1. Port Overview
Soma Port is a key regional port in Fukushima Prefecture, Japan, designated as a “Major Port” under the Port and Harbor Law (Law No. 218 of 1950). It serves as a hub for coal imports, fishing, and disaster relief operations. The port is managed by Soma Port Authority under the jurisdiction of the Japanese Ministry of Land, Infrastructure, Transport and Tourism (MLIT).
2. Legal Framework
2.1 Domestic Laws:
– Port and Harbor Law (Law No. 218 of 1950)
– Marine Pollution Prevention Law (Law No. 136 of 1970)
– Ship Safety Act (Law No. 11 of 1933)
2.2 International Conventions:
– SOLAS 1974 (as amended)
– MARPOL 73/78
– ISPS Code (2004)
3. Navigation Rules
3.1 Vessel Traffic Service (VTS):
Mandatory for vessels >300 GT. Monitoring frequency: 156.8 MHz (VHF Ch16).
3.2 Speed Limits:
– Inner harbor: 5 knots
– Approach channels: 8 knots
3.3 Restricted Areas:
Fishing zones marked by buoys (coordinates: 37°47’N, 140°57’E to 37°45’N, 140°59’E).
4. Port Entry Requirements
4.1 Pre-arrival Notification:
– 72 hours prior notice for foreign vessels (via JP-MICS system)
– ISPS Level 1 security declaration required
4.2 Documents:
– Certificate of Registry
– P&I Insurance Certificate
– Garbage Management Plan
5. Cargo Operations
5.1 Dangerous Goods:
Class 1-9 materials require separate storage approval (MLIT Form P-19).
5.2 Coal Handling:
Dust suppression measures mandatory (water spray system ≥50L/min).
6. Safety Regulations
6.1 Personal Protective Equipment (PPE):
– Hard hats (JIS T 8131 standard)
– Life jackets (ISO 12402-3) for all dock workers
6.2 Emergency Equipment:
– Fire hydrants every 50m (JIS B 8410)
– Oil spill kits at all berths (capacity ≥200L)
7. Environmental Compliance
7.1 Discharge Restrictions:
– Zero discharge of bilge water within 12nm
– Sewage discharge prohibited (MARPOL Annex IV)
7.2 Air Emissions:
SOx limit 0.1% (ECA compliance required)
8. Enforcement Measures
8.1 Inspection Authority:
Japan Coast Guard (JCG) and MLIT conduct random inspections (annual rate: 23%).
8.2 Penalties:
– Fine up to ¥3M for MARPOL violations
– Port entry ban for repeated ISPS breaches
9. Crew Welfare
9.1 Shore Leave:
Permitted with valid seafarer’s ID (IMO 185 convention).
9.2 Medical Facilities:
Soma City Hospital (24/7 emergency, 5km from port) handles maritime cases.
10. Weather Restrictions
Port closure when:
– Wave height >3m (typhoon conditions)
– Visibility <500m
Real-time updates via JMA Weather Warnings (Frequency: 162.55 MHz).
