Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Sakai Port

0
152

Port Dolphins at Sakai Port

Dolphin Name Location (WGS84) Construction Function Fender Type Load Capacity Last Inspection Note
North Breakwater Dolphin 34°34’12″N 135°27’36″E Reinforced concrete Mooring assistance D-cell 1000x2000mm 200t lateral 2024-01-15 Built 2015, cathodic protection installed
South Channel Dolphin 34°33’54″N 135°27’42″E Steel pile cluster Tanker mooring Conical 1500mm 150t breasting 2024-02-20 Equipped with quick-release hooks, fog light
East Approach Dolphin 34°34’06″N 135°28’12″E Concrete caisson Navigation aid Rubber block 50t impact 2023-11-30 Radar reflector installed, RACON signal ‘M’
West Anchorage Dolphin 34°34’24″N 135°26’48″E Steel jacket Emergency mooring Cellulose-fiber 100t multi-directional 2024-03-10 Strobe light, AIS transmitter JP100234

Mooring Buoys at Sakai Port

Buoy ID Position Type Max Vessel Size SWL (tonnes) Chain Scope Main Purpose Light Characteristic Last Inspection
MB-1 34°34’18″N 135°27’24″E Single-point mooring 50,000 DWT 150 3:1 at 25m depth Liquid bulk transfer Fl Y 5s 2024-03-15
MB-2 34°33’48″N 135°27’30″E Multi-point mooring 30,000 DWT 100 4-leg spread General cargo standby Q R 2024-02-28
MB-3 34°34’30″N 135°27’00″E Emergency mooring 20,000 DWT 75 5:1 at 18m Storm contingency Fl(3)G 10s 2023-11-20
MB-4 34°33’36″N 135°28’12″E Yoke mooring 15,000 DWT 60 2:1 at 12m Bunkering Fl R 4s 2024-04-05

Piers and Wharves at Sakai Port

Terminal Name Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Max Beam (m) Berth Type Shore Cranes SWL (tonnes) Main Cargo Operational Restrictions Firefighting Note
Sakai Central Terminal CT-1 200 10.5 30,000 180 32 General cargo 2 x 25t 25 Steel products, machinery No night ops (22:00-06:00) Foam monitors x2 Ro-Ro ramp available
CT-2 180 12.0 45,000 200 35 Multi-purpose 1 x 40t 40 Containers, project cargo Hazardous cargo limited Dry chemical x4 Reefer connections x20
CT-3 150 9.0 15,000 150 28 Coastal trade Domestic cargo Daylight ops only Water hydrants x3 No gantry cranes
CT-4 220 11.5 35,000 190 32 Breakbulk 3 x 15t 15 Timber, paper rolls Max beam 32m CO2 system New in 2022
CT-5 170 10.0 25,000 160 30 Ro-Ro 1 x 30t 30 Wheeled equipment Max ramp slope 8° Foam trolleys x2 Straddle carrier access
Sakai Liquid Terminal LT-1 250 14.0 80,000 230 42 Tanker berth Crude oil, chemicals Class 1 DG only Water curtain system Vapor recovery, 16″ arms
LT-2 200 12.5 50,000 210 38 Tanker berth LPG, LNG No simultaneous ops Deluge system Cryogenic arms x3, -162°C
LT-3 180 10.0 25,000 170 32 Bunker station Fuel oil, MGO No crude transfer Foam station 24hr ops, 8″ lines
LT-4 160 9.5 15,000 150 28 Chemical berth Edible oils, solvents No pyrophoric materials Dike containment Stainless steel piping
Sakai Bulk Terminal BT-1 300 15.0 100,000 280 45 Dry bulk 2 x grab cranes 35 Coal, iron ore Dust suppression required Dust monitors Conveyor to storage, 2000t/hr
BT-2 240 13.5 60,000 250 38 Agricultural bulk 1 x 20t 20 Grain, fertilizer Explosion-proof lighting Spark arrestors Covered storage 50,000m³
BT-3 200 12.0 40,000 220 35 Mineral bulk 1 x 25t 25 Cement, gypsum No simultaneous loading Silica monitors Pneumatic system
Sakai Ferry Terminal FT-1 120 8.0 10,000 130 25 Passenger/Ro-Ro Vehicles, passengers Max 500 passengers Life rafts x6 Links to Seto Inland Sea
Sakai Container Terminal CY-1 350 16.0 120,000 320 48 Container 3 x STS cranes 50 ISO containers Max stack height 5 Foam cannons x4 On-dock rail, 6 tracks
CY-2 280 14.5 80,000 300 42 Feeder 2 x STS cranes 40 Regional containers No OOG cargo Hydrant system Reefer plugs x100

Lighterage Facilities

Facility Name Type Location Max Barge Size Handling Capacity Tidal Window Main Use Safety Equipment Note
North Lighterage Area Floating platform 34°34’42″N 135°27’18″E 1,500 DWT 500t/day ±2hr HW Coastal distribution Life rings x4, fire extinguishers x2 Concrete deck
South Lighterage Point Beach landing 34°33’30″N 135°27’54″E 800 DWT 300t/day +1hr HW Construction materials First aid station Gravel surface
West Floating Dock Pontoon system 34°34’12″N 135°26’36″E 2,000 DWT 700t/day All tides Project cargo Emergency lighting 100m² work area
East Barge Terminal Dolphin mooring 34°34’24″N 135°28’30″E 1,200 DWT 400t/day -1hr LW Scrap metal Magnetic separator Electrically grounded

Operational Notes

  • All depths refer to Chart Datum (CD) with tidal range of 2.8m (MHWS) to 0.3m (MLWS)
  • Daytime operations defined as sunrise+1hr to sunset-1hr (local JMA publications)
  • Hazardous cargo operations require 24hr advance notice via JP-SWAN system
  • Maximum permissible wind speed: 15m/s for container ops, 12m/s for bulk ops
  • Real-time port information available via Sakai VTS on VHF Ch.12/16 (156.600 MHz)
  • Port security level currently MARSEC Level 1 (as of 2024-06-20)