours for vessels >500 GT
  • Maximum permissible wave height for operations: 1.5m (2.0m at deepwater berths)
  • Strict prohibition of:
    • Overloading beyond SWL ratings
    • Operations during typhoon warnings (Signal No. 3+)
    • Unauthorized hot work in hazardous zones
  • Emergency contacts:
    • Port Control: VHF Ch 12/16 (call sign “Himekawa Port”)
    • Coast Guard: VHF Ch 22 (call sign “Himekawa CG”)
spot_img
- Advertisement -spot_img

More articles

- Advertisement -spot_img

Latest article

spot_img