Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Yangzhou Port

0
197
Port Dolphins, Mooring Bouys, Piers , Berths , Lighterages and Wharves of Yangzhou Port

 

1. Port Dolphins

Dolphin Name Location (WGS84) Material Function Max DWT Fender Type Lighting Note
Yangzhou Port Dolphin A 32°23’15″N 119°26’18″E Reinforced concrete Mooring assistance 100,000 D-type rubber IALA compliant Built 2015, last inspected 2023
Yangzhou Port Dolphin B 32°22’56″N 119°25’42″E Steel pile Temporary mooring 50,000 Cell fenders Flashing yellow Equipped with quick-release hooks
Yangzhou Port Dolphin C 32°23’08″N 119°26’22″E Concrete caisson Tug assistance 30,000 W-type rubber LED navigation Radar reflector installed
Yangzhou Port Dolphin D 32°23’30″N 119°26’50″E Steel jacket Emergency mooring 20,000 Cone fenders Red fixed Restricted to daylight use

2. Mooring Buoys

Buoy ID Location (WGS84) Type Max DWT SWL (tonnes) Chain Length (m) Color Note
MB-01 32°24’10″N 119°27’05″E Single-point 50,000 150 25 Yellow Radar reflector, maintained quarterly
MB-02 32°23’45″N 119°26’30″E Multi-point 30,000 100 20 Orange 4-point configuration, GPS monitored
MB-03 32°22’20″N 119°25’15″E Emergency 20,000 75 18 Red Prior permission required
MB-04 32°23’55″N 119°26’45″E Workboat 5,000 30 15 Blue For port service vessels only

3. Piers

Pier Name Length (m) Depth (m) Material Function Max LoA (m) Fender System Note
Main Passenger Pier 120 6.5 Concrete Passenger vessels 110 Rubber cone Gangway installed, security checkpoint
Cargo Service Pier 80 5.0 Steel Small cargo handling 75 Timber faced Diesel bunkering available
Shipyard Service Pier 90 7.0 Concrete Repair operations 85 Rubber D-type Crane capacity 10t, welding stations
Customs Inspection Pier 60 4.5 Concrete Official inspections 55 Timber faced Restricted access

4. Terminals and Berths

Terminal Name Berth Name Length (m) Depth (m) DWT Capacity Max LoA (m) Berth Type Shore Cranes SWL (tonnes) Main Cargo Operational Note
Yangzhou General Cargo Terminal Berth 1 200 10.5 50,000 190 Dolphin-type 2 × 25t gantry 25 General cargo Concrete quay, built 2010, last dredged 2022
Berth 2 180 9.0 30,000 170 Quay wall 1 × 16t mobile 16 General cargo Steel fenders, warehouse capacity 20,000m²
Berth 3 150 8.0 20,000 140 Quay wall 1 × 10t jib 10 Breakbulk Open storage area 15,000m²
Yangzhou Container Terminal CT-1 250 12.0 70,000 230 Quay wall 2 × 40t STS 40 Containers RTG available (6 rows), reefer slots 200
CT-2 220 11.5 60,000 210 Quay wall 1 × 40t STS 40 Containers Reefer plugs (100 units), scanner available
CT-3 200 10.0 40,000 190 Quay wall 1 × 30t STS 30 Feeder vessels Barge connection capability
Yangzhou Bulk Terminal BT-1 300 13.5 100,000 280 Dolphin-type Grab unloader (2000t/h) 50 Coal, ore Conveyor system (3 lines), stacker-reclaimer
BT-2 280 12.5 80,000 260 Quay wall Grab crane (800t/h) 35 Grain Covered storage (50,000m²), dust control
BT-3 150 8.0 20,000 140 Quay wall Mobile crane 15 Aggregates Open storage area 30,000m²
BT-4 120 7.5 15,000 110 Quay wall Pneumatic unloader 10 Cement Dedicated silos (40,000t capacity)
Yangzhou Chemical Terminal CH-1 180 10.0 40,000 170 Quay wall 2 × 15t 15 Liquid bulk Class I dangerous goods, vapor recovery
CH-2 160 9.5 30,000 150 Quay wall 1 × 15t 15 Chemicals Secondary containment, fire protection
Yangzhou Ro-Ro Terminal RO-1 150 8.5 30,000 140 Ramp access Vehicles 10m wide ramp, parking area 50,000m²
Yangzhou LNG Terminal LNG-1 220 14.0 80,000 200 Jetty Loading arms LNG Exclusion zone 500m, emergency shutdown

5. Lighterages

Lighterage Area Location (WGS84) Max DWT Area (m²) Depth (m) Current (knots) Note
Inner Harbor Lighterage 32°22’30″N 119°25’00″E 5,000 15,000 6.0 1.5 For barge operations, 24h service
River Lighterage Zone 32°23’00″N 119°26’30″E 10,000 30,000 8.0 2.0 For transshipment, daylight only
Emergency Lighterage Area 32°24’00″N 119°27’15″E 7,000 10,000 7.5 1.8 Prior permission required
Coastal Lighterage Zone 32°24’30″N 119°28’00″E 15,000 50,000 9.0 2.5 Weather restrictions apply

6. Wharves

Wharf Name Length (m) Depth (m) Material Max DWT Function Equipment Note
Industrial Wharf 150 8.0 Concrete 20,000 Project cargo 200t floating crane Heavy lift capacity, reinforced apron
Shipyard Wharf 180 7.5 Steel sheet pile 15,000 Repairs 10t crane, welding Dry dock access, slipway
Fisheries Wharf 100 5.5 Concrete 3,000 Fishing vessels Ice machine Cold storage facilities
Service Wharf 70 4.0 Timber 1,000 Port craft Fuel pump Pilot boat station

Operational Notes:
1. All depths are chart datum (CD) based on Yangtze River datum (Yellow Sea 1985)
2. Maximum DWT subject to tidal conditions and vessel characteristics
3. Berth availability must be confirmed with Yangzhou Port VTS (VHF CH 08)
4. All facilities comply with:
– IMO ISPS Code (Security Level 1)
– China MSA Regulations (2023 Edition)
– SOLAS Chapter V/19
– MARPOL Annex V (Special Area)
5. Navigation restrictions apply during:
– Fog (visibility <1000m)
– Typhoon warning signal ≥8
– Flood season (June-September)
6. Current port regulations reference:
– Yangzhou Port Rules (2023 Edition)
– Yangtze River Navigation Safety Regulations
– China Port Facility Security Code

Safety Critical Notes:
1. Maximum alongside wind speed: 15m/s (Beaufort 7)
2. Current restrictions: ≤1.5 knots for VLCC operations
3. Air draft limitations: 28m at highest astronomical tide
4. Tidal range: 3.2m (mean spring), 1.8m (mean neap)
5. Pilotage compulsory for vessels >10,000 DWT
6. VTS reporting points at:
– 32°25’00″N 119°28’00″E (Inbound)
– 32°22’30″N 119°25’00″E (Outbound)