Port Dolphins
| Terminal Name | Dolphin Name | Depth (m) | DWT Capacity | Max LoA (m) | Main Cargo | Note |
|---|---|---|---|---|---|---|
| Oita Port Dolphin | Dolphin No.1 | 15 | 100,000 | 250 | Crude Oil, LNG | Primary tanker mooring (Certified to ISO 9001:2015) |
| Oita Port Dolphin | Dolphin No.2 | 12 | 50,000 | 200 | Chemicals, Petroleum | Secondary mooring (IMO Class C) |
| Oita Port Dolphin | Dolphin No.3 | 18 | 150,000 | 280 | LNG | Added per 2023 expansion (IGF Code compliant) |
| Oita Port Dolphin | Dolphin No.4 | 16 | 120,000 | 260 | LPG, Chemical | New installation (2024 Q2) |
Mooring Buoys
| Terminal Name | Buoy Name | Depth (m) | DWT Capacity | Max LoA (m) | Main Cargo | Note |
|---|---|---|---|---|---|---|
| Oita Port Mooring Buoy | Buoy A | 20 | 150,000 | 300 | Crude Oil | OCIMF MEG4 compliant |
| Oita Port Mooring Buoy | Buoy B | 18 | 120,000 | 280 | LNG | With vapor recovery system |
| Oita Port Mooring Buoy | Buoy C | 15 | 80,000 | 250 | Chemical Products | Hazard class 1 certified |
| Oita Port Mooring Buoy | Buoy D | 22 | 200,000 | 330 | VLCC Operations | Commissioned 2024 (DNV certified) |
Piers
| Terminal Name | Pier Name | Length (m) | Depth (m) | DWT Capacity | Max LoA (m) | Berth Type | Shore Cranes | Safe Working Load (SWL) | Main Cargo | Note |
|---|---|---|---|---|---|---|---|---|---|---|
| Oita Port Pier | Pier No.1 | 300 | 12 | 50,000 | 200 | General Cargo | 2 | 30 tons | Containers, Bulk | ISO 28000 security certified |
| Oita Port Pier | Pier No.2 | 250 | 10 | 30,000 | 180 | General Cargo | 1 | 20 tons | Bulk, Breakbulk | Bollard pull 60t |
| Oita Port Pier | Pier No.3 | 350 | 14 | 70,000 | 230 | Container | 4 | 50 tons | Containers | Post-Panamax capability |
| Oita Port Pier | Pier No.4 | 280 | 13 | 60,000 | 220 | Multi-purpose | 3 | 40 tons | Project Cargo | Heavy lift specialist |
Berths
| Terminal Name | Berth Name | Length (m) | Depth (m) | DWT Capacity | Max LoA (m) | Berth Type | Shore Cranes | Safe Working Load (SWL) | Main Cargo | Note |
|---|---|---|---|---|---|---|---|---|---|---|
| Oita Port Berth | Berth No.1 | 200 | 14 | 80,000 | 250 | Container | 3 | 50 tons | Containers | STS crane compatible |
| Oita Port Berth | Berth No.2 | 180 | 12 | 60,000 | 220 | Bulk | 2 | 40 tons | Coal, Iron Ore | Continuous unloader system |
| Oita Port Berth | Berth No.3 | 220 | 15 | 100,000 | 270 | Liquid Bulk | 0 | N/A | LNG, LPG | Cryogenic arms (4x) |
| Oita Port Berth | Berth No.4 | 150 | 9 | 20,000 | 160 | Ro-Ro | 1 | 25 tons | Vehicles, Machinery | 500 vehicle/hour capacity |
| Oita Port Berth | Berth No.5 | 170 | 11 | 40,000 | 190 | Passenger | 0 | N/A | Cruise Ships | Gangway compatible |
Lighterages
| Terminal Name | Lighterage Name | Length (m) | Depth (m) | DWT Capacity | Max LoA (m) | Berth Type | Shore Cranes | Safe Working Load (SWL) | Main Cargo | Note |
|---|---|---|---|---|---|---|---|---|---|---|
| Oita Port Lighterage | Lighterage No.1 | 150 | 8 | 10,000 | 150 | General Cargo | 1 | 15 tons | Breakbulk, Project Cargo | Daylight operations only |
| Oita Port Lighterage | Lighterage No.2 | 120 | 6 | 5,000 | 120 | General Cargo | 0 | N/A | Coastal cargo | Max beam 22m |
| Oita Port Lighterage | Lighterage No.3 | 100 | 5 | 3,000 | 100 | Barge | 0 | N/A | Construction Materials | Tidal restrictions apply |
Wharves
| Terminal Name | Wharf Name | Length (m) | Depth (m) | DWT Capacity | Max LoA (m) | Berth Type | Shore Cranes | Safe Working Load (SWL) | Main Cargo | Note |
|---|---|---|---|---|---|---|---|---|---|---|
| Oita Port Wharf | Wharf No.1 | 250 | 10 | 40,000 | 200 | General Cargo | 2 | 25 tons | Bulk, Containers | 24/7 operations |
| Oita Port Wharf | Wharf No.2 | 200 | 9 | 30,000 | 180 | General Cargo | 1 | 20 tons | Breakbulk, Ro-Ro | Dangerous goods permitted |
| Oita Port Wharf | Wharf No.3 | 180 | 8 | 25,000 | 170 | Fishing | 0 | N/A | Fishery Products | Cold storage available |
| Oita Port Wharf | Wharf No.4 | 220 | 11 | 45,000 | 210 | Ship Repair | 2 | 30 tons | NA | Dry dock access |
Operational Safety Notes:
- Maximum permissible wind speed for operations: 15m/s (Beaufort 7)
- Tidal range: 2.8m (neap) to 4.2m (spring) – All depths at MHWS
- Mandatory VHF channels: Ch 12 (Port Ops), Ch 16 (Emergency)
- All oil/LNG berths equipped with emergency shutdown systems (ESD)
- Port security level permanently maintained at ISPS Level 1