11. Anchorage Regulations
11.1 Designated Anchorage Areas:
– No.1 Anchorage: 37°46.5’N, 140°58.0’E (Depth: 15-20m)
– No.2 Anchorage: 37°45.8’N, 140°59.2’E (Depth: 10-15m)
11.2 Holding Requirements:
– Minimum 3:1 scope for all anchors
– VHF Ch14 monitoring mandatory during anchorage
12. Bunkering Procedures
12.1 Fuel Quality:
– Sulphur content ≤0.1% (ECA compliance)
– Bunker Delivery Note must include batch number
12.2 Safety Measures:
– Double hose connection required
– Fire extinguishers (40kg dry powder) within 10m
13. Waste Management
13.1 Reception Facilities:
– Solid waste: 20-ton capacity compactor (operates 0800-1700)
– Oily waste: 50m³ storage tank (advance notice required)
13.2 Discharge Records:
– Garbage Record Book must be stamped by port officer
– Incorrect entries may incur ¥500,000 fine
14. Mooring Requirements
14.1 Line Specifications:
– Minimum breaking strength: 120% of ship’s GT
– Synthetic ropes prohibited for vessels >10,000 DWT
14.2 Tidal Considerations:
– Spring tide range: 1.8m (neap tide 0.9m)
– Mooring lines must be adjusted every 2 hours during tide change
15. Pilotage Services
15.1 Compulsory Areas:
– All vessels >500 GT in inner harbor
– Tankers regardless of size
15.2 Booking Procedure:
– Minimum 24-hour notice via JP-HarborNet
– Pilot boarding point: 37°47.2’N, 140°56.8’E
16. Port State Control
16.1 Inspection Criteria:
– Priority inspection for vessels >15 years old
– Concentrated Inspection Campaigns (CIC) conducted biannually
16.2 Deficiency Codes:
– 30-day rectification period for minor deficiencies
– Immediate detention for critical safety items
17. Ship Repair Services
17.1 Available Facilities:
– Floating dock capacity: 8,000 DWT
– Hull cleaning permitted with prior environmental approval
17.2 Emergency Repairs:
– 24/7 welding and mechanical services
– Maximum 72-hour repair period without special permit
18. Security Measures
18.1 Restricted Zones:
– All cargo terminals require RFID access control
– 500m exclusion zone around LNG berths
18.2 Surveillance:
– Thermal cameras cover 100% of port perimeter
– Random baggage checks at all gates
19. Tugboat Assistance
19.1 Minimum Requirements:
– Vessels >150m LOA: 2 tugboats minimum
– Bollard pull ≥60 tons for Panamax vessels
19.2 Emergency Standby:
– 1 tugboat always on 30-minute readiness
– Response time guarantee: 15 minutes
20. Port Dues and Charges
20.1 Calculation Basis:
– Gross Tonnage × 0.0025 (minimum ¥50,000)
– Environmental incentive: 15% discount for LNG-fueled vessels
20.2 Payment Methods:
– Electronic transfer only (no cash accepted)
– Late payment penalty: 1.5% per month
21. Hazardous Materials Handling
21.1 Storage Requirements:
– Class 1 explosives: Minimum 500m from other facilities
– Toxic gases: Double-contained storage with gas detection systems
21.2 Transfer Procedures:
– Bonding and grounding mandatory for flammable liquids
– Continuous VOC monitoring during transfers
22. Ice Navigation (Winter Operations)
22.1 Ice Conditions:
– Average ice thickness: 15cm (January-February)
– Icebreaker assistance available upon request
22.2 Special Requirements:
– Bow thrusters mandatory for vessels >10,000 GT
– Engine pre-heating systems required below -5°C
23. Crew Change Procedures
23.1 Documentation:
– Seafarer’s identity document (original required)
– Negative PCR test within 72 hours of arrival
23.2 Transportation:
– Designated crew vans with disinfection protocols
– Direct transit to/from airport without stops
24. Port Emergency Response
24.1 Oil Spill Capacity:
– Tier 1 response equipment (500m³ containment)
– Dispersant use requires pre-approval
24.2 Firefighting Resources:
– 2 fireboats with 10,000L/min capacity
– Foam stocks for 2 simultaneous tanker fires
25. Customs Procedures
25.1 Clearance Timeline:
– Standard clearance: 4 working hours
– Express service (2 hours) available for premium fee
25.2 Prohibited Items:
– Certain agricultural products without phytosanitary certificates
– Counterfeit goods (immediate seizure policy)
26. Port Communication Protocols
26.1 Radio Channels:
– Primary: VHF Ch 16 (distress)
– Secondary: VHF Ch 12 (port operations)
26.2 Language Requirements:
