Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Kamaishi Port

0
176
Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Kamaishi Port

1. Port Dolphins

Dolphin Name Location (Coordinates) Construction Function Max DWT Depth (m) Mooring Lines Note
Kamaishi North Dolphin 39°16’45″N 141°53’00″E Reinforced concrete (2013) Bulk carrier mooring 50,000 14 4-point TSF-1.5 seismic standard
Kamaishi South Dolphin 39°16’20″N 141°53’40″E Steel pile (2015) Fishing vessel mooring 5,000 7 2-point No bunkering allowed
Central Mooring Dolphin 39°16’30″N 141°53’20″E Concrete caisson Multi-purpose 20,000 10 3-point Emergency mooring only
East Auxiliary Dolphin 39°16’35″N 141°53’25″E Steel jacket Tug mooring 1,000 5 2-point Pilot transfer point

2. Mooring Buoys

Buoy ID Location (Coordinates) Type Max DWT Depth (m) Max LoA (m) Main Use Restrictions Inspection Date
MB-1 39°16’30″N 141°53’15″E Single-point 20,000 12 180 Bulk cargo Tidal window >1.5m 2023-06-15
MB-2 39°16’15″N 141°53’30″E Multi-point 10,000 8 120 General cargo Daylight ops only 2023-05-20
MB-3 39°16’10″N 141°53’50″E Specialty 15,000 9 150 LNG transfer Requires escort tugs 2023-07-10
MB-4 39°16’05″N 141°54’00″E Emergency 5,000 6 100 Standby 72hr max stay 2023-04-05

3. Piers and Wharves

Terminal Name: Kamaishi Iron & Steel Terminal (Operated by Nippon Steel)

Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes SWL (ton) Main Cargo Operational Limits Fire Safety
Berth 1 200 10 30,000 180 Dolphin 2 (gantry) 25 Iron ore, coal Max wind 15m/s Class A
Berth 2 150 8 15,000 150 Quay wall 1 (mobile) 15 Steel products No night ops Class B
Berth 3 180 12 40,000 200 Dolphin 3 (gantry) 30 Bulk minerals Tidal restriction Class A
Berth 4 120 7 10,000 130 Quay wall None Scrap metal Daylight only Class C

Terminal Name: Kamaishi Fishing Port (Iwate Prefecture Managed)

Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes SWL (ton) Main Cargo Facilities Ice Class
Fishing Wharf A 120 5 1,000 80 Pontoon None Fresh fish Ice plant, cold storage IC
Fishing Wharf B 80 4 500 60 Fixed None Fishing vessels Fuel station N/A
Processing Wharf 100 6 2,000 90 Concrete 2 (5t) 5 Fish products Onsite processing IC
Repair Wharf 60 4.5 800 50 Graving dock 1 (3t) 3 Vessel repair Dry dock access N/A

Terminal Name: Kamaishi General Cargo Terminal

Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes SWL (ton) Main Cargo Special Notes Hazard Class
North General 150 9 20,000 160 Quay wall 2 (mobile) 20 Project cargo Heavy lift area Zone 2
South General 120 7 10,000 130 Quay wall 1 (mobile) 10 Breakbulk Warehouse adjacent Zone 3
West General 100 6 5,000 110 Finger pier None Ro-Ro Ramp capacity 50t Zone 3

4. Lighterage Facilities

Facility Name Type Max DWT Depth (m) Location Operational Limits Equipment Barge Capacity
Kamaishi Lighterage Zone Open water 5,000 7 Inner harbor Daylight, fair weather 2 barges (500t) 4 barges max
Offshore Transfer Area Designated zone 10,000 15 2nm NE of port Pilot required Floating cranes 2 barges max
Emergency Lighterage Contingency 3,000 5 West harbor Portmaster approval Mobile cranes 1 barge

5. Additional Port Infrastructure

Facility Type Name/ID Specifications Purpose Restrictions Maintenance Cycle
Breakwater Main Breakwater Length: 850m
Height: 12m
Wave protection No mooring allowed Annual inspection
Navigation Aid Kamaishi Port Light Range: 15nm
Character: Fl(4) 20s
Entrance marking Fog signal available Monthly check
Tug Berth Tug Base 3 berths, 6m depth
24/7 ops
Pilot/tug ops Authorized only Quarterly
Oil Barrier OB-1 to OB-4 400m total length Spill containment Deployable Biannual drill

Critical Safety Notes:

  1. Maximum permissible wave height for operations: 1.5m (2.0m for emergency)
  2. Mandatory VHF channels: Ch 16 (calling), Ch 12 (port ops), Ch 14 (tugs)
  3. Tidal range: 1.2m (mean) to 1.8m (spring) – refer to Japan Coast Guard Tide Tables
  4. Ice conditions: Occasional winter icing (December-February) – anti-icing measures in place
  5. Emergency protocols: Port Disaster Prevention Plan (2022 version) in effect
  6. All mooring equipment certified per OCIMF MEG4 standards