Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Matsuzaka Port

0
159

 

Terminal Name Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes Safe Working Load (SWL) Main Cargo Note
Matsuzaka Oil Terminal T1 230 12.5 50,000 220 Tanker 4×12″ loading arms N/A Crude oil, Fuel oil OCIMF compliant
T2 250 14.0 80,000 240 Tanker 2×16″ loading arms N/A Chemical products Class 1 prohibited
T3 180 11.0 30,000 175 Tanker 2×10″ loading arms N/A Biodiesel Dedicated biofuel
T4 (NEW) 200 12.0 40,000 195 Tanker 3×12″ loading arms N/A LNG (pilot project) Commissioned Q1 2024
Matsuzaka Container Terminal C1 200 10.0 25,000 195 Container 1×Post-Panamax 50t (twin lift: 65t) Containers Reefer plugs: 40
C2 250 12.0 45,000 245 Container 1×Post-Panamax 50t Containers Dangerous goods allowed
C3 250 12.0 45,000 245 Container 1×Post-Panamax 50t Containers Night ops permitted
C4 300 14.0 65,000 295 Container 2×Super-Post-Panamax 70t Containers Commissioned 2023
C5 (NEW) 180 9.5 20,000 175 Container 1×Panamax 40t Feeder vessels Dedicated coastal service
Matsuzaka General Cargo Terminal G1 150 8.0 10,000 145 Multi-purpose 1×25t 25t Steel, Project cargo Open storage: 5,000m²
G2 180 9.0 15,000 175 Multi-purpose 1×25t 25t Bagged cargo Covered storage: 2,000m²
G3 200 10.0 20,000 195 Multi-purpose 1×10t 10t Breakbulk Heavy lift area
G4 220 11.0 25,000 215 Multi-purpose 1×40t 40t Wind turbine parts Dedicated project cargo
G5 (NEW) 240 11.5 30,000 235 Multi-purpose 2×30t 30t Heavy machinery Reinforced pavement
Matsuzaka Bulk Terminal B1 300 11.5 35,000 290 Dry bulk Conveyor system N/A Cement, Grain 500t/hour capacity
B2 250 10.5 25,000 245 Dry bulk Grab unloader 25t Fertilizer Dedicated plant
B3 (NEW) 200 9.5 15,000 195 Dry bulk Pneumatic system N/A Alumina Dust suppression system
Matsuzaka Bunker Terminal BK1 150 9.5 8,000 145 Bunkering 2×8″ loading arms N/A Fuel oil, MGO 24hr notice required
Matsuzaka Passenger Terminal P1 150 8.0 5,000 140 Passenger N/A N/A Cruise, Ferry Customs facilities
P2 180 9.0 7,000 175 Passenger N/A N/A International ferry Commissioned 2024
P3 (NEW) 120 6.5 3,000 115 Passenger N/A N/A Domestic ferry High-speed craft only
Port Dolphins
Oil Terminal Dolphin D1 N/A 14.0 N/A N/A Mooring N/A N/A N/A 4-point mooring
Container Terminal Dolphin D2 N/A 12.0 N/A N/A Mooring N/A N/A N/A Breasting dolphin
Chemical Terminal Dolphin D3 N/A 13.0 N/A N/A Mooring N/A N/A N/A HDPE construction
LNG Terminal Dolphin (NEW) D4 N/A 15.0 N/A N/A Mooring N/A N/A N/A Explosion-proof design
Mooring Buoys
Outer Harbor Buoy MB1 N/A 15.0 30,000 N/A Mooring N/A N/A N/A Emergency use only
Waiting Area Buoy MB2 N/A 12.0 20,000 N/A Mooring N/A N/A N/A 72hr max stay
Bunkering Buoy (NEW) MB3 N/A 13.5 25,000 N/A Mooring N/A N/A N/A Dedicated fuel transfer
Lighterage Facilities
Lighterage Area LA1 200 6.0 3,000 N/A Barge N/A N/A General cargo Daylight ops only
Barge Transfer Zone LA2 150 5.5 2,000 N/A Barge N/A N/A Construction materials Restricted area
Emergency Lighterage Point (NEW) LA3 100 7.0 5,000 N/A Barge N/A N/A Emergency use Priority access
Wharves
Fisheries Wharf FW1 120 5.0 500 N/A Fishery N/A N/A Fish products Local vessels only
Coast Guard Wharf FW2 100 6.0 1,000 N/A Official N/A N/A N/A Restricted access
Research Vessel Wharf (NEW) FW3 80 4.5 300 N/A Scientific N/A N/A N/A University access only

Technical Specifications:
1. Depth Measurements:
– All depths to Lowest Astronomical Tide (LAT)
– Verified by 2024 hydrographic survey (JHA Chart No. 1234)
2. Load Capacities:
– DWT based on summer load line (tropical for tankers)
– SWL certified by ClassNK (annual inspection)
3. Mooring Equipment:
– Bollards: 100t breaking load
– Quick release hooks: 75t safe working load
4. Navigation:
– Leading lights: 182°T ±1°
– Sector lights: White 178°-186°

Safety Critical Updates:
1. Maximum Operational Conditions:
– Container ops: Wind 14m/s (Beaufort 6)
– Tanker ops: Wind 10m/s (berthing), 12m/s (operations)
– Bulk ops: Wind 15m/s (Beaufort 7)
– Passenger ops: Wave height 1.0m
2. Emergency Systems:
– ESD1/ESD2 systems at all liquid berths
– Foam firefighting systems (5000L/min)
– Oil spill response equipment (800m boom)
3. Restricted Areas:
– LNG terminal: 200m exclusion zone
– Bunkering operations: 50m no-smoking zone

Operational Updates:
1. New Requirements:
– LNG carriers: 72hr pre-arrival notice
– Wind turbine cargo: 96hr planning notice
– Night navigation: Pilot compulsory
2. Daylight Restrictions:
– First-time vessels
– Heavy lifts >75t
– Dangerous goods transfer

New Additions:
1. Facilities:
– LNG Terminal (T4)
– Feeder vessel berth (C5)
– Heavy machinery berth (G5)
– Alumina bulk terminal (B3)
– Domestic ferry terminal (P3)
– Research vessel wharf (FW3)
2. Safety Systems:
– LNG exclusion zones
– Enhanced ESD protocols
– New oil spill equipment
3. Operational:
– LNG carrier procedures
– Wind turbine handling
– Night navigation rules