– English mandatory for all vessel communications
– Japanese pilots available for local language assistance
27. Ballast Water Management
27.1 Exchange Requirements:
– Minimum 200nm from nearest land
– 95% volumetric exchange standard
27.2 Treatment Systems:
– USCG/IMO Type Approved systems only
– Sampling and analysis may be conducted during PSC
28. Port Infrastructure Specifications
28.1 Berth Dimensions:
– Main coal terminal: 300m LOA, -15m CD
– General cargo: 200m LOA, -10m CD
28.2 Load Limits:
– Maximum crane capacity: 50 tons (single lift)
– Deck load limit: 5 tons/m² (containers)
29. Ship Supply Services
29.1 Provisions:
– 24-hour delivery with 6-hour notice
– Halal/Kosher options available
29.2 Technical Stores:
– Limited marine parts inventory
– Emergency air freight arrangements possible
30. Special Cargo Considerations
30.1 Oversized Loads:
– Advance notice: 7 days for >100 ton units
– Special daylight movement restrictions apply
30.2 Project Cargo:
– Engineering review required for non-standard lifts
– Mandatory third-party insurance coverage
31. Vessel Traffic Management System (VTMS)
31.1 Coverage Area:
– 15nm radius from port entrance buoy
– Radar update frequency: every 3 seconds
31.2 Reporting Points:
– Waypoint SOMA1: 37°50’N, 140°55’E (12nm out)
– Waypoint SOMA2: 37°48’N, 140°57’E (5nm out)
32. Port Labor Regulations
32.1 Working Hours:
– Standard shift: 0800-1700 (1 hour break)
– Overtime rates apply after 8 hours/day
32.2 Union Requirements:
– All stevedores must be Japan Harbor Transport Association members
– Minimum 3 workers per gang for general cargo
33. Dangerous Weather Protocols
33.1 Typhoon Preparedness:
– Stage 1 alert: winds >15m/s (secure loose gear)
– Stage 2 alert: winds >25m/s (cease all operations)
33.2 Tsunami Response:
– Immediate evacuation when warning issued
– Designated assembly points marked every 200m
34. Port Lighting Requirements
34.1 Night Operations:
– Minimum 200 lux at all working areas
– Red obstruction lights on cranes >50m height
34.2 Emergency Lighting:
– 1 hour minimum backup power for escape routes
– Photoluminescent markings on all stairways
35. Ship Chandler Services
35.1 Bonded Stores:
– 24/7 delivery with customs escort
– Alcohol allowance: 1L per crew member/month
35.2 Waste Disposal:
– Medical waste incineration available (¥5,000/20kg)
– Battery recycling mandatory (no landfill option)
36. Port Entry Restrictions
36.1 Vessel Age Limits:
– 25 years maximum for oil tankers
– 30 years maximum for bulk carriers (special inspection required)
36.2 Special Cases:
– Nuclear-powered vessels require 90-day prior notice
– Research vessels need environmental impact statement
37. Cargo Securing Standards
37.1 Container Stowage:
– Twist lock inspection before loading
– Maximum stack weight: 150 tons per 20′ slot
37.2 Bulk Cargo:
– Grain trimming certificate required
– Coal surface moisture limit: 10% by weight
38. Port Health Services
38.1 Medical Inspection:
– Free initial health screening for all crew
– Yellow fever vaccination check for relevant itineraries
38.2 Quarantine Procedures:
– 48-hour isolation for vessels with communicable diseases
– Rat guards mandatory on all mooring lines
39. Salvage and Wreck Removal
39.1 Local Resources:
– 500-ton floating crane available
– Maximum diving depth: 40m
39.2 Liability:
– Wreck removal bond required for vessels >500 GT
– Daily pollution fine: ¥1 million until removal complete
40. Port Performance Indicators
40.1 Service Standards:
– Average berth occupancy: 68% (2023 data)
– Cargo handling rate: 25 containers/hour (gantry cranes)
40.2 Incident Statistics:
– 0.17 accidents per 1,000 vessel calls (5-year average)
– 98.3% PSC inspection pass rate (2022-2023)
41. Port Laytime Regulations
41.1 Demurrage Calculation:
– Free time: 72 hours for general cargo
– Demurrage rate: ¥150,000 per day thereafter
41.2 Dispatch Rates:
– Half demurrage rate for early departure
– Minimum 6-hour notice for dispatch calculation
42. Fresh Water Supply
42.1 Quality Standards:
– Meets WHO drinking water guidelines
– Chlorine residual: 0.2-0.5 mg/L
42.2 Supply Capacity:
– Maximum flow rate: 50 tons/hour
– Advance booking required for >100 tons
43. Port Security Levels
43.1 ISPS Implementation:
– Level 1: Standard (90% of time)
– Level 2: Enhanced (during special events)
43.2 Access Control:
– Biometric verification for all port workers
– Vehicle inspection for all landside deliveries
44. Marine Fuel Availability
44.1 Fuel Types:
– MGO (0.1% sulfur)
– LNG (by special arrangement)
44.2 Bunkering Locations:
– Dedicated fuel pier (Berth 7)
– No simultaneous ops during bunkering
45. Port Meteorological Services
45.1 Weather Reporting:
– Hourly updates from port weather station
– Storm warnings issued via VHF Ch 16
45.2 Tide Information:
– Real-time tide gauges at all berths
– Predicted tides published monthly
46. Vessel Maintenance Rules
46.1 Underwater Cleaning:
– Approved contractors only
– Anti-fouling waste must be contained
46.2 Hot Work Permits:
– Valid for 8 hours maximum
– Fire watch required for 3 hours post-work
47. Port Insurance Requirements
47.1 Minimum Coverage:
– ¥500 million P&I for vessels >10,000 GT
– ¥100 million pollution liability
47.2 Local Providers:
– 3 approved marine insurers
– Certificates must be in English/Japanese
48. Fishing Vessel Regulations
48.1 Special Berthing:
– Designated fishing wharf (North Basin)
– Ice machine capacity: 20 tons/day
48.2 Catch Handling:
– Immediate cold storage required
– Fish waste disposal: special containers
49. Passenger Ship Handling
49.1 Facility Requirements:
– Dedicated gangways with handrails
– Wheelchair access at all terminals
49.2 Emergency Drills:
– Mandatory within 12 hours of arrival
– Port authorities may observe
50. Port Environmental Monitoring
50.1 Water Quality:
– Weekly sampling at 5 locations
– Oil content limit: 5 ppm
50.2 Air Quality:
– Continuous PM2.5 monitoring
– Stack testing for vessels >400 GT
51. Dangerous Cargo Documentation
51.1 Required Forms:
– IMDG Declaration (original + 2 copies)
– Emergency Response Plan for Class 1-3 cargoes
51.2 Special Permits:
– Night transport requires additional approval
– Temperature-controlled cargoes need continuous monitoring logs
52. Port Noise Regulations
52.1 Operational Limits:
– Daytime (0700-2200): 75 dB(A) at property line
– Nighttime: 60 dB(A) maximum
52.2 Vessel Restrictions:
– No horn signals within inner harbor
– Engine tests limited to 1 hour duration
53. Navigation Aid Maintenance
53.1 Light Characteristics:
– Port entrance light: Fl(3)G 15s 18m 10M
– Channel markers: IALA Region A system
53.2 Reporting Procedures:
– Malfunction reports must be filed within 2 hours
– Temporary replacements installed within 24 hours
54. Port Fire Prevention
54.1 Equipment Standards:
– Foam systems tested quarterly
– Fire mains pressure: minimum 7 bar
54.2 Training Requirements:
– Monthly drills for port firefighters
– Annual certification for hazardous material responders
55. Vessel Dimension Limits
55.1 Maximum Sizes:
– LOA: 280m (coal berth)
– Beam: 45m (inner channel)
55.2 Air Draft:
– 35m clearance at high tide
– Special notice required for >30m air draft
56. Port Tariff Structure
56.1 Basic Charges:
– Berth fee: ¥8,000 per 100 GT/day
– Pilotage: ¥25,000 per movement
56.2 Discounts Available:
– 10% for regular callers (>12 visits/year)
– 5% for eco-friendly vessels (EEOI <2.0g/ton-mile)
57. Dredging Operations
57.1 Schedule:
– Annual maintenance dredging (March-April)
– Capital dredging requires 6-month notice
57.2 Disposal Sites:
– Designated offshore area (12nm NE of port)
– Contaminated sediment goes to special landfill
58. Port Community System
58.1 Electronic Submission:
– Cargo manifests via JP-CARGO system
– Crew lists through e-Crew platform
58.2 Data Requirements:
– All documents in XML format
– 24/7 system availability (99.9% uptime)
59. Specialized Cargo Handling
59.1 Heavy Lift Procedures:
– Engineering survey for >100 ton units
– Load spread mats required for >5 ton/m²
59.2 Temperature-Sensitive Goods:
– Real-time monitoring for pharmaceuticals
– Backup generators for reefer storage
60. Port Incident Reporting
60.1 Timeframes:
– Immediate for spills/injuries
– Within 4 hours for equipment damage
60.2 Investigation Process:
– JCG leads major incident inquiries
– Final report within 30 calendar days




